SOW STA Freeport demo ro shed_in progress.pdf

PDF 1 MB Posted

Attached to
FREEPORT WATERSHED DEMOLITION
Solicitation number
70Z02925QNEWO0014
Issued by

About this file

This is a Statement of Work (SOW) for the demolition of an RO shed and electrical modifications at the US Coast Guard Station in Freeport, Texas. The document includes detailed specifications and photographs showing the current condition of the facilities.

The scope requires contractors to demolish and remove an existing RO shed including steel columns and tin sheeting, remove electrical panels and wiring, install a weatherproof junction box to supply power to the front gate, remove the existing electrical panel on the pump house, install a new weatherproof electrical panel on the pump house, and install a new 20A breaker for the front gate. The work must minimize interference with facility operations, which run Monday-Friday 7:30am-3:00pm. The contractor must provide all labor, materials and equipment, follow OSHA safety standards, maintain a written safety plan, and properly dispose of all debris and materials. The facility is located at 823 Coast Guard Dr., Freeport, TX 77541. Photos show the current state of the RO shed structure, electrical panels, and a site overview indicating the locations of all components to be modified or removed.

View the file

Other files

File Type Posted
70Z02925QNEWO0014_0_US (1).pdf PDF
Attachment A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

USCG STA FREEPORT

SPECIFICATIONS

FOR

Demo RO Shed

General: United States Coast Guard Station Freeport is accepting proposals for qualified individuals or firms to demo RO shed, and electrical wiring at Station Freeport. Prior to submitting a quote, it is mandatory to examine the scope of work and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Station Freeport.

Location:

United States Coast Guard Station Freeport 823 Coast Guard Dr.

Freeport, TX 77541

I. Continuity of Facilities Operation: Schedule work to minimize interference with the facility’s normal operations. Normal operating hours are from 7:30am to 3:00pm Monday thru Friday except federal holidays. Any work during other hours unless otherwise instructed or permitted shall be scheduled and approved with the Contracting Officers Representative.

II. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard one week prior to start of work.

III. Coast Guard Contracting Officers Representative: The Contractor shall contact the COR to coordinate all construction efforts onboard Coast Guard Facilities.

MKC Zachery Burris zachery.w.buris@uscg.mil (757) 788-1923 MK1 Terence Totten Terence.L,Totten@uscg.mil 713-805-4339 MK2 Matthew Santini Matthew.g.santini@ucg.mil 757-618-4623

IV: Recycling and Disposal of Refuse: Minor refuse, excess materials resulting from construction operations may be disposed of in base dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. All bulk materials shall be disposed of by contractor. Contractor is responsible for removal and disposal of existing RO shed.

V: Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. Immediate notification to the Contracting Officer’s Representative of lost time due to accidents is required. Provide two copies of workman’s compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations.

VI. Inspection: The Contracting Officer’s Representative has the right to reject defective workmanship or materials or work not performed as per the project specifications. Only the Contracting Officer or his/her representative may accept work performed by the contractor.

VII. Operations and Storage: The contractor is to take whatever steps necessary to ensure that his materials are protected. The Coast Guard has no responsibility for receipt, storage, or mailto:zachery.w.buris@uscg.mil mailto:Matthew.g.santini@ucg.mil protection of contractor’s materials. All equipment, materials and supplies shall be addressed to the contractor. The Coast Guard will not accept shipments. The contractor is responsible for the protection of existing structures, utilities, work and vegetation. Any damage shall be repaired at the contractor’s expense.

VIII. Contractor Identification: The contractor and subcontractor personnel shall, at all times, wear company identification.

IX. Existing Utilities: The Contractor shall field verify all utility locations before commencing work. This shall include, but not be limited to, the use of visual, sonic, electronic or magnetic detection devices. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.

VIII: SCOPE OF WORK: Contractor shall provide all labor, materials, and equipment necessary to complete the following unless noted below:

ITEM NAME

Demolish building and haul off debris, replace electrical panel with weather proof junction box, replace existing front gate panel.

LOCATION:

USCG STA FREEPORT

823 Coast Guard Dr.

Freeport, TX 77541 All Materials and Labor as provided by contractor must be complete, comparable to existing and approved by Contracting Officer.

REQUIREMENTS:

Demo RO shed, and electrical

1. SCOPE

Remove RO shed (including steel columns and tin sheeting) and dispose of debris Remove electrical panel and wiring, install weather proof junction box to supply power to front gate Remove existing electrical panel on pump house and dispose of debris Install weather proof electrical panel on pump house Install new 20a breaker for front gate in new weather proof panel on pump house Government-The government is not providing any materials for this project.

2. REFERENCES

COAST GUARD DRAWINGS None.

OTHER REFERENCES None.

3. REQUIREMENTS

3.1 General.

MANUFACTURER: N/A

CHARACTERISTICS:

RO shed demo, new weather proof junction box, new weather proof electrical panel

WARRANTY:

A. Standard Manufacturer's Warranty for all replacement parts and materials

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of product and workmanship.

FOR OFFICIAL USE ONLY

EM1 breaker panel on second deck suppling 220v to the RO shed panel “A”

RO Shed panel “A” that supplies the Pump House Panel “NP”. This panel is not needed. 220v needs to be junction here to supply panel

NP at and the pump house for the front gate.

Pump House panel “NP” that supplies 110v to only the front gate, all other circuit have been removed. This panel needs to be replaced.

Location:
United States Coast Guard Station Freeport