SOW Swimming Pool Water Feature 2026.docx

DOCX document 9 MB Posted

Attached to
U. S. Consulate Merida - Swimming Pool and Water Feature Cleaning and Maintenance Services
Solicitation number
19MX5226Q0018
Issued by

About this file

This is a Statement of Work (SOW) for preventive maintenance services for the swimming pool and water feature at the U.S. Consulate General in Merida, Mexico, issued for April 2026. The contract is a firm fixed-price agreement with a 12-month base year and four one-year renewal options, for a total potential period of five years. The contractor must provide all labor, materials, tools, equipment, overhead, and profit, with VAT priced separately as a distinct line item. Pricing is structured by contract line items (CLINs) with monthly unit prices multiplied by 12 months for each contract period; specific dollar amounts are not populated in the SOW template. The contractor is required to maintain the swimming pool and water feature in safe, reliable, and efficient operating condition through scheduled preventive maintenance performed Monday through Friday between 7:30 AM and 4:30 PM, with weekend work possible depending on operational needs.

The Performance Work Statement requires twice-weekly maintenance including debris collection, pool vacuuming, visual inspections, water level monitoring, chlorine tablet management, furniture and glass cleaning, strainer inspection, pressure gauge monitoring, and comprehensive water testing with chemical adjustments to maintain OBO safety parameters for pH (7.2-7.6), total alkalinity (80-100 ppm), free chlorine (1.0-3.0 ppm), and cyanuric acid (30-60 ppm). Monthly duties include written reporting and tile/wall cleaning; quarterly tasks include filter inspection and cleaning. All chemicals must be EPA and NSF certified with approved MSDS documentation; no liquid chlorine is permitted, and limited on-site chemical storage requires COR approval. The contractor must submit a maintenance plan within 10 days of award, provide trained technicians with security clearances, designate a supervisor fluent in English, and deliver monthly invoices accompanied by signed maintenance checklists. Insurance requirements include public liability coverage of $10,000 property damage and $100,000 cumulative. The contract establishes a quality assurance performance standard of no more than one customer complaint per month, with the COR and A/COR as the designated government contacts. Notice to Proceed will be issued after acceptable insurance certificates, license copies, and personnel background checks are submitted, with performance beginning a minimum of 10 days after contract award unless the contractor agrees to an earlier date.

View the file

Other files

File Type Posted
Cover Swimming Pool Cleaning Service.docx DOCX document
SF1449 Swimming Pool.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Consulate Merida UNCLASSIFIED

STATEMENT OF WORK FOR PREVENTIVE MAINTENANCE SERVICE

SWIMMING POOL & WATER FEATURE MAINTENANCE

United States Consulate General Merida, Mexico

April 2026

TABLE OF CONTENTS

Section

1. DESCRIPTION

2. PRICING

3. NOTICE TO PROCEED

4. EQUIPMENT AND PERFORMANCE REQUIREMENTS

5. HOURS OF PERFORMANCE

6. ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT

7. SCHEDULED PREVENTIVE MAINTENANCE

8. PERSONNEL, TOOLS, CONSUMABLE MATERIALS AND SUPPLIES

9. DELIVERABLES

10. INSURANCE REQUIREMENTS

11. LOCAL LAW REGISTRATION

12. QUALITY ASSURANCE PLAN (QAP)

13. TRANSITIONS/CONTACTS

14. SUBMISSION OF INVOICES

Attachments

EXHIBIT A - PERFORMANCE WORK STATEMENT

1. DESCRIPTION

The US Consulate in Merida requires preventative maintenance services for the swimming pool and water feature located within the Consulate Compound. These services shall ensure all systems being serviced under this agreement are always in good operational condition.

1.1 Type of Contract

The contract type is a firm fixed price contract. The price listed below shall include all managerial, administrative, and direct labor, materials, insurance, (see FAR 52.228-4 and 52.228-5) overhead, profit, and VAT.

