SOW TE1 WJHTC Radio Contract Deliverables.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- 692M15-22-R-00007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 Pricing Schedule 3-4-2022.xlsx | XLSX spreadsheet | |
| Attachment 1 SOW 3-4-2022.pdf | ||
| SOW TE5 WJHTC Radio Contract WAF.xlsx | XLSX spreadsheet | |
| SOW TE2 WJHTC Radio Contract Inventory.xlsx | XLSX spreadsheet | |
| Attachment 4 Contractor Staffing Access Questionnaire 2-24-2022.doc | DOC document | |
| Attachment 3 SCA WD 2015-4189 Rev 20 3-15-2022.pdf | ||
| SOW TE4 WJHTC Radio Contract PM Schedule.xlsx | XLSX spreadsheet | |
| SOW TE3 WJHTC Radio Contract Updates.xlsx | XLSX spreadsheet | |
| SIR 692M15-22-R-00007 4-14-2022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FAA - William J. Hughes Technical Center - Radio Services Contract | |||||
| TECHNICAL EXHIBIT 1 | |||||
| Schedule of Deliverables | |||||
| Item # | Description | SOW Reference | Due By | Recurrence | Required Format |
| 1 | List of personnel requiring AOA Training | 3.2.1 | 14 calendar days after contract award | As needed | N/A |
| 2 | Archibus Training | 3.2.2 | 30 calendar days after contract award | As needed | N/A |
| 3 | Government Furnished Facility (GFF) Walkthrough Report | 5.2.1 | 10 business days after walkthrough | N/A | Microsoft Excel |
| 4 | Safety Data Sheets (SDS) | 6.2 | 7 calendar days after contract award | As needed | N/A |
| 5 | Key Personnel Contact Info | 6.6 | 10 business days after contract award | As needed | N/A |
| 6 | Quality Control Report Template | 6.7.1 | 14 calendar days after contract award | N/A | N/A |
| 7 | Quality Control Report | 6.7.1 | 7th of each month | Monthly | Approved QC Report Template |
| 8 | Updated Equipment List | 7.1 a) | 60 calendar days after contract award | N/A | TECHNICAL EXHIBIT 2 |
| 9 | Redlined Single-Line Drawings | 7.1 b) | 60 calendar days after contract award | N/A | CAD (or acceptable substitute) |
| 10 | Updated Single-Line Drawings | 7.1 b) | 60 calendar days after contract award | N/A | CAD (or acceptable substitute) |
| 11 | Inventory List and Single-Line Drawings | 7.1.1 | 30 calendar days after action | As needed | TECHNICAL EXHIBIT 2, CAD (or acceptable substitute) |
| 12 | System Update Report | 7.1.1 | 30 calendar days after action | As needed | TECHNICAL EXHIBIT 3 |
| 13 | Preventive Maintenance Schedule | 7.3 | 30 calendar days after contract award | As needed | TECHNICAL EXHIBIT 4 |
| 14 | Preventive Maintenance Records | 7.3.3 | COB Monday | Weekly | TBD |
| 15 | Sample PM Card | 7.3.4 | 14 calendar days after contract award | N/A | N/A |