This is a Statement of Work (SOW) for repairing EIFS (Exterior Insulated Finish System) building facades at the USDA Cotton Ginning Laboratory in Stoneville, MS. The project involves repairing approximately 83 holes across four buildings (#22, #26, #27, and #29) caused by birds and small animals. Buildings range from single story to three stories with heights between 22-40 feet.

The contractor must provide all materials, labor, equipment and supervision to repair the holes according to detailed EIFS repair specifications. Work includes patching holes, applying primer (Sherwin-Williams Loxon Masonry Primer or equivalent), and two coats of paint (Sherwin-Williams Con Flex XL High Build Coating or equivalent) to match existing colors. The project duration is 90 calendar days from notice to proceed, with work hours between 6:30 AM - 4:30 PM Monday-Friday. The contractor must provide past performance examples of 3 similar projects, obtain necessary bonds for projects over $35,000, and conduct a site visit before bidding. This project is part of solicitation 12405B25R0004, which is set aside for small businesses with an estimated value between $25,000-$100,000.

View the file

Other files

File Type Posted
12405B25R0004.pdf PDF
Attachment 4 ARS-372.pdf PDF
Attachment 3 - ARS-371.pdf PDF
Solicitation 12405B25R0004.docx DOCX document
Wage Rates.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture Agricultural Research Service

STATEMENT OF WORK

Repair EIFS Building Façade, Buildings 22, 26, 27 & 29 Asset ID – 640200B0022, 640200B0026, 640200B0027, 640200B0029

USDA Cotton Ginning Laboratory 111 Experiment Station Road Stoneville, MS 38776

Prepared by: Roger Bright/Kevin Magee October 2024

Table of Contents

1. Project Site MapPage 3
2. Project Contact PersonsPage 4
3. Scope of ServicesPage 4
4. Project RequirementsPage 5
5. SpecificationsPage 7

6. General Requirements Page 10

7. Project SchedulePage 12
8. Building Photos and SchematicsPage 13

1.0 PROJECT:

Project Title: “Repair EIFS Building Facade” at the USDA, ARS, Cotton Ginning Research Center, 111 Experiment Station Road, Stoneville, MS 38776.

2.0 PROJECT CONTACT PERSONS:

CONTRACTING OFFICER (CO):

Lynn Hults Email: lynn.hults@usda.gov 912-464-9723

3.0. SCOPE OF SERVICES:

The Contractor shall provide all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with requirements as described herein.

1. The Contractor shall provide services for the following tasks marked by an “X”:

[X] Provide a technical and cost proposal to complete the project as per project requirements listed in this SOW.

[X] Provide a list of at least 3 example projects of this nature (including a customer point of contact for each project) with the bid package.

[X] Complete the project as per project requirements listed in SOW.

4.0 PROJECT REQUIREMENTS:

The Contractor shall furnish a technical proposal and a cost proposal to supply all materials, labor, equipment, and supervision necessary to repair holes in the EIFS building façades on Buildings 22, 26, 27, & 29. The project is located at the USDA, ARS, Cotton Ginning Research Center, 111 Experiment Station Road, Stoneville, MS 38776.

1. The Contractor will work with COR to ensure project is accomplished in a timely manner.

1. Additionally, Payment and Performance bonds may be required for projects exceeding $35,000. Obtaining and the cost of these bonds is the responsibility of the Contractor. Proof of Insurance is also required.

d. The Contractor is responsible for visiting the site prior to submitting a bid to observe existing conditions. No compensation will be provided for conditions that would be visible during an on-site visit for persons experienced performing this type of work.

4.1 Bid Schedule:

1. The Base Bid shall include all work described in 4.2 Description of Work.

4.2 Description of Work:

a. Background - The Cotton Ginning Research Facility in Stoneville has its own self-contained campus that consists of several buildings which have been retrofitted with an Exterior Insulated Finish System (EIFS). Birds and small animals have damaged the finish causing holes to develop. These holes are in need of repair to restore the building envelope as well as aesthetics.

b. Project Objective - The objective of this project is to repair holes and patch paint repaired holes, approximately (83) total, on the exterior of four (4) buildings to the included specifications. These buildings are located on the Cotton Ginning Compound of the Jamie Whitten Delta States Research Center in Stoneville, Mississippi. The exterior composition of the buildings is an EFIS (Exterior Insulated Finish System), also known as synthetic stucco.

· Building #22 - The building is three stories, approximately 40’ in height, with a north/south width of approximately 40’ – 11”, and an east/west width of approximately 90’, with approximately (24) holes to repair.

