This draft Statement of Work (SOW) details a contract for engineering, purchase, installation, and commissioning of six steam safety relief valves for three CleaverBrooks Fire Tube Steam Boilers located at the Central California VA Medical Center in Fresno. The specific requirements include installing two safety relief valves per boiler with precise pressure settings (135 PSI and 140 PSI), using Kunkle Model 300 valves or equivalent, and meeting ASME section I 'V' for steam standards. The contractor must provide qualified personnel, equipment, tools, transportation, and personal protective gear, and perform comprehensive testing in accordance with VHA Directive 1810 standards for Steam Pressure Relief Valves.

The project has a 30-day completion timeline and will be performed at the Central Energy Plant Building #2. Key contractor responsibilities include conducting BEI checks with energy plant staff, providing hands-on training, offering a 365-day warranty on all work, and ensuring that boiler operations remain uninterrupted during installation (maintaining N+1 operational status). The contractor must comply with VA, local, state, and federal safety regulations, wear distinctive identification, check in with VA police, and follow specific security and records management protocols. Normal working hours are 7:30 a.m. to 4 p.m., Monday through Friday, excluding federal holidays.

View the file

Other files

File Type Posted
36C26125R0080_2.docx DOCX document
36C26125R0080.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

STATEMENT OF WORK

I. SCOPE OF WORK.

At no time will contractor install this request and jeopardize the daily operation of the facilities ability to generate steam. The Medical Center is to always remain as N+1 during this work.

This contract is for the engineering, purchase, installation and commissioning of six steam safety relief valves for 3 Series 3WI CleaverBrooks Fire Tube Steam Boilers. Each boiler has a max allowable of 200 PSIG, Rated HP is 300 HP and capable of 10350 LB/HR. All 3 Boiler model number is 3WI 200-300-200ST and has a max firing rate of 12082 cubic feet an hour/CFH. This statement of work shall include the installation of 2 Steam Pressure Relief Valves times 3 to ensure all guidelines and specifications are met regarding VHA Directive 1810 standards in Steam Pressure Relief Valves and all Safety Device Testing. Contractor will provide qualified personnel, all necessary equipment and tools, transportation, and all PPE gear to include Lockout Tagout, any confined space documentation and testing of confined spaces, Hot work permits, and any inclusive equipment and administrative documentation. The equipment is in the Central Energy Boiler Plant Building #2, 2615 E Clinton Ave, Fresno, CA 93703-2286.

Model 300

II. SPECIFIC REQUIREMENTS FOR SAFETY VALVES AND SAFETY DEVICES.

3 CleaverBrooks fire tube boilers model number 3WI 200-300-200ST

a. Contractor will supply the Central California VA Medical Center with the purchase, installation, testing and documentation of 6 safety relief valves for steam.

Each boiler uses 2 safety relief valves and must coincide with the proper lift pressure of set point for all 2 valves. Lift pressures will be set at 135 PSI for the first valve and 140 PSI for the second valve. Each valve must be made out of heavy-duty construction of high-quality cast steel with stainless steel full-nozzle trim. Safety valves must meet ASME section I ‘V’ for steam. Steam safety valves must be Kunkle Model 300 with the following specifications (or equivalent):

Model number Orifice inlet² outlet³ Orifice area

In² Valve dimensions in.

A B C Approximate weight

LB

300 J J 1 ½ in 2 ½ in 1.287 5⅜ 5 ½ 20⅞ 75

b. Steam Safety Valves:

1. Capacities certified by National Board of Boiler and Pressure Vessel Inspectors

(NBBI).

2. Type: Cast-steel bodies, side outlet, flanged or threaded inlet and outlet, lifting lever, dual control rings, and stainless-steel trim.

3. Settings and Adjustments: Factory set, sealed, and stamped on nameplate. Set pressures as shown. Set pressure of lowest pressure valve shall not exceed normal boiler plant operating pressure by more than 207 kPa (30 psig). Provide 34 kPa (5 psig) difference in setting between each of the valves.

c. After installation, contractor will test each safety valves by following the “VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition testing manual regarding the “Checklist for Steam Safety Valves on Boiler (SVB) (For steam Boiler Systems).

