SOW_TERRAPIN FY25_UWHullCleanInsp_87WPB.doc
DOC document 426 KB Posted
- Attached to
- U/W body inspection
- Solicitation number
- 52000QR250029518
About this file
This Statement of Work (SOW) details underwater hull cleaning and inspection requirements for the US Coast Guard Cutter TERRAPIN at the USCG Base in Ketchikan, Alaska. The contract is a total small business set-aside for a commercial item, with performance scheduled between 25 August 2025 and 12 September 2025. The contractor must provide a certified diving team to conduct a comprehensive underwater inspection and cleaning of vessel components including hull plating, shafts, transducers, propellers, rudders, sea chests, and other appendages, using specific fouling and paint deterioration rating systems to document vessel condition.
Key technical requirements include: providing a certified diver and support team, obtaining vessel crew clearance before diving, conducting pre-clean biofouling inspections, performing detailed hull component assessments, cleaning underwater surfaces without damaging coatings, and submitting video documentation of before and after conditions. The contractor must use hand-held brushes for transducer cleaning, follow specific safety protocols, and complete multiple detailed inspection forms documenting marine growth, paint condition, cathodic protection system status, and any observed hull damage. The solicitation is being processed as a firm-fixed price purchase order using simplified acquisition procedures.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
CGC TERRAPIN U/W Body, Diver Clean and Inspect
PR# 52000PR250029518
1. Scope
1.1 Intent. This work item describes the requirements for the Contractor to inspect and clean the vessel’s underwater (U/W) body, while the vessel is moored pier side. Affected surfaces or components include, but are not limited to the following:
· Hull plating.
· Shafts.
· Transducers
· Propellers.
· Rudders.
· Sea chests and gratings.
· Miscellaneous appendages (examples: bilge keels, rope guards, and fairwaters).
PERIOD OF PERFORMANCE
The period of performance is requested to be completed between 25 August 2025 – 12 September 2025.
PLACE OF PERFORMANCE
The primary place of performance shall be at the below location/address.
CGC TERRAPIN
USCG Base Ketchikan
1300 Stedman St.
Ketchikan, AK 99901
Cutter Point of Contact:
MKC Aaron Wills, Engineer Petty Officer
Cell: (360) 477-2380 Email: Aaron.S.Wills@uscg.mil Contracting Officer Technical Representative (COR)
CWO Jim Beechey
Office: (757) 628-4632
Email: James.E.Beechey@uscg.mil
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 87 WPB 085-013, Rev B, Docking Plan
Coast Guard Drawing 87 WPB 111-001, Rev H, Shell Expansion
Coast Guard Drawing 87 WPB 161-001, Rev C, Skeg Construction
Coast Guard Drawing 87 WPB 243-003, Rev -, Propulsion Shaft Details
Coast Guard Drawing 87 WPB 562-001, Rev A, Rudder Details
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Other References
Code of Federal Regulations (CFR) Title 29, Part 1910, Subpart T, 2011, Commercial Diving Operations
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not Applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.1.5 Dive notification. The Contractor must provide the Coast Guard Inspector 24 hours advance notice of when the diver inspection will occur. Before diving procedures commenced, meet with the Cutter EPO, to discuss diving safety requirements and the securing of cutter machinery, as applicable.
3.2 Pre-diving requirements.
3.2.1 The Contractor must, in accordance with 29 CFR 1910.401-440, provide a certified diver and a tender team, as well as necessary support personnel and equipment, to accomplish the tasks specified herein.
WARNING
Mixed gas diving and live boating are not permitted.
3.2.2 The Contractor must ensure that the diving team must obtain clearance from the Officer-of-the-Deck (OOD) before beginning diving operations. Ensure the Coast Guard has capability for maintaining continuous two-way communication with diving personnel at all times, during the performance of this work item.
3.3 Inspection requirements. Using the drawings listed in Section 2 as guidance, the Contractor must perform the following inspections and fill out forms provided in Section 4.
3.3.1 Conduct a pre-clean biofouling inspection. Fill out Form 4-1, including fouler rating for each component (see Table 1 for fouler rating descriptions).
NOTE:
When completing the fouler rating, ensure that all (100%) of the area of the component/surface being inspected has a fouler rating. For example, if only 50% of the rudder has growth at a FR-20 rating, then there should be another rating on the rudder that is FR-0 rating over 50% of the area. All ratings should equal 100% of the area/component being inspected.
