SOW SSU24-020.doc

DOC document 252 KB Posted

Attached to
SSU24-020 ECDIS TROUBLESHOOT AND REPAIR CASREP
Solicitation number
N4044624Q0002
Issued by

About this file

This document outlines a service order for updating shipboard electronic chart display information systems on board the USNS Miguel Keith. The Navy seeks a factory authorized technical representative to troubleshoot, repair, and update Raytheon ECDIS NX units on the vessel. The representative must provide qualifications to the port engineer prior to work. Issues include expired permits, charts that will not update due to being out of sequence, and a lack of base data discs. The representative is required to request technical support and resolve the outlined problems on all ECDIS units. Drawings and additional reports are not required. General requirements are unspecified.

View the file

Other files

File Type Posted
N4044624Q0002 Amendment 1.docx DOCX document
SSJ_Redacted Amendment 1.pdf PDF
SSJ_Redacted.pdf PDF
N4044624Q0002.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS MIGUEL KEITH

(T-ESB 5)

COMMUNICATION AND NAVIGATIONAL AIDS
SERVICE ORDER NO. SO-24-020

1/05/2024

MSC/ OLY SAMONTE

ITEM NO. 0415
CATEGORY "A"

SHIPBOARD ELECTRONIC CHART DISPLAY INFORMATION SYSTEM (ECDIS) SYSTEM UPDATES

1.0 ABSTRACT:

1.1 This item describes the requirement to update the shipboard Raytheon ECDIS NX Units.

2.0 REFERENCES:

2.1.1 References available onboard

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location/Quantity:

3.1.1 Various ECDIS,

3.2 Item Description/Manufacturer’s Data: ECDIS NX, 1 EA

Charthandler 4.0.2.0

SevenCs EC2007ECDIS Kernel Version 5.22

S63: User Permit 535BDAF99D4611D940735E34339

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1 through 7, 22, 23, 28, and 29.

5.2 The contractor and all subcontractors regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3 THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER AUTHORIZATION.

5.4 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK, AND WHITE. ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED AND PROVEN OTHERWISE. TEST ALL ELECTRICAL CABLES TO ENSURE THEY ARE DE-ENERGIZED PRIOR TO WORKING ON THE ITEM.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 All work to be done to the satisfaction of the Ship’s Captain and Ship’s Navigator.

7.0 STATEMENT OF WORK REQUIRED:

7.1 This item describes the requirement to update the ship’s Raytheon ECDIS NX Units.

7.1.1 Provide the Port Engineer with a signed letter of qualification from the Original Equipment Manufacturer and certificate of training for the field service representative for the equipment listed in paragraph 3.0 prior to the start of any work.

7.1.2 The factory authorized technical representative shall be factory trained and certified on Raytheon ECDIS.

7.2 Tag-Out all required systems and equipment with Ship’s Force.

7.3 PROBLEM: MIGUEL KEITH’s Raytheon ECDIS NX Need Updates For all ECDIS NX Units Onboard.

· Delete the database on 1 ECDIS Unit.

· Ship’s operating ECDIS’ permits have expired as well as the charts.

· System will not take updates, error code says it out of sequence.

· MIGUEL KEITH does not have the base data disc.

7.4 Request Tech support to Troubleshoot, repair and update all onboard ECDIS Units.

7.5 Preparation of drawings/report: None additional.

8.0 GENERAL REQUIREMENTS: None additional.