Specific requirements include Steam Safety Valve/SVB1 is required to be set 5 psig higher than HHBSPLS & at least 10 psig below boiler MAWP. SVB2 is required to be set 5 psig or higher than SVB1 & at least 5 psig or more below boiler MAWP. Each SVB is required to be separately and directly vented outside. Vent lines are required not to contact drip panels when hot. Drip Panel drains must be piped separately not combined.

d. Contractor will ensure steam safety valves will alarm and trip each boiler in accordance with BEI Safety device guidelines.

e. All switches will be labeled to show which actuator it will cause to prevent boiler from starting when proof of closure is not made.

III. TRAINING:

a. Contractor will perform BEI checks with energy plant staff to include hands on training and explanation of Steam Pressure Relief Valves BEI checks on one out the three boilers.

IV. Warranty Guarantee:

a. Contractor will make sure all work has been done per manufacturers recommendation from the safety valve manufacturer and to abide by BEI specifications as well as the boiler manufacturer. All work will be warranted by the contracted installer before testing and after for Three hundred and sixty five (365) days. Warranty begins after each boiler is completed and tested for lift, re-seat, and accumulation of the newly installed safety valves. If safety valves re-seats and leaks, contractor will replace the leaking relief valve(s) with a new one.

V. HOURS OF WORK AND SCHEDULING.

Normal working hours are from 7:30 a.m. to 4 p.m., Monday through Friday, excluding Federal holidays. Work performed outside of normal working hours must be scheduled with the Central Energy Plant operator at (559) 225-6100 ext.5403, located in the Central Energy Plant, building number 2. An operator is on duty 24-hours per day, 7-days per week. Work shall be scheduled with the Energy Plant operators or Energy Plant supervisors.

Place of Performance:

Central Energy Plant Bldg.2 2615 E. Clinton Ave Fresno, CA 93703-2286

COMPLETION TIMELINE: Project must be completed within thirty (30) days.

VI. QUALIFICATIONS.

An authorized company capable of providing the required materials, install and testing all components. A lead technician shall be provided by the contractor that has documented experience implementing large scale projects equal to or greater than the scope of this project to oversee all contract personnel.

VII. CONFIRMATION OF REPAIR WORK. All services will be confirmed and approved by the Energy Plant supervisor or designee. When service is completed, the contractor must indicate on the service ticket the equipment serviced. The equipment serviced must be identified clearly by name, serial number, and location.

VIII. COMPLIANCE.

The contractor shall be fully responsible for compliance with all VA, local, state, and federal environmental/occupational safety laws, rules, and regulations. The contractor shall follow life and safety codes and take necessary actions to avoid conditions that may be hazardous to the health and safety of hospital personnel and patients. The contractor is responsible for meeting all applicable OSHA and VA guidelines for safe working processes; example: lock-out/tag-out program or safe handling of hazardous materials.

IX. CONTRACTOR EMPLOYEES.

Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. Example: wearing of distinctive clothing such as uniform, badges, patches, etc.

X. ESCORT AND VETERAN’S HOSPITAL SECURITY POLICE CHECK-IN.

All contractor personnel working onsite at the VA facility shall check in and out with VA police dispatch located in the entrance of the Emergency Department. Access to work areas, and performance monitoring, will be provided by VA Energy Plant maintenance personnel. After hours response will be monitored by VA Central Energy Plant operators, (559) 225-6100 ext.5403. In all cases, VA Central Energy Plant operator shall be notified of any changes which may affect the response time of vital equipment.

C&A requirements do not apply, and a Security Accreditation Package is not required.

XI.CONTRACT ADMINISTRATION DATA

1. Federal Legal Holidays

The following Federal legal holidays are observed by this facility:

New Year’s Day 1 January Martin Luther King’s Birthday Third Monday in January President’s Day Third Monday in February Memorial Day Juneteenth

Last Monday in May 19 June

Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day 11 November Thanksgiving Day Fourth Thursday of November Christmas Day 25 December

Note: Any of the above holidays falling on a Saturday will be observed on the preceding Friday;

holidays falling on Sunday will be observed on the following Monday. Contractor’s days to perform are reflected in the Performance.

Work Statement/Statement of Work.

2. Invoice and Payments:

Invoices shall be itemized to include the information below (a-f). For any missing information, this will render the invoice incomplete, and the invoice shall be returned for immediate correction.

a. Time period being invoiced. d. Extended amount due.

b. Description of services. e. Invoice number, date, and

c. Unit Cost billed. f. Contract, Order, and Obligation number.