· Building #26 - The building is a single story, approximately 22’ in height, with a north/south width of approximately 41’, and an east/west width of approximately 118’, with approximately (23) holes to repair.

· Building #27 - The building is three stories, approximately 40’ in height, with a north/south width of approximately 40’, and an east/west width of approximately 98’, with approximately (24) holes to repair.

· Building #29 - The building is three stories, approximately 30’ in height, with a north/south width of approximately 82’, and an east/west width of approximately 32’. There is an additional building offset, attached to the building, with a north/south width of approximately 32’, and an east/west width of approximately 14’, with approximately (12) holes to repair.

c. The major items of work are listed in the following:

1. The contractor shall furnish all materials, labor and equipment required to patch holes and patch paint on the exterior EFIS surface of the four buildings #22, #26, #27 and #29 as designated in the project objective, according to the included specifications.

2. Paint colors shall match existing Building colors. Building Number, Doors, Door Trim and Building Accent Trim will be a different color than buildings.

3. The contractor shall be responsible for providing the primer, paint, and preparing the substrate for primer application. Gutters shall not be removed. Apply one coat of “Sherwin-Williams” Loxon Masonry Primer, or equivalent, to EIFS patched areas.

4. Apply two coats of “Sherwin-Williams” Con Flex XL High Build Coating, or equivalent, to all to EIFS patched areas.

4.2.1 Pre-Construction Phase Services:

1. Pre-Construction Submittals

Prior to issuance of Notice to Proceed (NTP) the following submittals must be submitted to the Contracting Officer (CO) for approval:

1. Work Hours, per Section H.30 entitled, MAXIMUM WORKWEEK – CONSTRUCTION SCHEDULE. The work hours will include the daily starting and stopping time, and days of the week the Contractor proposes to carry out the work. Daily Facility hours are from 6:30a.m. to 4:30 p.m. excluding weekends and Federal holidays. Contractor shall submit a work schedule conforming to the times of operation listed above and list the anticipated completion date.

1. Contractor will verify all dimensions, total number of holes, and site conditions prior to beginning work and report any discrepancies to LPOC and COR.

1. Submit Site Specific Accident Prevention Plan/Safety plan complete with contact info and map to nearest emergency room and minor medical facility.

1. Submit proposed materials for all work for approval prior to the start of work. Submittal must include data sheets and specifications.

4.3 Government Furnished Equipment\Services:

1. The Government will furnish a reasonable amount of electricity and water.

1. Some of the buildings involved in this project are inside a secure fence. The contractor will be given access inside the gated portion of the project from the hours of 6:30 to 4:00 M-F excluding holidays.

5.0 SPECIFICATIONS

5.1 Definition of Terms

EIFS: a multi-layered exterior barrier-type system designed to prevent moisture intrusion into exterior walls. The system consists of four main components:

1) Panels of expanded polystyrene foam insulation installed with adhesive or mechanically fastened to the substrate, usually plywood or oriented strand board (OSB),

2) A base coat that is toweled over the foam insulation panels,

3) A glass fiber reinforcing mesh is laid over the polystyrene insulation panels and fully imbedded in the base coat,

4) A finishing coat is then troweled over the base coat and the reinforcing mesh.

The base coat, mesh, and finishing coat is usually approximately 1/8 to 1/4 inches thick.

Synthetic Stucco: Exterior Insulated Finish System hereinafter called EIFS. The materials used to form the EIFS vary from manufacturer to manufacturer. EIFS is a barrier type cladding system that relies entirely on the exterior surface to keep moisture out.

Alkali: A substance such as lye, soda or lime that can be highly destructive to paint films.

Base Coat: Initial wet set material, either factory or field mixed, used to encapsulate reinforcing mesh or to fasten insulation board to substrate.

Coating: A coat or covering; a layer of any substance, as a cover or protection.

Dry Film Thickness (DFT): The thickness of the dry paint film.

Elongation: The percent increase of a given distance prior to failure during tensile testing.

Expanded Polystyrene (EPS): Expanded polystyrene, manufactured from styrene, is a closed-cell, thermoplastic material often molded into low-density foam articles, such as protective packaging, foam insulation and building and construction.

Flexibility: The ability of a coating to expand and contract during temperature changes.

Mil: A term used to indicate the thickness of the paint film. A dry film thickness of 0.001", i.e., the standard dry film thickness after curing for several common paints, is one (1) mil.

Mildew Resistance: The ability of a coating to resist the growth of molds and mildew. Mildew is particularly prevalent in warm, humid climates.