The Government will pay the Contractor the fixed price per month for standard services that have been satisfactorily performed and received by the Contracting Officer (CO) or the Contracting Officer’s Representative (COR) or Assistant Contracting Officer Representative (A/COR), along with required reports and paperwork including proper invoice. Orders will be placed by a firm-fixed price purchase order.

1.2 Period of Performance

The performance period of this contract is from the star date in the Notice to Proceed and continuing for 12 months, with four (4), one-year options to renew. The initial period of performance includes any transition period authorized under the contract.

The Contracting Officer may also extend this contract for an additional six (6) months, if required by the Government, in accordance with the FAR clause 52.217-8 Option to Extend Services, in Section 2 of this contract.

2. PRICING

This is a firm fixed price contract with a base year and four (4) one-year options.

(a)The Contractor shall provide the supplies or services for the base period of the contract at the rates shown below and any option years exercised by the Government.
(c)The prices listed below shall include all labor, materials, overhead, and profit. The Government will not pay any additional expenses.

(d) VALUE ADDED TAX. (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate amount in the contract and on the invoices. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion.

2.1 Base Year. The contractor shall provide the services show below for base Year of the contract for a period of 12 months.

CLIN
Description
Unit of Measure
Month
Unit Price
Sub-Total
001
Swimming Pool & Water Feature Maintenance Services as stated under the Performance Work Statement.
Month
12
$
$

VAT

Total Price

2.2 Option Year 1. The contractor shall provide the services show below for OY 1 of the contract for a period of 12 months.

CLIN
Description
Unit of Measure
Month
Unit Price
Sub-Total
101
Swimming Pool & Water Feature Preventive Maintenance Services as stated under the Performance Work Statement.
Month
12
$
$

VAT

Total Price

2.3 Option Year 2. The contractor shall provide the services show below for OY 2 of the contract for a period of 12 months.

CLIN
Description
Unit of Measure
Month
Unit Price
Sub-Total
201
Swimming Pool & Water Feature Maintenance Services as stated under the Performance Work Statement.
Month
12
$
$

VAT

Total Price

2.4 Option Year 3. The contractor shall provide the services show below for OY 3 of the contract for a period of 12 months.

CLIN
Description
Unit of Measure
Month
Unit Price
Sub-Total
301
Swimming Pool & Water Feature Maintenance Services as stated under the Performance Work Statement.
Month
12
$
$

VAT

Total Price

2.5 Option Year 4. The contractor shall provide the services show below for OY 4 of the contract for a period of 12 months.

CLIN
Description
Unit of Measure
Month
Unit Price
Sub-Total
401
Swimming Pool & Water Feature Maintenance Services as stated under the Performance Work Statement.
Month
12
$
$

VAT

Total Price

2.6 Total of all five years: Base Year: $__________________

OY 1: $__________________

OY 2: $__________________

OY 3: $__________________

OY 4: $__________________

Total: $__________________

3. NOTICE TO PROCEED

After Contract award and submission of acceptable insurance certificates and copies of all applicable licenses and permits, (and personnel background checks) the Contracting Officer will issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of ten <10> days from date of Contract award unless the Contractor agrees to an earlier date) on which performance shall start.

4. EQUIPMENT AND PERFORMANCE REQUIREMENTS

4.1. The American Consulate of Merida requires the Contractor to maintain the following equipment in a safe, reliable, and efficient operating condition. Please see equipment list included in Exhibit A for a more detailed description.

4.2. The Contractor shall provide all necessary managerial, administrative, and direct labor personnel, as well as all transportation, equipment, tools, supplies, and materials required to perform inspection, maintenance, and component replacement as required to maintain the systems in accordance with this work statement. Under this Contract the Contractor shall provide:

The services of trained and qualified technicians to inspect, adjust, and perform scheduled preventive maintenance.

4.3. Performance Standards

The equipment shall be clean and in good operating condition upon completion of the service. The preventive maintenance service shall result in the parts of the system serviced being in a condition to operate efficiently and effectively.