3. VA Policy

Possession of weapons is prohibited. Enclosed containers, including tool kits, are subject to search. Violations of VA regulations may result in citations answerable in the United States (Federal) District Court.

4. Contracting Officer Representative (COR)

The Contractor shall not accept any instructions issued by any other person(s) other than the contracting officer. The government may appoint a COR, if so, a Delegation of Authority letter shall be forwarded to the using service and the Contractor after contract has been signed, identifying the individual(s) as the COR(s).

5. Hours/Period of Performance

The hours of performance are 7:30 am – 4 pm, Monday through Friday, excluding Federal holidays.

6 Contractor Personnel

The contractor shall assign a point of contact (POC) for the purpose of ensuring compliance with the provisions of the contract. The contractor’s POC shall be available on site and have the ability to address performance issues. All employees should be able to read and speak English.

Contractor personnel working under this contract shall not be considered VA employees for any purpose and shall be considered employees of the contractor. All contractor personnel assigned to the performance of this contract shall wear a contractor-provided uniform or I. that clearly identifies the individual as a contractor. All contractor personnel are required to wear identification (I.. badges during the entire time they are on the VACCHS grounds. ID badges must have picture identification, name of the individual, and the represented company depicted on it.

Contractor personnel shall not wear sandals, flip-flop style footwear, or open-toe shoes; and shall follow VA dress guidelines. A copy of this will be provided upon request.

The contractor shall ensure that the staff assigned shall be cognizant of the VA’s sexual harassment and drug-free workplace policies. The contractor may obtain a copy of this information from the COR.

7. Contractor Contact Information

Offerors shall provide in the space provided below the name, address and telephone number of the office where calls are to be placed:

Name:

Address:

Telephone:

8. Contractor Personnel Qualifications:

The contractor shall provide a Lead Technician to oversee all contract personnel with documented experience implementing large scale projects equal to or greater than the scope of this project.

9. Safety and Fire Prevention

In the performance of this contact, the contractor shall take such safety precautions as necessary to protect the lives and health of the occupants of the building. Fire and safety deficiencies, which exist and are part of the responsibility of the contractor, shall be immediately corrected. If the contractor fails or refuses to correct deficiencies promptly, the contracting officer may issue an order stopping all, or any part, of the work.

The contractor shall comply with applicable Federal, California State, and VA safety and fire regulations and codes, which are in effect during the performance period of the contract. The contractor personnel shall follow applicable facility policies concerning fire and disaster programs. A copy of this may be obtained from the COR.

10. Parking Policy

It is the responsibility of contractor personnel to park only in designated parking areas. Parking information is available from the VA police. The VA will not validate or make reimbursement for parking violations of the contractor’s personnel under any circumstances.

11. Smoking Policy Smoking is not permitted within or around the VACCHCS facilities.

12. Contractor Submittals/Insurance Requirements:

The contractor shall be required to comply with Federal and California State workers compensation and liability insurance (reference FAR clause 52.228-5-Insurance and Subpart 28.307-2-Liability).

The Government shall be held harmless against any or all loss, cost, damage, claim expense or liability whatsoever, because of accident or injury to persons or property of others occurring in the performance of this contract.

The Contractor shall be responsible for all damages to property, which may be done by him/her or any employee engaged in the performance of this contract.

The parties agree that the Contractor’s personnel working under a contract shall not be considered VA employees for any purpose and shall be considered employees of the contractor.

The contractor shall be responsible for providing:

a. Workers Compensation,

b. Professional liability insurance,

c. Health examinations,

d. Income tax withholding, and

e. Social Security payments.

13. ORDERING ACTIVITY:

Contractor shall not accept any instructions issued by any person other than the CO or COR acting within the limits of his/her authority.

14. CHANGES TO CONTRACT:

Only those services specified herein are authorized. Before performing any service of a non-contractual nature, Contractor shall advise the CO of the reason(s) for the additional work and/or service.

15. COMPLAINTS:

Contractor shall promptly and courteously respond to complaints within 3 working days. Including complaints brought to Contractor’s attention by the CO. Contractor shall maintain a written record of all complaints, both written and oral showing the identity of the individual, the nature of the complaint, and Contractor’s response. Contractor shall permit the Government to inspect such records upon reasonable notice.

16. BADGES:

All Contractor personnel shall be required to wear company ID badges.

