This document is a Scope of Work (SOW) for the sealcoating, crack filling, and striping of the parking lot at the U.S. Coast Guard (USCG) Station Bellingham in Bellingham, WA. The contractor must provide all labor, equipment, and materials to perform the required tasks, which include sealing cracks, cleaning and prepping the parking lot, sealing weather drains, applying a two-coat sealcoat, painting parking lot stripes, and performing a final quality check.

The related federal contract opportunity is a Request for Quotation (RFQ) solicitation issued by the USCG, with Solicitation Number USCG-SPS-0007. This is a set-aside for small businesses, with the NAICS code 561790 and a $9.5M size standard. Quotes are due by 3:00 PM PDT on Monday, September 16, 2024, and the award will be made on a Lowest Price Technically Acceptable (LPTA) basis. The Service Contract Act Wage Determination 2015-5549 Revision 23, last revised on December 26, 2023, applies to this acquisition.

View the file

Other files

File Type Posted
Station.png PNG image
SF1449.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

U.S. COAST GUARD

USCG Station Bellingham Sealcoat/Crack Fill/Striping of STA Parking Lot

PSN:

SECTION 1 –GENERAL INFORMATION

1.0 Scope of Work: The contractor must provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform as defined in this scope of work. The contractor must perform to the standards in this contract.

1.1.1 Place of Performance:

1.1.1.1 Unit: USCG Station Bellingham

Location: 28 Bellwether Way Bellingham, WA.

1.1.2 Contracting Officer:

1.1.2.1 Name:

Unit:

PH:

E-mail:

1.1.3 Contracting Officer’s Point of Contact:

1.1.3.1 Name: MKC Richard Manzer

Unit: USCG Station Bellingham

PH: (818)879-3435

E-mail: Richard.W.Manzer@uscg.mil

1.1.4 Unit Point of Contact:

1.1.4.1 Name: MKC Richard Manzer

Unit: USCG Station Bellingham

PH: (818)879-3435

E-mail: Richard.W.Manzer@uscg.mil

1.1.5 Contact for questions:

1.1.5.1 Any questions regarding scope of work must be directed to the Contracting Officer.

1.1.5.2 All requests for site visits must be scheduled through the POC. Requests can be submitted via phone call or e-mail.

1.1.5.3 A site visit is highly suggested but not mandatory.

1.2 Contractor Personnel

1.2.1 Contract Manager

The contractor must provide a contract manager who must be responsible for the performance of the work. The name of this person, and an alternate or alternates, who must act for the contractor when the manager is absent, must be designated in writing to the contracting officer.

1.2.1.1 The contract manager or alternate must have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

1.2.1.2 The contract manager and alternate or alternates must be able to read write, speak, and understand the English language.

1.2.2 Contractor Employees

The contractor must not employ persons for work on this contract if such employee is considered by the contracting officer to be a potential threat to the health, safety, security, general well –being, or operational mission of the installation and its population.

1.2.2.1 Contractor personnel must present a neat appearance and be easily recognized as contractor employees.

1.2.2.2 The contractor must not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest. Additionally, the contractor must not employ any person who is an employee of the U.S. Coast Guard unless such person seeks and receives approval according to U.S. Coast Guard regulations.

1.2.3 Security Requirements

Due to heightened Security at USCG Facilities, all contractor employees performing tasks related to this scope of work, while onboard a Coast Guard facility, shall wear identification badges. The identification badges must, at a minimum, contain contractors’ business name, contractor employees’ name and contractor employees’ picture. Time spent undergoing entrance to USCG facilities will not be considered a government delay of work or differing site condition.

1.3 Hours of Operation

1.3.1 The contractor must perform the tasks as required by the scope of work under this contract during normal working hours. Work must be performed during the following hours: Monday through Friday between 8:00am and 4:00pm unless other times are specified in advance to the Contracting Officer.

Requests for work on the weekends shall be submitted through the Contracting Officer and will be approved on a case by case basis.

