SOW Tree Trimming HCF Final.docx
DOCX document 19 KB Posted
- Solicitation number
- 697DCK-25-R-00040
About this file
This Statement of Work (SOW) details tree trimming services for the Federal Aviation Administration (FAA) Honolulu Control Facility located at 760 Worchester Ave, Honolulu, Hawaii. The contract covers a base year with four optional extension years, requiring comprehensive tree maintenance for 85 total trees across six species, including coconut, shower, mango, monkey pod, kiawe, and banyan trees. Specific service requirements include annual pruning, removal of dead/dying branches, maintaining 8-foot vertical clearance, trimming near roadways and structures, and ensuring unobstructed views for security cameras and solar panels.
The contractor must comply with strict requirements, including obtaining written approval for equipment, following OSHA safety standards, completing security background checks, and submitting employee lists within ten days of contract award. Services must be performed Monday through Friday between 7:30 AM and 4:00 PM, with all annual tree trimming to be completed within four months of the notice to proceed. Waste disposal must adhere to state and federal regulations, with all debris removed off-site, and FAA dumpsters are prohibited. The solicitation number is 697DCK-25-R-00040, and the opportunity is currently in the pre-solicitation phase under the Department of Transportation Federal Aviation Administration Southwestern Region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Market Survey_697DCK-25-R-00040_Tree Trimming at HCF.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Tree Trimming Services at FAA Honolulu Control Facility
1. SCOPE
This document outlines the requirements for tree trimming services at the Federal Aviation Administration (FAA) property located at 760 Worchester Ave, Honolulu, Hawaii 96818.
2. GENERAL INFORMATION
· Period of Performance: Total Period of Performance will be for a base plus 4 option year contract
· Quality Control:
The contractor must establish and maintain an effective quality control program to ensure compliance with this SOW. A draft Quality Control Plan will be submitted with the proposal, and a final version must be provided within 30 days of contract award.
· Protection of Government Property:
Areas damaged as a result of work must be restored to their original condition, including necessary refinishing or replacement.
· Quality Assurance:
The contractor will provide a plan that will be subject to approval by the FAA COR.
· Invoicing: Will be submitted directly to the electronic invoicing system with a copy to the contracting officers’ representative (COR) and facility point of contact (FPOC) for verification and certification.
· Recognized Holidays:
Services are not required on the following holidays unless specified:
· New Year's Day
· Martin Luther King Jr.’s Birthday
· President’s Day
· Memorial Day
· Juneteenth Day
· Independence Day
· Labor Day
· Columbus Day
· Veteran’s Day
· Thanksgiving Day
· Christmas Day
3. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES
· The Contractor must furnish all necessary materials, equipment, and services to perform work under this contract.
· The Contractor must obtain written approval from the COR or CO for any contractor-owned equipment kept on FAA property.
4. TREE TRIMMING SERVICE REQUIREMENTS
· Trees Involved:
· Coconut Trees: 22
· Shower Trees: 6
· Mango Trees: 4
· Monkey Pod Trees: 4
· Kiawe Trees: 4
· Banyan Trees: 45
· Specific Tasks:
· Coconut/Kamani nut Trees:
· Prune and trim all Coconut trees where the trunks are under 6 feet tall annually.
· Remove loose, dying, and wilted fronds, along with all coconuts.
· Cut and remove coconut trees over 6 feet tall, including stump grinding and landscape restoration.
· Cut and remove all Kamani nut trees, including stump grinding and landscape restoration.
· Trees:
· Prune and trim along the entrance and sides of the roadway and adjacent parking lot.
· Maintain an 8-foot vertical clearance from the ground
· Perform canopy cleanout by removing dead or dying branches.
· Remove branches within 10 feet from any structure such as rooflines, stairs, or tower
· Other plants
· Remove dead or dying material.
· Debris Removal:
· Remove all dead branches and debris from trees near roadways, walkways, and solar arrays, disposing of it off-site.
· Security Camera Clearance:
· Trim trees near security cameras for unobstructed views.
· Solar Panel Clearance:
· Remove branches within 10 feet of solar panels.
5. WASTE DISPOSAL AND CLEAN-UP REQUIREMENTS
· Waste Disposal:
The contractor must maintain a clean work environment and remove all materials requiring disposal during construction. FAA dumpsters cannot be used; all waste must be recycled or disposed of according to State and Federal regulations.
· Other Considerations:
· Compliance with OSHA safety requirements is mandatory.
· Work performed without FAA oversight may be subject to inspection at the contractor's expense.
· Unauthorized work will not be accepted or compensated.
· The contractor must protect existing facilities, equipment, buildings, and vegetation. Damages caused must be repaired at no additional cost.
· The contractor is responsible for all necessary temporary protections during this time.
· Security Requirements:
· Employees must complete security forms for background checks, and a list of employees must be submitted within ten days of contract award.
· Compliance with additional badging requirements may be necessary.
HOURS AND SCHEDULING
· Service Hours:
Services must be conducted Monday through Friday, excluding holidays, between 7:30 AM and 4:00 PM. Work outside these hours requires prior approval.
· Scheduling:
Annual trimming of all trees must be completed within 4 months of the notice to proceed. Subsequent trimming will occur no greater than 14 months apart. Coordination with the COR or FPOC is required two weeks in advance. Scheduling of all tree trimming shall be coordinated 2 weeks in advance to the COR or FPOC for verification and certification.