5. HOURS OF PERFORMANCE

The Contractor shall maintain work schedules of their maintenance employees. The schedules shall take into consideration the hours that the staff can effectively perform their services without placing a burden on the security personnel of the Consulate. The Contractor shall deliver standard services between the hours of 7:30 AM and 4:30 PM Monday through Friday. Depending on operating conditions, some events could be scheduled during weekend.

6. ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT

6.1 General. The Contractor shall designate a representative who shall supervise the Contractor’s technicians and be the Contractor’s liaison with the American Consulate of Merida. The Contractor’s employees shall be on-site only for contractual duties and not for any other business or purpose. Contractor employees will be given access to the equipment and equipment areas and will be escorted by Consulate personnel.

6.2 Personnel Security. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual. The contractor shall provide RSO Security Certifications with full names, dates of birth, places of birth, current addresses, and police clearances on all contractor personnel who to be used on this Contract. Submission of information shall be made within 10 days of award of contract. No technician will be allowed on site without prior authorization. Note: this may include cleared personnel if advance notice of visit is not given at least one week before the scheduled visit.

6.2.1 IDENTITY CARDS

Government shall issue identity cards to Contractor personnel, after they are approved. Contractor personnel shall always display identity card(s) on the uniform while providing services under this contract. These identity cards are the property of the US Government. The Contractor is responsible for their return at the end of the contract, when an employee leaves Contractor service, or at the request of the Government. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual.

6.3 Vehicles. Contractor vehicles will not be permitted inside the compound without prior approval. If vehicle access is necessary, submit contractor vehicle information (Make, Model, License Plate #) along with a written justification as to why access is necessary. This shall be submitted to the Facility Manager at least one (1) week prior to the visit.

6.4 Government shall issue identity cards to Contractor personnel, after they are approved. Contractor personnel shall always display identity card(s) on the uniform while providing services under this contract. These identity cards are the property of the US Government. The Contractor is responsible for their return at the end of the contract, when an employee leaves Contractor service, or at the request of the Government. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual.

6. 5 Security Clearances. All work under this contractor that are designated as non-CAA areas may be performed by un-cleared American or local workers. However, all work done in CAA and PCC areas shall be performed by cleared American Construction personnel. The Contractor shall work closely with the COR, the Post Facility Manager (FM) or the General Services Officer (GSO)

6.6 Standards of Conduct. The Contractor shall maintain satisfactory standards of employee competency, conduct, cleanliness, appearance, and integrity and shall be responsible for taking such disciplinary action with respect to employees as may be necessary. Each Contractor employee shall adhere to standards of conduct that reflect credit on themselves, their employer, and the United States Government. The Consulate reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The Contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the Government.

6.7 Neglect of Duties. Neglect of duties is unacceptable. This includes sleeping while on duty, unreasonable delays, or failures to carry out assigned tasks, conducting personal affairs during duty hours, and refusing to render assistance or cooperate in upholding the integrity of the worksite security.

6.8 Disorderly Conduct. The Contractor shall not condone disorderly conduct, use of abusive or offensive language, quarreling, and intimidation by words, actions, or fighting. Also included is participation in disruptive activities that interfere with normal and efficient Government operations.

6.9 Intoxicants and Narcotics. The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances which produce similar effects.

6.10 Criminal Actions. Contractor employees may be subject to criminal prosecution as allowed by law in certain circumstances. These circumstances include but are not limited to the following actions: falsification or unlawful concealment, removal, mutilation, or destruction of any official documents or records or concealment of material facts by willful omission from official documents or records; unauthorized use of Government property, theft, vandalism, or immoral conduct; unethical or improper use of official authority or credentials; security violations; organizing or participating in gambling in any form; and misuse of weapons.

6.11 Key Control. The Contractor will not be issued any keys. The keys will be checked out by Consulate staff on the day of service requirements.

