CGC Mobile Bay Bilge Cleaning Statement of Work In accordance with PR
Bilge cleaning is required onboard CGC Mobile Bay and bilge liquids may need removal.
Location:
U.S. Coast Guard Station Sturgeon Bay 36 South Neenah Ave, Sturgeon Bay Wisconsin, 54235 Cleaning
The following bilges need to be high pressure cleaned with degreaser to remove all oil, grease and other surface contaminants from deck plates down. Please ensure not to damage any electrical components or engines components. Ship will be pier side so ensure that we follow Sturgeon Bay, WI environmental standards. Initial (code B) cleanings for both the ballast tank and bilges will take place on Roughly early April, final (code A) bilge cleanings will take place on Roughly early June to ensure clean bilges. The ballast tank will not receive a code A cleaning. This will be two separate cleanings.
Tank Cleaning Capacity (Gallons)
Ballast 2-76-3-W 1360
Bilges Capacity (SQFT)
| Engine Room | 1700 | |
| Motor Room 4-61-0-E | 900 | |
| Strainer Room 4-45-0-Q | 680 | |
| Aft Steering | 100 |
Bilge Liquid Removals 1000 Gallons
Bilge Cleaning Conditions: All of the aforementioned bilges are to be cleaned in accordance with the following USCG Yard cleanliness conditions.