17. INVOICE REQUIREMENTS:

a. Payments will be broken out into four quarterly payments and paid in arrears.

b. No advance payments will be authorized.

c. The Government shall pay the Contractor, upon the submission of a properly prepared invoice for prices stipulated in this contract for services and supplies delivered and accepted.

d. Payment of invoices may be delayed if appropriate field service reports are not completed and submitted as specified herein.

e. The invoice shall be itemized to include the following minimum information:

1) Invoice Number and Date.

2) Contract Number.

3) Purchase Order/Obligation Number (to be assigned upon task order award).

4) Date of service.

5) Line item from Schedule of Service associated with each charge.

23 POST-AWARD PERFORMANCE CONFERENCE: The CO may schedule a post-award performance conference with Contractor, if deemed necessary, for contract orientation purposes.

18. SECURITY REQUIRMENTS:

A. Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.

B. A prohibition on unauthorized disclosure: "Information made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA." See VA Handbook 6500.6, Appendix C, paragraph 3.a.

C. A requirement for data breach notification: Upon discovery of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access, the contractor/subcontractor shall immediately and simultaneously notify the COR, the designated ISO, and Privacy Officer for the contract. The term 'security incident' means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. See VA Handbook 6500.6, Appendix C, paragraph 6.a.

D. A requirement to pay liquidated damages in the event of a data breach: "In the event of a data breach or privacy incident involving any SPI the contractor processes or maintains under this contract, the contractor shall be liable to VA for liquidated damages for a specified amount per affected individual to cover the cost of providing credit protection services to those individuals." See VA Handbook 6500.6, Appendix C, paragraph 7.a., 7.d.

E. A requirement for annual security/privacy awareness training: "Before being granted access to VA information or information systems, all contractor employees and subcontractor employees requiring such access shall complete on an annual basis either: (i) the VA security/privacy awareness training (contains VA's security/privacy requirements) within 1 week of the initiation of the contract, or (ii) security awareness training provided or arranged by the contractor that conforms to VA's security/privacy requirements as delineated in the hard copy of the VA security awareness training provided to the contractor. If the contractor provides their own training that conforms to VA's requirements, they will provide the COR or CO, a yearly report (due annually on the date of the contract initiation) stating that all applicable employees involved in VA's contract have received their annual security/privacy training that meets VA's requirements and the total number of employees trained. See VA Handbook 6500.6, Appendix C, paragraph 9.

F. A requirement to sign VA's Rules of Behavior: "Before being granted access to VA information or information systems, all contractor employees and subcontractor employees requiring such access shall sign on an annual basis an acknowledgment that they have read, understand, and agree to abide by VA's Contractor Rules of Behavior which is attached to this contract." See VA Handbook 6500.6, Appendix C, paragraph 9, Appendix D. Note: If a medical device vendor anticipates that the services under the contract will be performed by 10 or more individuals, the Contractor Rules of Behavior may be signed by the vendor's designated representative. The contract must reflect by signing the Rules of Behavior on behalf of the vendor that the designated representative agrees to ensure that all such individuals review and understand the Contractor Rules of Behavior when accessing VA's information and information systems.

G. Bio-Medical devices and other equipment or systems containing media (hard drives, optical disks, etc.) with VA sensitive information must not be returned to the vendor at the end of lease, for trade-in, or other purposes." See VA Handbook 6500.6, Appendix C, paragraph 5.h., for the specific options.

RECORDS MANAGEMENT LANGUAGE

Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. Chapters. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

In accordance with 36 CFR 1222.32, the contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law.

Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.

The VA Central California Healthcare System (VACCHCS) and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VACCHCS or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701.

In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the contractor must report to VACCHCS. The agency must report promptly to NARA in accordance with 36 CFR 1230.

The contractor shall immediately notify the appropriate Contracting Officer (CO) upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the contract documents. The contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to VACCHCS control, or the contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the CO or address prescribed in the contract documents. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).

The contractor is required to obtain the CO's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The contractor (and any sub-contractor) is required to abide by Government and VACCHCS guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.

The contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VACCHCS policy.

The contractor shall not create or maintain any records containing any non-public VACCHCS information that are not specifically tied to or authorized by the contract.

The contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the FOIA.

VACCHCS owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VACCHCS shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.

Training. All contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training. The contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.

Flow down of requirements to Subcontractors:

The contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this contract document, and require written subcontractor acknowledgment of same.

Violation by a subcontractor of any provision set forth in this clause will be attributed to the contractor.