This is a Statement of Work (SOW) for thermoplastic crosswalk installation services at Coast Guard Base Alameda in Alameda, California. The contractor must install approximately 1,500 linear feet of 12-inch wide white thermoplastic striping and seven "STOP" markings across Coast Guard Island, replacing faded painted crosswalks with more durable and reflective markings. All work must be completed within 60 calendar days from the start date.

The contractor's primary responsibilities include project management with a designated single point of contact, surface preparation by ensuring pavement is dry and free of debris/oil, thermoplastic installation per manufacturer specifications at a minimum thickness of 90mm, replacement of "US GOVERNMENT PROPERTY" property line paint using high-quality road grade paint, and daily site cleanup and debris removal. All submittals, including intended product details and project schedule, must be provided within 10 business days of award for Coast Guard approval. The thermoplastic compound must meet strict specifications including Federal Standard 595 Color #37925 (white), minimum reflective index of 1.5, and 0.09-inch minimum thickness. Road grade paint must comply with TT-P-1952F Type III specifications in blue (Federal Standard 15180 or 15080) with white lettering in 8-12 inch minimum height. All work must comply with MUTCD, UFC 3-201-01, Coast Guard Safety and Environmental Health Manual (COMDTINST M5100.47), and OSHA regulations. Contractor personnel require background checks, Real ID-compliant identification, and base access approval submitted 72 hours prior to work. Work hours are 7:00 AM to 5:00 PM, Monday through Friday, excluding Federal Holidays. The contractor is responsible for hazardous material handling, environmental protection including prevention of chlorinated water and paint chips from entering storm drains, and final payment is contingent upon USCG Contracting Officer's Representative approval following final inspection with all deficiencies corrected. The primary Coast Guard technical point of contact is LCDR Bethany Stafford, with Ms. Aleta Beekmann as secondary contact.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) for Thermoplastic Crosswalk Installation at Coast Guard Base Alameda

Coast Guard Island, Alameda, CA

1. INTRODUCTION/BACKGROUND

This Statement of work (SOW) defines the requirements for a contractor to provide all necessary labor, materials, and equipment to install thermoplastic crosswalks that shall replace specific crosswalks on Coast Guard Island. Work includes installing approximately 1,500 linear feet (LF) of 12" wide striping and installing seven (7) "STOP" markings as designated across the island. The contractor shall be responsible for all aspects of the project as detailed in this document and in accordance with all applicable industry standards and USCG regulations.

2. OBJECTIVE

The primary objective is replace faded painted crosswalks and street markings with more durable and reflective thermoplastic markings.

3. SCOPE OF WORK

3.1 Tasks

The contractor shall:

Task 1: Project Management

Designate a single point of contact for all project communications.

Coordinate all work with USCG Contracting Officer’s Representative (COR) or designated POC.

Task 2: Surface Preparation

Ensure pavement is dry and free of debris/oil before application of paint products.

Remove old markings if required by industry standard.

Task 3: Thermoplastic Installation

Install per manufacturer’s instructions.

Apply Thermoplastic at minimum thickness of 90mm.

Task 4: Government Property Line Paint Replace “US GOVERNMENT PROPERTY” property line and lettering at

Oakland side of causeway.

Use high-quality road grade paint for high visibility and durability.

Task 5: Site Cleanup and Restoration Upon completion, and on a daily basis, remove all construction materials and debris, disposing of them off site.

3.2 Submittals

The contractor shall submit the following for Coast Guard Approval before getting approval to start work. All submittals shall be provided to the Coast Guard within 1O business days of award.

Intended product details.

Intended Project Schedule - contractor shall provide initial written project schedule to Coast Guard Technical Representative indicating intended series of tasks. If the schedule changes throughout the project the contractor shall keep the Coast Guard Technical Representative updated.

4. PERIOD OF PERFORMANCE

All work shall be complete within 60 calendar days from the start date.

5. LAYDOWN AND MATERIAL STORAGE

The Coast Guard POC will coordinate an appropriate amount of storage space as necessary for equipment and material storage during the project. The contractor is responsible for maintaining the security of this space and their equipment. This space shall be kept tidy at all times.

