SOW Truck Exhaust Hose and Reels. Maynard VSAB (1).docx
DOCX document 15 KB Posted
- Attached to
- Vehicle Hoses for Maynard MERS
- Solicitation number
- 70FA5020Q00000007
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAYNARD MERS VSAB
65 Old Marlboro Road, Maynard, MA, 01754
STATEMENT OF WORK
FACILITIES PROJECT-Remove/Replace Truck Exhaust Retractable Reels and Hoses.
BACKGROUND:
The Federal Emergency Management Agency’s (FEMA) MERS MA Detachment Vehicle Storage portion of the VSAB, 30-year-old Truck Exhaust Reels and hoses needs to be replaced. This project includes removal of 15 existing hose reels and hoses, 9 of which will be moved to center of isles between rows of vehicles.
PURPOSE:
1. Purchase 15 Ea. Plymovent SER-850 Hose Reels or equivalent with 33’x 5” hoses, rated at 570 Degrees with a spring clamp nozzle. The hose reel function is a latch and lock type with a spring cassette housing containing a high carbon steel drive spring to retract hose.
2. The Hose reel will be constructed of 11gauge steel or better with side mounting plates supported by a steel channel.
3. The hose reel drum will be 33.5” wide galvanized steel rolled into an 18” dia. and supported by bearings that allow easy rotation.
4. The hose reel drum shall be supplied with a hose tracking bar to guide the hose during recoiling.
5. A safety disconnect assembly will be installed so that the lower hose section can be automatically separated from the upper section in the event the hose becomes entangled with a vehicle.
6. A mechanism will be provided to keep the hose from resting on the floor and can be allowed to be run over by vehicles.
7. Provide labor to remove old, move, and install new hose reels and hoses hanging from ceiling.
8. FEMA will dispose of all Hose Reels scrap metal into recycling waste stream.
9. FEMA will move all vehicles needed to accomplish this project.
PERIOD OF PERFORMANCE
The expected period of performance for this task is expected to be up to 3 months from the date of award.
All work shall be performed during normal work hours of 6:30AM to 3:00 PM Monday through Friday. Any deviations to this schedule must be coordinated and approved by the COR.
File details come from the government source that posted it. Updated .