6.12 Notice to the Government of Labor Disputes. The Contractor shall inform the COR of any actual or potential labor dispute that is delaying or threatening to delay the timely performance of this contract.

7. SCHEDULED PREVENTIVE MAINTENANCE

7.1. General

7.1.1. The Contractor shall perform preventive maintenance as outlined in Exhibit A – PERFORMANCE WORK STATEMENT. The objective of scheduled preventive maintenance is to eliminate system malfunction, breakdown, and deterioration when units are activated/running.

7.1.2. The Contractor shall inventory, supply, and replace expendable parts that have become worn due to wear and tear. The Contractor shall maintain a supply of expendable and common parts on site so that these are readily available for normal maintenance in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personal protective equipment (hands, hearing, eye protection). The contractor shall inventory the supply after each visit and order replacement supplies and have them delivered on site. A secure area shall be provided for the storage of Contractor supplied materials. Maintenance materials shall be new, unused and are to be industry standard and intended for the task to be performed.

7.1.3. Parts, and maintenance materials delivered to the post are to be new and unused. Reclaimed refrigerants are not to be delivered to posts. Reclaimed refrigerants within post compounds are to be retained and stored and may be used if not contaminated. Refrigerants shall be stored in containers clearly indicating the refrigerant type.

7.1.4. Exclusion. This contract does Not include repair of equipment and replacement of hardware (e.g., bearings, motors, fans, etc.) Hardware replacements will be separately priced out by the Contractor for the Government’s approval and acceptance. The Government has the option to accept or reject the Contractor’s quote for parts and reserves the right to obtain similar spare parts from other competitive sources. If required by the Government, the Contractor shall utilize Government-purchased spare parts, if awarded the work. Such repairs/replacements will be accomplished by a separate purchase order. However, this exclusion does not apply if the repair is to correct damage caused by Contractor negligence.

7.1.5. Replacement/repair of any electronic or electrical parts shall be approved by the COR prior to installation of the part. If the Contractor proceeds to replace any electronic or electrical parts without COR approval, the Contractor shall de-install the parts at no cost to the Government.

7.1.6. Stocking of recommended repair parts is at the discretion of the Facility Manager and is dependent upon the nearest location of the Equipment manufacturer, distributor, or dealer. A recommended spare parts list shall be obtained by the contractor from the manufacturer or distributor and provided to the Facility Manager to procure.

7.1.7. Parts/materials/tools procurement and delivery for the CAA/PCC areas shall be at the discretion of the Regional Security Officer (RSO)

7.2 Checklist Approval

The Contractor shall submit to the COR a schedule and description of preventive maintenance tasks which the Contractor plans to perform. The Contractor shall prepare this schedule and task description in a checklist format for the COR’s approval prior to contract work commencement.

7.2.1. The Contractor shall provide trained technicians to perform the service at frequencies stated in Exhibit A and on the equipment called out in this SOW. The technician shall sign off on every item of the checklist and leave a copy of this signed checklist with the COR or the COR's designate after each maintenance visit.

7.2.2. It is the responsibility of the Contractor to perform all manufacturers recommended preventive maintenance including preventive maintenance recommended by the manufacturers’ technical manuals for the respective equipment.

7.2.3 Additionally, the maintenance contractor shall obtain and keep at the post O&M binders provided by the manufacturers. These binders shall be placed in a location accessible to post personnel to review as needed.

8. PERSONNEL, TOOLS, CONSUMABLE MATERIALS AND SUPPLIES

The Contractor shall provide trained technicians with the appropriate tools and testing equipment for scheduled maintenance, safety inspection, and safety testing as required by this Contract. The Contractor shall provide all the necessary materials and supplies to maintain, service, inspect and test all the systems to be maintained.

8.1 Repairs are not included in this contract; see 7.1.4

8.2 Disposal of used oil, fuel, battery, and other toxic substances. The Contractor is responsible for proper disposal of toxic/hazardous substances. All material shall be disposed of according to Government and Local law. After proper disposal the contractor must show proof of authorized disposal of these toxic/hazardous substances.