1.3.2 Holidays: If applicable

1.3.3 Special event, or adjusted work hours: If circumstances should arise wherein the contractor desires a different work schedule as required in section 1.3.1 above, the contractor must request same in writing. Submit written request to the government Point of Contact a minimum of 24 hours before the requested adjusted work schedule. If the desired schedule change is to be effective on a Monday, the request must be submitted to the COR/COTR prior to 8:00am on the Friday prior to commencement of work.

1.4 Award

It is the governments’ intent to make award to the low cost responsive and responsible offeror through issuance of a firm fixed price contract.

1.5 Invoicing

Invoices must be mailed in to address as per the contract. To insure proper payment, all invoices shall have requisition number/order number, company name and address, DUNS number, invoice number and date clearly indicated on your invoice. It is recommended that the offeror attach a copy of the Purchase Order/Contract to their invoice(s).

SECTION 2 – DEFINITIONS

2.1 General Definitions

When the scope of work, solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulations (FAR), the word or term has the same meaning as the definition as contained in section 2.101 of the FAR. The FAR index is available via the Internet at http://www.acqnet.gov at the end of the FAR, after the FAR Appendix.

2.1.1 Defective Service: A service or commodity output that does not meet the standard of performance requirement specified in the contract for that service or commodity.

2.1.2 Quality Assurance: A planned and systematic pattern of all government actions necessary to provide confidence that adequate technical requirements are established; products and services conform to established technical requirements; and satisfactory performance is achieved. Quality assurance refers to actions by the government assurance functions for a contracted service.

2.1.3 Technical Definitions: Not applicable to contract.

SECTION 3 – GOVERNMENT FURNISHED PROPERTY AND SERVICES

The Government must provide the facilities, equipment, and materials, and services listed here.

3.1 Government Furnished Facilities – None

3.2 Government Furnished Equipment – None

3.3 Government Furnished Utilities - The following utilities are available for use at no cost by the contractor:

Electricity: 120 Volt, single phase Potable Water: Sink or standard garden hose connection

3.4 Government Furnished Material – None

SECTION 4 – CONTRACTOR FURNISHED ITEMS AND SERVICES

Except for those items, services, or commodities specifically stated in Section 3 as Government Furnished, the contractor must furnish everything needed to perform this contract according to all its terms.

SECTION 5 – SPECIFIC TASKS

5.1 General: Provide labor, equipment and materials to perform the below described sealcoating, crack filling and striping of the parking lot.

5.1.1 Seal all cracks that are visible in the entirety of the parking lot.

5.1.2 Clean and prep the parking lot for seal coating. Seal coating will take place on previously mapped out areas.

5.1.3 Seal all weather drains to prevent hazardous material from entering storm drains

5.1.4 Seal coat parking lot on mapped out areas using a 2 coat application process.

5.1.5 Paint stripes on the parking lot using 10’ foot stall layout.

5.1.6 Conduct a final quality check with unit representative and make any necessary repairs.

5.1.7 Remove all excess materials and hazardous waste that were generated during work.

5.2 Location and Equipment:

5.2.1 United States Coast Guard / Station Bellingham

28 Bellwether Way Bellingham, WA

5.3 CONTROL AND DISPOSAL OF WASTES: With the exception of materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government, all wastes and demolished materials become the contractor’s property and shall be removed from the job site daily in accordance with all local, state, and federal environmental regulations.

5.4 Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 – Safety and Health Regulations for Construction.

5.5 Operations and Storage Facilities: The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the on site representative with the concurrence of the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor’s performance.

SECTION 6 – APPLICABLE PUBLICATIONS AND FORMS

Publications and forms that apply to the PWS are listed below. The publications and forms have been designated as either mandatory or informational. The contractor is obliged to follow those publications and use those forms designated as mandatory to the extent specified in other sections of this PWS. The contractor must be guided by those publications or use those forms designated as informational to the extent necessary to accomplish requirements in this PWS.

6.1 Publications

6.1.1 Mandatory Publications

OSHA Safety and Health Standards, 29 CFR Part 1926 – Safety and Health Regulations for Construction.

6.1.2 Informational Publications- none