SOW_SSN_652-17-103 SPS OR Vert.pdf
PDF 29 KB Posted
- Solicitation number
- 36C24625Q0173
About this file
This document is a Statement of Work (SOW) for the installation of two new dumbwaiters in the Main Building 500 of the Central Virginia VA Health Care System in Richmond, Virginia. The work includes modifying the existing structure to accommodate the new dumbwaiters and modifying or installing new structure, electric power, lighting, controls, and HVAC to have fully operational dumbwaiters traveling between the basement and 3rd floors. The period of performance is 365 calendar days.
The related federal contract opportunity is a pre-solicitation notice for construction services to complete the work described in the SOW. The Department of Veterans Affairs, Network Contracting Office 6 is conducting market research to identify potential Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and Veteran-Owned Small Businesses (VOSBs) capable of performing the work, with a potential contract value between $2,000,000 and $5,000,000. The North American Industry Classification System (NAICS) code is 238290 with a $22.0 million size standard. Interested firms are instructed to provide a capability statement, information on their small business status, and details on their relevant past projects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24625Q0173.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Central Virginia VA Health Care System
Project # 652-17-103
SPS/OR Vertical Transport
-- Project Scope --
General Intent
a. Contractor shall install two (2) new dumbwaiters in the Main building 500 of the Central Virginia
VA Health Care System (CVHCS) formerly Hunter Holmes McGuire VA Medical Center in
Richmond, Virginia. Work includes but not limited to modifying the existing structure to accommodate new dumbwaiters and modifying the existing and/or installing new structure, electric power, lighting, controls, and HVAC needed to have operational dumbwaiters traveling between the basement and the 3rd floors. Complete details of project scope will be included in the drawings and specifications.
b. Unless otherwise specified the Contractor must provide all supplies, materials, personnel, equipment, tools, supervision, and other items and services required to complete the project scope.
c. Offices of Miller-Remick, LLC., as Architect Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his/her duly authorized representative.
d. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
Period of Performance:
This contract has a period of performance of 365 calendar days.