9. DELIVERABLES

Provide a typewritten report to Post Facilities Manager containing following:

a) System information (make, model, all device types).

b) Pass/Fail of each feature and type of component tested. If a device fails, note device type, address, and location within Post.

c) Any comments on system (or device) condition pertaining to service life and dependability.

d) Full printout of test from system printer

The following items shall be delivered under this contract:

Description
QTY
Delivery Date
Deliver to
Registration in SAM
1
Date of proposal submission
CO
Certificate of Insurance
1
10 days after contract award
CO
List of Personnel & Security Forms
1
10 days after contract award
COR
Maintenance Plan
1
10 days after award
COR
Maintenances and activity log
1
Monthly
COR
PM Checklist
1
Monthly
COR
Invoice / Payment Request
1
Monthly
Invoice Section

10. INSURANCE REQUIREMENTS

11.1 Personal Injury, Property Loss, or Damage (Liability). The Contractor assumes absolute responsibility and liability for all personal injuries or death and property damage or losses suffered due to negligence of the Contractor’s personnel in the performance of this Contract. The Contractor’s assumption of absolute liability is independent of any insurance policies.

11.2 Insurance. The Contractor, at its own expense, shall provide and maintain during the entire period of performance of this Contract, whatever insurance is legally necessary. The Contractor shall carry the following minimum insurance:

Public Liability Insurance

Property damage: 10,000 USD Cumulative: 100,000 USD

11. LOCAL LAW REGISTRATION

If the local law or decree requires that one or both parties to the contract register the contract with the designated authorities to ensure compliance with this law or decree, the entire burden of this registration shall rest upon the Contractor. Any local or other taxes which may be assessed against the Contract shall be payable by the Contractor without Government reimbursement.

12. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

13.1 Plan. This plan is designed to provide an effective surveillance method to promote effective Contractor performance. The QAP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the Contract. The role of the Government is to conduct quality assurance checks to ensure that Contract standards are achieved.

Performance Objective
SOW
Performance Threshold

Services Performs all services set forth in the Statement of Work (SOW)

1 thru 12 & Exhibit A All required services are performed and no more than one (1) customer complaint is received per month.

13.2 Surveillance. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.

13.3 Standard. The performance standard is that the Government receives no more than one (1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212-4, Contract Terms and Conditions-Commercial Items), if any of the services exceed the standard.

13.4. Procedures.

13.4.1 If any Government personnel observe unacceptable services, either incomplete work or required services not being performed, they will immediately contact the COR.

13.4.2 The COR will complete appropriate documentation to record the complaint.

13.4.3 If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.

13.4.4 If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.

13.4.5 The COR shall, as a minimum, orally notify the Contractor of any valid complaints.

13.4.6 If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor shall notify the COR. The COR will review the matter to determine the validity of the complaint.

13.4.7 The COR will consider complaints as resolved unless notified otherwise by the complainant.

13.4.8 Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting Officer for appropriate action under the Inspection clause.

13. TRANSITIONS/CONTACTS

Within 30 days after contract award, the Contracting Officer may ask the contractor to develop a plan for preparing the contractor to assume all responsibilities for preventive maintenance services. The plan shall establish the projected period for completion of all clearances of contractor personnel, and the projected start date for performance of all services required under this contract. The plan shall assign priority to the selection of all supervisors to be used under the contract.

13.1 On site contact. The following are the designated contact personnel between the Consulate Merida and the Contractor:

Jaime Guillermo (COR): GuillermoJJ@state.gov Luis Gallardo (A/COR): gallardola@state.gov

14. SUBMISSION OF INVOICES

The Contractor shall submit an invoice after each preventive maintenance service has been performed. Invoices must be accompanied by a signed copy of the Maintenance Checklist for the work performed including parts replacement and break down calls, if any. No invoice for preventive maintenance services will be considered for payment unless accompanied by the relevant documentation.