Tensile Strength: The maximum stress that a material/product can withstand.

Paint: To cover with coloring matter; to apply paint to; as, to paint a house, etc.

PERMEABILITY: The property of a substance which permits passage of water vapor and is equal to the permeance of an inch (1) of thickness of the substance.

Primers: Improve adhesion of EIFS to substrate or of finish to base coat. The base coat or the first complete coat of a paint system that is applied to an uncoated surface.

TSP: Tri-sodium phosphate, a cleaning agent. After the TSP has been dissolved in water, the solution is used in surface preparation. (After cleaning with TSP, the surface should be rinsed.)

Volatile Organic Compound (VOC): Major contributing factor to ozone, a common air pollutant which has been proven to be a public health hazard.

5.2 Repair Procedure and Specifications

Repair of Surface Cracks Surface cracks are defined as small surface defects that do not penetrate beyond the EIFS base coat, and in which the EIFS reinforcing mesh is not severed.

1. Brush away loose finish or base coat material, clean if necessary to remove surface dirt.

1. Use a small stiff bristle paint brush to apply a base coat into the crack. Use a wet brush to remove excess basecoat that gets into the face of the finish. Allow base coat to dry.

Repair of Puncture Damage Puncture damage is defined as any damage that fractures the EIFS system reinforcing mesh and deforms the surface of the EPS board.

1. Clean the area around the damage. Apply a water-based gel type paint remover with a stiff brush to the finish in the immediate area surrounding the damage. (Paint remover shall be 3M Safe Stripper Paint and Varnish Remover) Exercise care with the paint remover to avoid getting it onto surfaces that are not being repaired. Alternatively, a handheld grinder can be used to remove the finish, taking care not to grind or deteriorate the mesh layer. Use a scraper to remove at least 5 inches (130mm) around the puncture damage and to leave a sharp finished edge. Use coarse sandpaper to remove the top layer of base coat to the mesh surface.

1. Cut the mesh at the damaged area so at least 2-1/2 inches (64mm) of intact base coat and reinforcing mesh exist between the puncture damage and the finish edge. Cut EPS slightly larger than the damaged EPS and temporarily “pin” it in place with a nail. Use a sharp knife to cut through the EPS. Cut at least 1 inch (25mm) away from the mesh cut. Cut with a slight angle so that the new EPS will be slightly larger than the hole to be plugged with it.

1. Make a clean cut to the substrate and remove the old EPS. Dry fit the new EPS to check for fit. Adjust size or re-cut new EPS if fit is not snug. Butter the sheathing side of the new EPS with a base coat along the perimeter and in the middle, then press into place. Make sure the new EPS is flush with or higher than the surface of the adjacent EPS. Allow the adhesion to dry, then rasp or sand the surface flush with the adjacent EPS and brush clean.

1. Cut Mesh to overlap existing mesh at least 1 inch (25mm). Apply masking tape up to the finish edge surrounding the repair area. Apply base coat and embed the mesh patch in the wet base coat and level the base coat to match the surface profile of the original base coat. Allow the base coat to dry and check the surface profile to make sure it matches the original. Apply additional base coat if necessary and allow it to dry. Mesh shall be a minimum 6-ounce high impact composition.

1. Apply primer and allow it to dry.

1. Apply finish (matched to existing texture and color) with a stainless-steel trowel and remove the aggregate in the finish from the masking tape. Scrape the finish tight against the wall to match the adjacent finished surface. Float the finish to match the adjacent texture.

1. Remove masking tape and use a brush to “stipple” the wet edge into the adjacent finish. Alternate between brush and float to achieve the texture match.

Acrylic Primer (Buildings)

If applying with a “brush”, use a quality nylon/polyester brush.

If applying with a “roller”, use a quality ½” to 1-1/2” nap synthetic roller cover.

If applying with an “airless-sprayer”, pressure shall be 2000 – 2700 psi, tip 0.19”, reduction none.

If applying with a “conventional-sprayer”, pressure shall be 40 – 60 psi, fluid pressure 20 psi, cap/tip 704/FX, reduction up to 1 pint per gallon.