Table 1 - fouling ratings (Fr) in order of increasing severity
| type |
| fouling rating (FR) |
| description |
| Soft |
| 0 |
| A clean, foul-free surface; red and/or black AF paint or a bare metal surface. |
| Soft |
| 10 |
| Light shades of red and green (incipient slime). Bare metal and painted surfaces are visible beneath the fouling. |
| Soft |
| 20 |
| Slime as dark green patches with yellow or brown colored areas (advanced slime). Bare metal and painted surfaces may be obscured by the fouling. |
| Soft |
| 30 |
| Grass as filaments up to 3 inches (76 mm) in length; projections up to ¼ inch (6.4 mm) in height; a flat network of filaments, green, yellow, or brown in color; or soft, non-calcareous fouling such as sea cucumbers, sea grapes, or sea squirts projecting up to ¼ inch (6.4 mm) in height. The fouling cannot be easily wiped off by hand. |
| Hard |
| 40 |
| Calcareous fouling in the form of tubeworms less than ¼ inch in diameter or height. |
| Hard |
| 50 |
| Calcareous fouling in the form of barnacles less than ¼ inch in diameter or height. |
| Hard |
| 60 |
| Combination of tubeworms and barnacles, less than ¼ inch (6.4 mm) in diameter or height. |
| Hard |
| 70 |
| Combination of tubeworms and barnacles, greater than ¼ inch in diameter or height. |
| Hard |
| 80 |
| Tubeworms closely packed together and growing upright away from surface. Barnacles growing one on top of another, ¼ inch or less in height. Calcareous shells appear clean or white in color. |
| Hard |
| 90 |
| Dense growth of tubeworms with barnacles, ¼ inch or greater in height; calcareous shells brown in color (oysters and mussels); or with slime or grass overlay. |
| Composite |
| 100 |
| All forms of fouling present, soft and hard, particularly soft sedentary animals without calcareous covering (tunicates) growing over various forms of hard growth. |
TABLE 2 - PAINT DETERIORATION RATINGS (PDR) FORANTIFOULING/ANTICORROSION (AF/AC) PAINT SYSTEM
| PAINT DETERIORATION RATING (PDR) |
| DESCRIPTION |
| 10 |
| AF paint intact, red in color or with mottled pattern of light green and red. |
| 20 |
| AF paint missing from edges, corners, seams welds, river or boll head to expose AC paint. |
| 30 |
| AF paint missing from slightly curved or flat areas to expose AC paint. |
| 40 |
| AF paint missing from intact blisters to expose AC paint. |
| 50 |
| AF blisters ruptured to expose intact AC paint. |
| 60 |
| AF/AC paint missing or peeling to expose steel substrate, no corrosion present. |
| 70 |
| AF/AC paint removed from edges, corners, seams, welds, river or bolt heads to expose steel substrate with corrosion present. |
| 80 |
| Ruptured AF/AC blisters on slightly curved or flat surfaces with corrosion stains present. |
| 90 |
| Area corrosion of steel substrate with no AF/AC paint cover due to peeling or abrasion damage. |
| 100 |
| Area corrosion showing visible surface evidence of pitting, scaling, and roughening or steel substrate. |
3.3.2 Conduct diver hull inspection. Fill out Form 4-2. Complete any additional inspection forms as required to document underwater component damage (Forms 4-2, 4-3, and 4-4). See Table 2 for description of Paint Deterioration Ratings (PDR’s).
3.4 Cleaning requirements. The Contractor must employ suitable means to clean the U/W body surfaces free of all marine growth, debris, and all other surface contaminants as detected during biofouling inspection. The Contractor must ensure the following:
3.4.1 Ensure all transducer surfaces are cleaned with only hand held brushes, without the use of power attachments.
3.4.2 Ensure that existing u/w body coating system or non-coated surfaces do not incur any damage during cleaning process.
3.5 Additional documentation requirements. The Contractor must submit video highlights of underwater body surfaces (e.g. bow thruster, propellers, rudders, transducers, heavily fouled hull areas, etc.) before and after cleaning. Place linear measuring devices, as applicable, in the field of view when videotaping hull damages, to provide scale for these damages.
4. NOTES
4.1 Unit responsibilities. The ship's force will tag-out and secure the following:
· All propulsion machinery and shafting and all steering machinery whenever the diver is in the water.
· All underwater body transducers, including the sonar equipment, for the duration of the underwater hull cleaning operation.
· All active cathodic protection equipment for the duration of the hull cleaning operation.
· Each sea suction while the diver is inspecting the sea suction's sea chest strainer.
