SOW_Stratasys 450mc fortus 3D Printer SOW.pdf

PDF 39 KB Posted

Attached to
Stratasys Fortus 450mc printer
Solicitation number
Stratasys_450_2025
Issued by

About this file

This Statement of Work (SOW) details the Marine Corps Logistics Base Albany's requirement to purchase and install a Stratasys Fortus 450mc 3D printer for the production facility in Building 2262. The procurement includes the printer and five additional years of service/maintenance, with specific system requirements including a 16 x 14 x 16 inch build volume, compatibility with various thermoplastics, print resolution of 0.005 to 0.013 inches, and dimensional accuracy of ±0.127 mm.

Key performance expectations mandate the printer produce high-strength, heat-resistant parts for aerospace, automotive, and industrial applications with reliable operation and minimal downtime. The contractor must provide all labor, tools, materials, and equipment for delivery, installation, and startup, with work to be completed within 120 days after award. The printer will be installed in a building that remains occupied during work, and the contractor must adhere to base security policies, perform daily cleanup, and follow specific safety and work hour guidelines.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Production Plant Albany

MARINE CORPS LOGISTIC BASE

ALBANY, GEORGIA

Purchase & Install an Stratasys Fortus 450mc printer.

WO Number:

POC – Clayton Brooks 06/06/25

1. STATEMENT OF WORK

This document provides the description that shall be used to acquire ONE (1) Stratasys Fortus 450mc 3D Printer and all ancillary equipment used to support or assist the printer to meet its functional duties. This printer will be in B2262 this printer will add to our additive Manufacturing capabilities so we may better support the ware fighter and the command.

1.2 Contractor shall verify all measurements prior to ordering materials. All work shall be accomplished in strict accordance with prevailing industry standards, manufacturer’s written instructions and all applicable codes.

1.3 All work requiring energy shall be done in compliance with OSHA 29 CFR 1910.147 and

1910.333 lock out tag out procedure. All electrical work shall comply with current NEC as well as local codes.

2.0 Scope of Work: The contractor shall provide all labor, tools, materials, equipment, safety measures, supervision and all associated permits and services to complete the work. The procurement of this printer must also come with 5 additional years of a service/maintenance plan the work shall consist of Purchasing, delivering, installing, and startup of a new Stratasys Fortus

450mc 3D Printer in B2262 at MCLB Albany, GA.

2.1 Contractor will be responsible for connecting system to provided Disconnect. (Customer will provide utilities (electrical power and plant air) to working envelope of equipment)

2.2 Contractor shall be responsible for due diligence. Customer will provide basic building/shop layouts, site visits, other information as necessary upon request. For point of contact, reference paragraph 4.5.

2.3 Contractor will be responsible for System start-up and functions check. System start-up will include a check of the final connections as necessary, commissioning, calibration, and operator training on the equipment purchased. The training will cover basic system functionality including running pre-written automated tests (as applicable) and manual system operation.

Connecting other devices, Service startup/training will be a total of 3 days or at minimum OEM recommendations.

2.4 Final inspection per government end user acceptance.

3.0 Equipment Description.

1. System Requirements:

The system shall meet the following minimum requirements:

• Build Capacity: Minimum build volume of 16 x 14 x 16 inches (406 x 355 x 406

mm) to accommodate large or multiple part production.

• Material Compatibility: Must support a range of thermoplastics, including ABS, ASA, PC, Nylon, ULTEM™, and other high-performance polymers for varied applications.

• Print Resolution: Ability to print with layer thickness options ranging from 0.005 to 0.013 inches (0.127 to 0.330 mm) for optimal balance of detail and speed.

• Accuracy: Dimensional accuracy of ±0.127 mm (±0.005 in.) or ±0.0015 mm/mm (±0.0015 in./in.), whichever is greater.

• Support Structure: Compatible with soluble and breakaway support materials to facilitate post-processing efficiency.

• Four material canister bays with automatic changeover to support continuous printing.

• Touchscreen user interface for ease of operation and job management.

• Heated build chamber to ensure consistent print quality.

• Connectivity & Software:

• Compatible with industry-standard Stratasys GrabCAD Print™ and Insight™ software for pre-processing and print optimization.

• Physical & Environmental Considerations:

• System dimensions shall not exceed 129.5 cm x 90.2 cm x 198.4 cm (51 x 35.5 x

78.1 in.)

• Power requirements: 208V, 50/60 Hz, three-phase

• System weight: 601 kg (1325 lbs.)