The Contractor should expect payment 30 days after completion of service or 30 days after receipt of invoice at the American Consulate of Merida payment office, whichever is later. Invoices shall be submitted on dedicated portal: ILMS VENDOR PORTAL

EXHIBIT A - PERFORMANCE WORK STATEMENT (PWS)

SWIMMING POOL & WATER FEATURE MAINTENANCE

1. PERFORMANCE WORK STATEMENT

The United States government requires a professional local contractor to perform preventive maintenance “PM” service of the swimming pool, the water feature and its equipment as well as perform water testing indicated in next chapters for real property owned or managed by the U.S. Government in Merida, Mexico.

The main purpose of this PWS is to provide guidance to interested contractors on:

How the contractor will meet the Consulate requirements.

During the period of performance or time of contract, contractor must always comply with the following:

· Safety is the top priority, especially considering there will be people using the pool.

· Always keep areas undisturbed and accessible.

· Work areas must be isolated, delimited and with control access, when applicable.

2. GENERAL REQUIREMENTS

Contractor shall provide coordination, supervision, materials, tools, consumables, reagents, personal protective equipment “PPE”, management, and maintenance services to complete the requirements of this contract. There are no USG provided materials/products/tools for this service. Daily activities, as mentioned below, will be considered on Mondays, Tuesdays, Wednesdays, Thursdays and Fridays. Available hours to perform activities included in this SOW are 7:30am-4:30pm and contractor can take advantage of this at its own convenience.

Contractor furnished materials shall include, but not limited to, any material needed to satisfactorily complete and deliver a high quality product, the materials considered shall be: cleaning accessories, different sizes and material brushes, telescopic poles, vacuum cleaning equipment (vacuum head, vacuum hose, and hose-to-wall fitting items), cleaning chemicals, water treatment chemicals, containers and labels for any substance used, plastic bags and containers to pick-up debris and garbage. All chemicals shall have US EPA (Environmental Protection Agency) and NSF (National Sanitation Foundation) certification.

The Contractor shall include all planning, administration, and management necessary to assure that all services comply with the contract, the COR or A/COR schedules and instructions, and all applicable laws and regulations.

3. MANAGEMENT AND SUPERVISION

3.1 SUPERVISON

The Contractor shall designate a representative who shall be responsible for on-site supervision of the Contractor's workforce whenever is required by the COR or A/COR. This supervisor shall be the focal point for the Contractor and shall be the point of contact with U.S. Government personnel. The supervisor shall have sufficient English language skill to be able to communicate with members of the U.S. Government staff.

Contractor shall institute an appropriate inspection system including:

a. Develop and maintain checklists of duties to be carried out.

b. Ensure these duties are closely monitored by the supervisor and skilled workers.

c. Perform inspections at all work locations to determine whether the various services are being performed according to the contract requirements.

The Contractor’s Supervisor designated under this Contract is:

Supervisor: _________________________________________ Telephone Number(s): ____________________ E-mail: _________________________________

3.2 TECHNICAL GUIDANCE

All personnel assigned by the contractor for the performance of the respective services shall be supervised by the contractor. There shall be no employer employee relationship between the USG and the contractor's personnel. Subcontractors may only be employed with the express written consent of the Contracting Officer.

The Contractor shall have the services of trained personnel with experience in the cleaning and preventive maintenance of swimming pools and give technical guidance to the Contractor's work force.

Contractor shall guarantee the water quality is ideal and the chemical balance of it is within the Overseas Buildings Operations (OBO) pool standards as indicated in 1.9.2 of this SOW.

NO STORAGE OF CHEMICALS IS ALLOWED ON SITE BUT FOR THE AMOUNT IN THE BOTTLE OR PACKAGE IN USE. NO LIQUID CHLORINE CAN BE USED IN THE PREMISES.