4.2 Inspection forms. (See following pages)
FORM 4-1. PRE-CLEAN BIOFOULING INSPECTION DATA
| VESSEL NAME: |
| HULL TYPE / NUMBER |
| LOCATION (CITY) |
| DATE (mm/dd/yy) |
| PRODUCT LINE: |
| INSPECTING ACTIVITY |
| VISIBILITY (ft) |
| LOCATION OF LAST DRYDOCKING |
| UNDOCKING DATE |
| LOCATION OF LAST PAINTING |
| DATE |
PAINT
TYPE: ANTIFOULING: ANTICORROSION:
| DATE OF THE LAST WATERBORNE FULL HULL CLEANING |
| DATE OF THE LAST WATERBORNE INTERIM CLEANING |
| UNDERWATER PHOTOGRAPHS TAKEN □ YES □ NO |
| VIDEO TAKEN □ YES □ NO |
| COMPONENTS |
| ( CHECK IF: ) |
N/A NOT INSPECTED
( PERCENTAGES MUST ADD UP TO 100 )
FOULING RATING FOULING RATING FOULING RATING
PROPELLER Centerline
| FR- % |
| FR- % |
| FR- % |
Port Outboard
| FR- % |
| FR- % |
| FR- % |
Port Inboard
| FR- % |
| FR- % |
| FR- % |
Starboard Inboard
| FR- % |
| FR- % |
| FR- % |
Starboard Outboard
| FR- % |
| FR- % |
| FR- % |
SHAFT Centerline
| FR- % |
| FR- % |
| FR- % |
Port Outboard
| FR- % |
| FR- % |
| FR- % |
Port Inboard
| FR- % |
| FR- % |
| FR- % |
Starboard Inboard
| FR- % |
| FR- % |
| FR- % |
Starboard Outboard
| FR- % |
| FR- % |
| FR- % |
RUDDER Centerline
| FR- % |
| FR- % |
| FR- % |
Port
| FR- % |
| FR- % |
| FR- % |
Starboard
| FR- % |
| FR- % |
| FR- % |
SONAR DOME Port Side
| FR- % |
| FR- % |
| FR- % |
Starboard Side
| FR- % |
| FR- % |
| FR- % |
SEA CHEST Typical
| FR- % |
| FR- % |
| FR- % |
BOW Port
| FR- % |
| FR- % |
| FR- % |
Starboard
| FR- % |
| FR- % |
| FR- % |
SIDES Port
| FR- % |
| FR- % |
| FR- % |
Starboard
| FR- % |
| FR- % |
| FR- % |
BOTTOM Port
| FR- % |
| FR- % |
| FR- % |
Starboard
| FR- % |
| FR- % |
| FR- % |
STERN Port
| FR- % |
| FR- % |
| FR- % |
Starboard
| FR- % |
| FR- % |
| FR- % |
TRANSOM Port
| FR- % |
| FR- % |
| FR- % |
Starboard
| FR- % |
| FR- % |
| FR- % |
Signature (Ship’s Engineer):_______________________________________________________
Signature (Diving Supervisor):______________________________________________________
FORM 4-2. DIVER HULL INSPECTION DATA
| VESSEL NAME: |
| HULL TYPE / NUMBER |
| LOCATION (CITY) |
| DATE (mm/dd/yy) |
| PRODUCT LINE: |
| INSPECTING ACTIVITY |
| VISIBILITY (ft) |
| LOCATION OF LAST DRYDOCKING |
| UNDOCKING DATE |
| LOCATION OF LAST PAINTING |
| DATE |
PAINT
TYPE: ANTIFOULING: ANTICORROSION:
| DATE OF THE LAST WATERBORNE FULL HULL CLEANING |
| DATE OF THE LAST WATERBORNE INTERIM CLEANING |
| UNDERWATER PHOTOGRAPHS TAKEN □ YES □ NO |
| UNDERWATER COLOR VIDEO TAKEN □ YES □ NO |
UNDERWATER WORK ACCOMPLISHED THIS DATE
□ FULL CLEAN
□POLISH
□MULTI-BRUSH
□INSPECT
□PAINT
□INTERIM
□HYDRO
□HAND-HELD
□REPAIR
□OTHER__________________________________
1.
HULL COATING SYSTEM (PDR___________)
a.