1. Moisture vapor permeability: 1.2 ASTM D 1653-72, 1 coat @ 4.6 mil dft

1. Tensile Strength: 220 PSI 1 coat @ 4.6 mil dft

1. Elongation: 400% 1 coat @ 4.6 mil dft

1. VOC: 46 g/L; 0.39 lb/gal

1. Alkali Resistant

ASTM D 1308

1. Mildew Resistant

ASTM D 3273/D3274

1. Flexible ASTM D522 – Method B, 180 bend, 1/8” mandrel

1. VOC: 97g/L; 0.81 lb/gal

1. Volume Solids: 40 +/- 2%

1. Weight Solids: 54 +/- 2%

1. 8 mils wet ; 3.2 mil dry

Top Coat (Building Paint)

1. Two coat system, brush, roller, or spray applied, coverage per coat:

100 – 125 sq/ft/gal 13.0 – 16.0 mils wet; 6.0 – 7.5 mil dry

1. Water Vapor Permeance: 17.8 perms ASTM D 1653-72, 1 coat @ 9.4 mil dft

1. Tensile Strength: 368 PSI 1 coat @ 9.4 mil dft

1. Elongation: 350 % 1 coat @ 9.4 mil dft

1. Mildew Resistant

1. VOC: 97g/L; 0.81 lb/gal

1. Volume Solids: 46 +/- 2%

1. Weight Solids: 61 +/- 2%

5.4 Submittals

1. Product data sheets to be used, with the following information included:

0. Preparation instructions and recommendations

0. Storage and handling requirements and recommendations

0. Installation methods

0. Maintenance requirements

6 GENERAL REQUIREMENTS

6.1 Permits:

Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.

6.2 Utility Severance Certificates:

Not required.

6.3 Installation Plan:

No installation plan required.

6.4 Installation Schedule:

Contractor shall coordinate all work with Local Point of Contact or COR. All disturbances or disruptions of service as a part of work for this building shall be coordinated with the LPOC or COR to prevent jeopardizing on-going research.

6.5 Quality Control:

The work performed under this contract shall be subject to continuous audit by the COR. Quality control is the exclusive responsibility of the Contractor.

6.6 Protection of Work and Property/Safety Requirements:

1. The Contractor shall protect the work, the site, and all existing property, vehicles, and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense to pre-damaged condition to the satisfaction of the COR.

1. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities for the protection and safety of pedestrians and vehicular traffic.

c. The Contract Documents may not represent all current conditions at the site and adjoining areas. The known conditions are as indicated and shall be compared with actual conditions before commencement of work. Any notable differences shall be memorialized in writing and brought to the attention of the LPOC and COR for further consideration.

d. Government will not furnish any labor or equipment to unload or move materials or supplies.

6.7 Hazardous material:

a. No hazardous materials are believed to be involved with this project. If the Contractor discovers suspected hazardous materials at this worksite, the LPOC, CO and COR will be notified immediately for further action.

6.8 Disposal of Waste Materials and Debris:

a. Dispose of waste, trash, and debris in a safe, acceptable manner, in accordance with applicable laws and ordinances and as prescribed by authorities having jurisdiction.

b. Burying of trash and debris on the site will not be permitted. Burning of trash and debris at the site will not be permitted.

c. Remove trash and debris from the site at frequent intervals so that their presence will not delay the progress of the work or cause hazardous conditions for workers and the public.

d. The contractor should make every effort to recycle as much of the waste as possible.

6.9 Temporary Facilities:

a. Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.

b. Should the Contractor require any power or utility shutdowns during the work, the Contractor shall obtain approval for such shutdown from the LPOC or COR three working days prior to the need.

6.10 Cleanup:

The work site shall be kept clean and free of debris at all times. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR.

6.11 Final Payment/Contract Closeout:

The following documents are REQUIRED PRIOR TO FINAL PAYMENT (other documents may also be required):

1. Release of liens.

1. Release of Claims

1. Employee payroll\time sheets

1. Invoice

6.12 PROJECT SCHEDULE: The Contract time for this project is 90 calendar days from the notice to proceed. NTP will be issued at the mandatory preconstruction conference.

7.0 SCHEMATICS & PHOTOS

Figure 1 USDA Cotton Gin Laboratory

Figure 2 Example Holes

Figure 3 Example Holes

Figure 4 Example Holes

Figure 5 Building 27 South Face

Figure 6 Building 27 West and South Faces

Figure 7 Building 27 North Face

Figure 8 Building 27 East and South Faces

Figure 9 Building 22 West and South Faces

Figure 10 Buildings 27 and 22

Figure 11 Building 29 South and East Faces

Figure 12 Building 29 North and West Faces

Figure 13 Building 26 South Face image3.jpg image4.jpg image5.jpg image6.jpg image7.jpg image8.jpg image9.jpg image10.jpg image11.jpg image12.jpg image13.jpg image14.jpg image15.jpg image16.jpg image1.png image2.jpg

File details come from the government source that posted it. Updated .