SOW SSDG HEAT EXCHANGER CLEANING.docx

DOCX document 93 KB Posted

Attached to
USCGC HAMILTON NR3 SSDG Heat Exchanger Commercial Cleaning
Solicitation number
70Z08526Q0026250
Issued by

About this file

This is a Statement of Work (SOW) for commercial cleaning and renewal of a CAT SSDG heat exchanger aboard USCGC HAMILTON (WMSL-753) at USCG Base Charleston in North Charleston, South Carolina. The work is a firm-fixed-price, 100% total small business set-aside under NAICS code 336611 with a small business size standard of 1,300 employees, utilizing Product Service Code 2090. The contract period of performance runs from July 1, 2026 to July 7, 2026.

The contractor must perform all labor and services including transportation (pickup and delivery coordination with the Port Engineer), disassembly, cleaning, and reassembly of the heat exchanger in accordance with Coast Guard Tech Pub 7119, Section 11 and CAT Special Procedure REHS2599-091. Specific tasks include disassembling the heat exchanger, cleaning plates with OEM-approved solvents (paraffinic or naphtha-based only), replacing gaskets, seals, and o-rings with OEM parts, reassembling and torquing bolts to 160 ft-lbs (±30 ft-lbs), and performing leak testing prior to delivery. The contractor must document all cleanliness inspections, solvents used, parts replaced, and test results, submitting documentation to the Technical Point of Contact (LTJG Bryan Chan). All personnel requiring base access must have a REAL ID and be submitted to the Port Engineer one business day prior to pickup. Award will be made to the responsible offeror with the lowest evaluated price among those receiving acceptable ratings for Technical Capability and Past Performance, both evaluated on a Pass/Fail basis.

View the file

Other files

File Type Posted
Provisions and Clauses_supply.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR

WMSL-753 SSDG Heat Exchanger Cleaning

1. OBJECTIVE

1.1. CGC HAMILTON (WMSL-753) requires commercial cleaning and renewal of a CAT SSDG heat exchanger. This Statement of Work (SOW) outlines the requested work for commercial cleaning of this plate style cooler.

2. REFERENCES

2.1. Coast Guard Tech Pub 7119, Section 11, which is a copy of CAT Special Procedure REHS2599-091 dated 7 May 2014

3. TASKS

3.1. Transportation. The Contractor is responsible for the pickup and delivery of the heat exchanger at USCG Base Charleston in coordination with the Port Engineer.

3.2. Disassembly and cleaning. The Contractor must disassemble the heat exchanger in a shop, conduct cleaning, and replace gaskets, seals, and o-rings. Conduct disassembly and cleaning in accordance with the procedures and precautions required by TP 7119, Section 11.

3.2.1. Mark the outside of the plates diagonally and ensure plates removed for cleaning are kept in order throughout the process of cleaning.

3.2.2. Clean plates and inspect sealing surfaces and in accordance with the tech manual.

3.2.3. Clean the plates with OEM approved solvents, and do not exceed soaking times noted in the technical guidance which are known to cause damage to plates or gaskets. Recommended solvents are listed below. CAT technical support may provide an updated list.

· Paraffinic based solvent

· Naphtha based solvent

3.2.4. Solvents listed below prohibited by TP 7119 must not be used.

· Ketones (acetone, methylketone, or methylisobutyketone)

· Esters (ethlacetate or butylacetate)

· Halogenated hydrocarbons (chlorothene, carbon tetrachloride, or freons)

· Aromatics (benzens, or toluene).

3.2.5. Replace plate gaskets, seals, and o-rings using OEM parts in accordance with Tech Pub 7119

3.2.6. Document cleanliness of the inspected plates, seals, and gaskets, the solvents used, and any parts replaced. Submit documentation to the Technical Point of Contact.

3.3. Reassembly. The Contractor must have the reassemble the heat exchanger in accordance with TP 7119, Section 11.

3.3.1. Press the plates together, remove the bars, and install and torque bolts to 160 ft-lb (+/- 30 ft-lb) in accordance with the OEM torque specifications. Mark torqued bolts.

3.3.2. Replace all collars and liners – Items 6 and 8, respectively, in illustration from TP 7119, Section 11.

3.4. Test. The Contractor must test and ensure the heat exchanger has no leaks after reassembly in accordance with TP 7119 prior to delivery back to the Coast Guard. Submit testing documentation to the Technical Point of Contact.

4. LOCATION & ACCESS

· Address: USCG Base Charleston 1050 Register St. North Charleston, SC 29405

· Contractor must have a REAL ID for Base Access and must submit names to Port Engineer 01 business day prior to coordinated pick up.

5. PERIOD OF PERFORMANCE

01 July 2026 to 07 July 2026

6. TECHNICAL POC

LTJG Bryan Chan bryan.e.chan@uscg.mil

(510) 882-0364

7. NOTES

7.1. Heat Exchanger Diagram Snapshot

image1.png