No liquid or solid chemicals or test reagents may be stored in our warehouse. All materials must be brought onsite each time they are to be used and leftover materials must be taken off-site by the contractor at the end of the workday. Limited amounts of storage for items that are in use may be permitted, but the contractor must receive approval from the COR prior to storing any materials onsite.

All personnel that will work with chemicals, must present a formal certification or document to demonstrate this aptitude. It is the responsibility of the contractor to know and follow chemical safety guidelines to reduce the risks involved with using chemicals. Anytime the staff manipulates chemical products, MSDS (material safety data sheet) shall be used and applied accordingly. See following picture as support.

4. APPLICATION OF CHEMICALS

All chemicals used for control purposes in the swimming pool shall be approved by the Department of State (DOS) Overseas Building Operations (OBO) Safety Health and Environment Management (SHEM) and post POSHO. Within 30 days before contract award, the contractor shall furnish Embassy with a copy of the Material Safety Data Sheets (MSDSs). The contractor accepts total responsibility for this work. The Contractor shall furnish labels of all chemicals being used in conjunction with this contract.

5. LITTER CONTROL

Unless otherwise specified litter control shall include, but not be limited to, leaves and other organic materials, paper, plastic, glass & other debris materials. The emptying of Trash and Trash receptacles is the responsibility of the US Consulate janitorial staff.

6. MAINTENANCE PLAN

The Contractor shall submit a Maintenance Plan that reflects the proposed frequency for meeting the requirements of this contract. The Contractor shall submit the Maintenance Plan to the COR for approval within 10 days after contract award.

7. WORK PERFORMANCE: SWIMMING POOL & WATER FEATURE

7.1 TWICE WEEKLY

Collect debris on the surface or bottom. Spray water on the tile and pick up leaves and other debris. Using a leaf skimmer or leaf rake, remove debris first from the surface and then from the bottom.

Vacuum the pool. The pool will be vacuumed every visit as heavy use or wind, and rain will bring in debris. The vacuum hose must be completely filled with water before it is attached to the filter line. If a nylon brush is part of the vacuum head, it shall be adjusted so it touches the floor and dislodges embedded dirt. When wheels and brushes are so worn that they can no longer be adjusted, they shall be replaced.

Perform a full visual inspection at pool, as well as machinery room: inspecting for leaks, correct boiler operation, abnormal noises on equipment, overheating, etc. Machine room shall be kept clean. Report any finding immediately to the COR (contracting officer’s representative).

The water level of the pool will be checked daily, and this level must always be maintained. If the level is lower or higher than normal, immediately inform the Consulate staff.

The amount of chlorine tablets in the pool equipment will be checked daily. Additional chlorine tablets will be added as necessary to maintain the chlorine dosage at levels discussed in Section 1.9.2.

Clean furniture inside pool barrier and all glass around the pool, on both sides, using a commercial product dedicated to that purpose. Note: Daily cleaning of locker rooms and cabana interior (including outdoor kitchenette), as well as daily trash removal, will be the responsibility of US Consulate janitorial staff.

Inspect and clean the strainer located at pump suction. If it needs to be replaced, report to the COR or A/COR. Pump shall be turned off before doing this task.

You must check the pressure gauge of the filters to see if there is a representative pressure drop to decide if the filters should be changed or not. This must be communicated immediately with the Consulate staff.

Perform water testing. Depending on the results, chemicals may need to be adjusted to guarantee the water quality is within the safety requirements (see parameters listed below). If water testing results are abnormal, the results shall be verified with testing again. There will be a logbook to register all the water testing results, it will be left in an accessible location close to the pool. The results will also be delivered to the Consulate staff via email.

Indications and requirements specified in the Swimming Pool Operation and Maintenance guidelines from Overseas Building Operations (OBO) are listed below. If the use of the pool should be restricted, inform Consulate staff immediately.

Ph: parameter 7.2 to 7.6 To raise: add soda ash; to lower: add hydrochloric acid or sodium bisulfate.

Total Alkalinity: parameter 80 to 100 ppm To raise: add sodium bicarbonate; to lower: add hydrochloric acid.