ANTIFOULING PAINT
PERCENTAGE REMAINING________________
PERCENT REJUVENATION________________
IS THE A/F □ HARD □ SOFT
PERCENTAGE
__________ PEELING
__________ LOCALIZED or
__________ GENERAL
__________ BLISTERING
__________ ABRASION
__________ GENERAL
CONDITION SUMMARY [ IF PAINT DAMAGE IS LOCALIZED, GIVE LOCATION(s) ] b)
ANTICORROSION PAINT
PERCENTAGE REMAINING _______________
PERCENTAGE
__________ PEELING
__________ BLISTERING
__________ ABRASION
__________ GENERAL
CONDITION SUMMARY [ IF PAINT DAMAGE IS LOCALIZED, GIVE LOCATION(s) ] c)
DOCKING BLOCK AREAS (PDR _________)
AVERAGE PERCENTAGE OF BLOCK AREAS PAINTED ____________________ %
BARE METAL PITTING ____________________ % __________________ IN. DIAMETER ____________________ IN. DEEP
CONDITION SUMMARY [ IF PAINT DAMAGE IS LOCALIZED, GIVE LOCATION(s) ]
FORM 4-2. DIVER HULL INSPECTION DATA (CONTINUED)
2.
CATHODIC PROTECTION SYSTEM
a. SACRIFICIAL ANODES (ZINCS)
AVERAGE PERCENTAGES OF ANODES REMANING ____________________ %
ANODES ARE:
□ UNIFORMLY WASTED
□ WASTAGE GREATEST IN FOLLOWING AREAS:
ANODES ARE :
□ WELDED
□ BOLTED
□ BOTH
NUMBER AND LOCATION OF ANY ANODES MISSING OR INACTIVE:
MISSING___________________________________________________
INACTIVE__________________________________________________
b.
IMPRESSED CURRENT □ NOT APPLICABLE
□ DAMAGE NOTED ON ATTACHED DRAWING
(Port/Stbd)
(FRAME ____________________ )
□ WIRES LOOSE, BROKEN, OR MISSING
□ CAPASTIC SHIELD DAMAGE
□ INSULATORS LOOSE OR DAMAGED
□ OTHER
3. GENERAL HULL DAMAGE (HULL PLATING, BILGE KEELS, etc.):
4.
HULL PENETRATIONS (PDR _________)
_______________ % CLOGGED WITH MARINE GROWTH (POST CLEAN)
_______________ % BARE METAL (AREA SURROUNDING PENETRATION)
_______________ % BARE METAL PITTING
AVERAGE PIT SIZE: _______________ in. DIAMETER, _______________ in. DEPTH
CONDITION SUMMARY: ___________________________________________________
FORM 4-2. DIVER HULL INSPECTION DATA (CONTINUED)
5.
SONAR DOME □ NOT APPLICABLE
□ NO VISIBLE DAMAGE □ DAMAGE NOTED ON ATTACHED DRAWING □ CUTS
□ LAYER SEPARATION □ WIRE PILES EXPOSED
6.
PROPULSION SHAFTING
VISIBLE BARE METAL □ YES □ NO
RUST BLEEDING □ YES □ NO
PITTING □ YES □ NO
CONDITION SUMMARY (TYPE OF DAMAGE, LOCATION AND SIZE):
7.
STRUTS AND BEARING HOUSING
PERCENT BARE METAL:
STARBOARD
PORT
MAIN
INTERMEDIATE
PDR
CONDITION OF STRUT LEADING AND TRAILING EDGES: ______________________________________
CONDITION OF ROPE GUARDS: __________________________________________________
CONDITION OF FAIRWATERS: ___________________________________________________
8.
RUDDERS
□ NO DAMAGE
□ DAMAGE SHOWN ON ATTACHED DRAWINGS
STARBOARD
PORT
PERCENT BARE METAL
PDR
ACCESS PLATES INTACT?
□ YES □ NO
□ YES □ NO
WAS RUDDER SOUNDED?
□ YES □ NO
□ YES □ NO
ANY SIGNS OF FLOODING?
□ YES □ NO
□ YES □ NO
ANY SIGNS OF DROPPING?
□ YES □ NO
□ YES □ NO
CONDITION SUMMARY:
9.
PROPELLERS
□ NO DAMAGE □ DAMAGE SHOWN ON ATTACHED DRAWINGS
PROP #1:
NICKS __________
CURLS __________
CRACKS – LARGEST CRACK LENGTH __________ in.
PROP #2:
NICKS __________
CURLS __________
CRACKS – LARGEST CRACK LENGTH __________ in.
PROPELLERS NUMBERED STARBOARD TO PORT.
Diving Supervisor: ___________________________________________
Ship’s Engineer: _________________________________
FORM 4-3. PROPELLER VISUAL INSPECTION FORM
Pressure Face Suction Face
Contractor inspector (written/signature): /
USCG (written/signature): / form 4-4. port and starboard rudder inspection data
File details come from the government source that posted it. Updated .