This is a Statement of Work (SOW) for the procurement and delivery of a strand burner automation and data acquisition system for the Naval Surface Warfare Center Indian Head (NSWC IHD). The contractor is responsible for fabricating, delivering, and installing all specified equipment at the government facility.
The primary deliverables include 30 cloverleaf-style DIT brand strand burner heads rated at 10,000 PSI; a 10,000 PSI remote valve rack designed to control DIT strand burners with an additional set of transducers for calibration rotation; and a control console that centralizes valve operation and incorporates a data acquisition system capable of controlling and recording test cell pressure and temperature, handling burn rate calculations, and recording delta pressure measurements. The contractor must also provide complete installation, calibration, and operator training for all equipment. The contractor bears full responsibility for packaging, handling, and transportation of all components to NSWC IHD. The government will conduct inspection and acceptance upon delivery. The contractor is required to notify the Contracting Officer at least 30 days in advance if the delivery schedule cannot be met.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
for Strand Burner Equipment
1.0 REQUIREMENTS
The Contractor shall provide fabrication, delivery and installation to specified requirement below.
1.1 Strand burner heads:
· Cloverleaf style heads
· DIT brand to work with DIT strand burner
· 10,000 psi rating
· QTY 30
1.2 10,000 PSI Remote Valve Rack:
· Must control DIT strand burners
· Require extra set of transducers for calibration rotation
1.3 Control Console:
· All valves are controlled from the remote console
· Data Acquisition System
· Control/record Test Cell Pressure
· Control/record Test Cell Temperature
· Handle Burn Rate Calculations
· Record Delta Pressure
1.4 Installation and Calibration of equipment
1.5 Training with equipment
2.0 INSPECTION, INSTALLATION, ACCEPTANCE, AND PAYMENT
The Contractor shall be responsible for the packaging, handling, and transportation to NSWC IHD of any/all components. The Government, upon delivery of products, will perform inspection and acceptance. The Contractor shall notify the Contracting Officer thirty (30) days in advance, if the delivery schedule cannot be met.
File details come from the government source that posted it. Updated .