Free Chlorine: parameter 1.0 to 3.0 ppm To raise: add chlorine chemical; to lower: no action, chlorine will naturally dissipate.

Cyanuric Acid (chlorine stabilizer): parameter 30 to 60 ppm To raise: add stabilizer; to lower: dilution, partially drain and refill pool with water that has not been treated with cyanuric acid.

Algaecide and clarifiers should be applied on an as needed basis.

Sweep the pool decking. Sweeping must be directed away from the pool to prevent debris from collecting around its edge or from being blown into it.

Present a weekly check list with all mentioned tasks, including the daily ones. These formats shall be attached with the monthly report, as indicated in Section 1.9.3.

7.2 MONTHLY

Deliver a written monthly report to the COR or A/COR by email, indicating the pool water chemical testing results of each week, the pool state, findings, and issues detected, and any further data related to the pool maintenance and cleaning. This report is apart from the pool water testing results logbook, and it is a requirement to submit the report with the monthly invoice.

Clean tile and walls. The scum that forms on the tile at the waterline shall be cleaned with special tile cleaners that can be applied with a brush. Never use steel wool to clean tile because the iron particles can stain the finish. Remove light scale deposits from tile. Brush the walls in a uniform manner with a tough enough brush to remove the dirt that clings to the walls.

Valves must occasionally be operated through their entire range to prevent dirt and corrosion from making them inoperable. This should be done while the pump is turned off.

Clean coping and decking. Use nonabrasive cleaners and sweep away from pool. Acceptable methods for cleaning outdoor pool decks are hosing and mopping. Hosing and cleaning movement must be directed away from the pool to prevent debris from collecting around its edge or from being blown into it. High-pressure cleaning and scrubbing are accepted practices for maintaining nonslip decks.

7.3 QUARTERLY (FOUR TIMES A YEAR)

Inspect and wash the filters to verify their optimum condition. Inform the Consulate staff if any changes are necessary. Remove all dirt and debris from filters.

8. REMOVAL OF EQUIPMENT

The contractor shall remove all equipment used from the work site before the end of each workday.

9. LOCATION FOR SWIMMING POOL MAINTENANCE SERVICE.

All services listed above are to be delivered at US Consulate Compound, Merida, Mexico.

10. WORKING HOURS

All work shall be performed during regular working hours identified as 7:30 am – 4:30 pm, except for the holidays identified in the Addendum in Section 2. Other hours may be approved by the COR or A/COR. The Contractor must provide at least 24-hour advance notice to the COR or A/COR who will consider any deviation from the hours identified above. Working hours include the set up and removal of tools and materials.

LIST OF ATTACHMENTS

Attachment #Description
Attachment 1Government Furnished Property
Attachment 2Swimming Pool & Water Feature Equipment Specifications
Attachment 3Payment Registration Form
Attachment 4DUNS, NCAGE & SAM Registration Instructions
Attachment 5NDAA Compliance Letter

ATTACHEMENT 1

GOVERNMENT FURNISHED PROPERTY

The Government shall make the following property available to the Contractor as "Government furnished property" for performance under the contract:

WATER

ATTACHMENT 2

SWIMMING POOL AND EQUIPMENT SPECIFICATIONS

EQUIPMENT PRODUCT DATA

HCFC7030C

Hayward Catridge Filter

Pentair EQ Series Pump

Stenner Metering Pump

Pentair Chlorine Bromie Feeder HC-

25M Lane Line

Hayward Underwater Pool Light -

LPLUS11100

Intermatioc Light Transformer - PX300

CMP 32

Channel Drain

Hydrostatic Relief Valve

Pentair Water Leveler

Hayward Pool Skimmer - SP1082RC

Skimmer Equilizer Fitting - MDL -SG-

06-WT

CMP Floor Inlet Fitting

Hayward Overflow Fitting - SP1019 image1.png image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.png image23.png image24.png image25.png image26.png image27.png image28.png image29.png