6. TECHNICAL REQUIREMENTS

6.1 Codes and Standards

All work shall comply with the most current editions of all applicable federal, state, and local codes, all applicable industry standards, and Coast Guard specific standards. All work shall comply with:

Manual on Uniform Traffic Control Devices (MUTCD)

UFC 3-201-01

U.S. Coast Guard Safety and Environmental Health Manual, COMDTINST

M5100.47(series) OSHA Regulations

6.2 Materials and Workmanship

All materials shall be new and conform to the specifications detailed in the table below:

Striping Compound High Performance/Durability Thermoplastic Compound with the following minimum specifications:

Minimum Thickness: 0.09"

Color: Federal Standard 595 Color#37925 (white)

Minimum Reflective Index: 1.5

Prepare and install as recommended by manufacturer.

Include resin primer as required.

Road Grade Paint High Durability/Highly Visible Blue Paint with Black

Lettering with following specification:

Base Specification: TT-P-1952F, Type Ill (High Build Waterborne) or equivalent

Blue Color: Federal Standard 595 / AMS-STD-595 Color Code 15180 (Blue) or 15080 Handicap/Safety Blue

White Color: AMS-STD-595 I FED-STD-595 Color Code 17925 (Gloss White) or 37925 (Flat White).

Application Wet Thickness: 25 - 30 wet mils

Reflective: Fed Spec TT-B-1325D Type I or IV Glass Beads

Lettering shall be White and be block stenciled FHWA Series B or C with a minimum Height of 8-12 inches.

7. PERSONNEL SECURITY AND BASE ACCESS

7.1 Background Checks: All contractor personnel requiring access to the USCG facility must successfully pass a background check as required by USCG security policies, which may include a National Crime Information Center (NCIC) check. The contractor shall submit personnel information to the USCG COR 14 days prior to the project start date.

7.2 Access Request: For access to the USCG facility, the contractor is required to submit the name and birthdate for each employee on the approved access request form at least 72 hours before their first day on site (this form will be provided after award).

Personnel not listed may be denied access to the Coast Guard facility.

7.3 Identification: A Real ID-compliant driver's license or other federally approved identification is required for base access. Acceptable forms of ID include US Government Dependent ID, Federal PIV Card, TWIC Card, Veteran Health Identification Card, US Passport, or Permanent Resident Card. Driver's licenses from states that are not Real ID compliant will not be accepted.

7.4 Vehicle Requirements: All contractor vehicles must have valid registration and insurance, and all vehicle operators must have a valid driver's license. Vehicles shall always stay on marked and paved roads -vehicles are not permitted to drive or park on the grass at any point in this project performance without written approval from the Coast Guard. Any damage from driving or parking on the grass, to include the sprinkler system, shall be the responsibility of the contractor to repair.

7.5 Conduct: Contractor personnel shall adhere to all base regulations, traffic laws, and security protocols. Contractors must wear company identifying clothing/badging/safety gear, and all contractor vehicles must display company or subcontractor decals.

8. WORK HOURS

Work shall be performed between the hours of 7:00 AM and 5:00 PM, Monday through Friday, excluding Federal Holidays, unless otherwise approved in writing by the Contracting Officer, COR or USCG POC.

9. SAFETY AND ENVIRONMENTAL PROTECTION

All operations must comply with the USCG Safety and Environmental Health Manual, COMDTINST M5100.47 (series). The contractor is responsible for proper handling and disposal of any hazardous materials and for immediately reporting and containing any spills.

The Coast Guard's storm water permit does not allow fresh (chlorinated)water, paint chips and other debris to go into the storm drains. If scraping, power washing, etc. is required to complete the work, the contractor must either use unchlorinated water or take other preventive measures (drain swaddles). Debris must be cleaned off the road surface/gutters daily.

10. GOVERNMENT FURNISHED SERVICES

The Government may furnish potable water and electrical power at no cost to the contractor where available. All electrical connections shall be in accordance with the National Electric Code. The contractor shall provide and use ground fault circuit interrupter (GFCI) devices when connecting to Government power sources.

11. ACCEPTANCE CRITERIA

Final acceptance of the work will be granted by the USCG COR after a final inspection confirms that all tasks in this SOW have been completed, the installation meets all technical and safety standards, and the site has been fully restored. Final payment will not be released until all deficient items have been corrected.

12. COAST GUARD TECHNICAL POINT OF CONTACT

Primary POC for this Task is: LCDR Bethany Stafford

Secondary POC for this Task is: Ms. Aleta Beekmann

File details come from the government source that posted it. Updated .