2. Performance Expectations:

• The system must be capable of producing high-strength, heat-resistant, and chemically resistant parts for aerospace, automotive, and industrial applications.

• The printer should offer repeatable and reliable operation in a production environment with minimal downtime.

• The system should be backed by manufacturer support and service agreements for maintenance and troubleshooting.

4.0 Execution

4.1 Start date to be coordinated with the customer.

4.2 Place of Performance: The production facility at MCLB Albany, GA. Building 2262

4.3 Security Requirements: Security Requirements: Contractor shall adhere to current installation security policies. For security policies and access to the base, contractors shall contact:

Visitor Control Center Building 3010, Room 33 Marine Corps Logistics Base, Albany GA.

Ph: 229-639-5118 https://www.albany.marines.mil/Resources/MCLB-Offices-Staff/Pass-and-ID/

4.4 Government Furnished Property (GFP) and Services: The US Government will not provide any equipment, fuel, personnel, utilities or facilities to the contractor for the execution of this contract. Should an emergency arise, only the necessary basic lifesaving and life support measures will be provided if an emergency occurs.

4.5 Government Point of Contact (POC):

Clayton Brooks 299-639-7606 clayton.e.brooks@usmc.mil

5.0 General Requirements.

5.1 Contractor shall cleanup work sites daily and properly dispose of debris off Government property.

5.2 The work shall be performed in such a manner as to cause the least interference with the normal functions of the Government activity. Work areas will be cleared/vacated for the period necessary for the Contractor to perform work; however, the building will be occupied during work.

5.3 Prior to beginning any work, the Contractor shall meet with the designated Government representative to discuss and develop mutual understandings relative to scheduling and administering work. All work shall be accomplished within 120 days after date of award. This completion time includes 14-day period for checking background of the contractor’s personnel prior to arrival to start work on Base. All asbestos abatement and removal shall be accomplished on weekends and holidays (only if asbestos is found during the project). All other work shall be accomplished between the hours of 8:00 a.m. and 5:00 p.m., Monday thru Friday (excluding federal holidays) unless otherwise specified in the requirements section and specifically pre-arranged with the Contracting Officer. This requires a written request two (2) days prior to proposed work.

5.4 Work shall be accomplished by personnel experienced in their respective trades. The Contractor shall perform all work in accordance with acceptable industry standards and all federal, state, and local codes.

5.5 All work requiring energy (electrical, mechanical, hydraulic, pneumatic, chemical, thermal or other) removal shall be done in compliance with OSHA 29 CFR 1910.147 and

1910.333 lock-out/tag-out procedures for worker protection. No work will be performed on energized electrical circuits unless proof is provided that no other means exist. NFPA 70E (current edition), Standard for Electrical Safety in the Workplace, shall also be utilized for worker safety compliance.

5.6 Except where specifically specified otherwise herein, all salvable materials and equipment disconnected or removed during the work and not indicated or specified for reuse on the new work shall remain the property of the Government. All recyclable materials such as metals, pipes, pumps, engines, motors, and certain electrical components, to include switch gear, MCCs, conduit, copper wire, distribution and control panels, nuts, bolts, washers, old motor starters, obsolete breakers, cable lugs, conduit, conduit fittings, connection boxes, etc. will be recycled in accordance with MCO 5090.2A through the base Qualified Recycling Program (QRP). Remaining material shall be removed from the Government property. Contractor will disassemble or cut recyclable material to fit into roll-off containers or on flat bed trailers. With no part of the items hanging off the trailers or protruding out of the top of the containers.

5.7 Prior to performing "Hot Work" (welding, cutting, etc.) or operating other flame-producing/spark producing devices, a written permit shall be requested from the Fire Division.

CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS

ISSUED. The Contractor will provide at least two (2) ten (10) pound 4A:80 BC rated extinguishers for normal "Hot Work". All extinguishers shall be current inspection tagged, approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "Hot Work" done at this activity. The Fire Watch shall be trained in accordance with NFPA 51B and remain on-site for a minimum of 1 Hour after completion of the task or as specified on the hot work permit. When starting work in the facility, Contractors shall require their personnel to familiarize themselves with the location of the nearest fire alarm boxes and place in memory the EMERGENCY FIRE phone number 229-639-5911. ANY FIRE, NO

MATTER HOW SMALL, SHALL BE REPORTED TO 229-639-5911 IMMEDIATELY.

END OF SOW

File details come from the government source that posted it. Updated .