SOW-SPS Water Testing.docx
DOCX document 37 KB Posted
- Attached to
- H246--608-21-3-4808-0244- Water Testing for Sterile Processing Service base plus 4 Federal contract opportunity
- Solicitation number
- 36C24121Q0614
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| P07 Wage for Manchester NH 2015-4019 revision 15 04222021.pdf | ||
| Copy of Past Performance Worksheet 1.xlsx | XLSX spreadsheet | |
| 36C24121Q0614_2.docx | DOCX document | |
| LOS Certification 12102020.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Water Testing for Sterile Processing Service (SPS)
1.0 INTRODUCTION
The purpose of this contract is to obtain water testing services for the Manchester Veterans Affairs Medical Center (VAMC), located at 718 Smyth Road, Manchester, NH 03104. The primary goal is to meet the Veterans Affairs National Program Office for Sterile Processing (NPOSP/10NC6) guidance that requires testing and monitoring per AAMI ST-79 TIR 34.
2.0 REQUIREMENTS
Contractor shall furnish all labor, supervision, materials, supplies, and equipment necessary to accomplish each listed task in this statement of work to accomplish the requirements of the VAMC.
2.1 Water Sample Collection
The Contractor will collect water samples from two designated sampling points within the facility Sterile Processing Service (SPS). Sample parameters and frequency will be in accordance with Table 1 in this document. Refer to AAMI TIR34 for more details on testing requirements.
Sample points will be for SPS critical water as defined by AAMI TIR34. This currently includes two separate deionized water supplies (i.e. two sample points) that feed the decontamination sinks and washer/disinfector in SPS. Samples can be collected from the existing port for the washer and any faucet on the sink.
Both existing sample points are in the decontamination side of SPS which requires specialized personal protective equipment (PPE) to enter. The contractor will be required to don all appropriate PPE which will be provided by the VAMC upon entry.
Samples are to be collected and received/accepted by the testing laboratory within 24 hours. Contractor to ensure samples arrive during the laboratory’s normal operating hours.
The contractor will be required to schedule water sample collection with the COR.
Contractor staff collecting samples be will be trained and follow SM 9060 for potable water sample collection.
2.2 Water Sample Analysis
Sample analysis will be conducted by a laboratory that holds current accreditation for each analyte and method.
2.3 Results Reporting
The VAMC will be provided with a copy of the sample chain of custody and laboratory results reports. Turnaround times (TAT) for results reporting are listed Table 1. Results may be provided to designated VAMC points of contact via email.
Additionally, the contractor will provide a copy of the standardized testing process for each parameter for government review prior to work start. This process must be followed each time the samples are taken a report furnished to the VA stating that the testing was done in accordance with the approved procedures.
Results reports will include the name of the laboratory that performed the analysis, test method, sample source name and location, the date and time the sample was collected, received and analyzed.
The Contactor will notify the VAMC of any samples that exceed hold time or temperature, whereupon the VAMC will determine whether to proceed with analysis or have the Contractor resample at no additional cost to the VAMC.
2.4 Resample/Additional Samples
If any samples results are above the specifications of AAMI TIR34, the VAMC may request additional samples be collected outside the regular sample frequency. The Contractor will have 7 days upon notice by the VAMC to resample or collect additional samples.
2.5 Responses
The Contractor will respond to basic inquiries and clarifications of sample results within 6 hours of inquiry from the VAMC. The Contract will notify the VAMC 14 days in advance to schedule regular sample collection. The Contractor will coordinate timing with the COR so SPS operations are not impacted. This may mean testing has to occur off-tour.
3.0 MATERIALS AVAILABLE
The Contractor is responsible for supplying all needed materials and supplies to carry out work under this contract.
4.0 PERFORMANCE REQUIREMENTS
4.1 The Contractor has an ongoing obligation throughout the Period of Performance to notify the VA Contracting Officer immediately and in writing, upon its loss (or any of its subcontractors) of any required certification, accreditation, or licensure.
4.2 Contractor shall follow VA requirements for physical and information security. Contractor’s assigned employees will be subject to background investigation and shall obtain temporary contractor badging for all employees servicing the contract prior to performing site work.
4.3 All work (except for street sweeping) will be performed between the hours of 7:00am to 4:30 pm Monday through Friday, excluding federal holidays, except where off hours are specified. Off hours and weekend work may be requested of the VAMC Contract Officer’s Representative (COR) with a 48-hour request notice.
4.4 The provisions of all applicable OSHA, EPA, and all Federal, State, and local regulations shall be followed throughout the course of this project.
4.5 Contractor vehicles, including those of their employees, are to be parked at the end of Lot “E”. This parking lot is located by the salt shed at the north end of campus. No vehicles will be allowed to park around buildings or at loading dock areas. Loading docks are available for use for unloading and loading of materials and tools then must be moved to parking lot “E”.
4.6 Smoking is not permitted on campus.
5.0 SAFTEY REQUIREMENTS
The Contractor will comply with all OSHA, NEC, as well as all national, federal, and state requirements as needed. Contractor will wear appropriate personal protective equipment (PPE) throughout work. Contractor will comply with Infection Control requirements to include, but not limited to wearing a surgical mask and/or shield as required.
6.0 REFERENCES/ATTACHMENTS
Table 1
7.0 EVALUATION (required for review prior to award)
| Pass/Fail |
| Item |
Staff organization chart showing all personnel who will be working on the project and their capacity/function.
Staff qualifications, training, accreditations, and licenses
Proof of contractor competency/training
Proof of laboratory qualifications
Table 1 Water Quality Monitoring
| Characteristic |
| Test Type |
| Test Frequency |
| Results TAT |
| Bacteria |
| Heterotrophic plate count (HPC) |
SM 9215
| Monthly |
| 72 hours of laboratory sample receipt |
| pH |
| pH meter field test |
| Monthly |
| 14 days of laboratory sample receipt |
| Endotoxins* |
| LAL Kinetic Chromogenic Assay |
| On installation, modification, or |
repair of the Critical Water treatment system or when persistent increased microbial levels are detected by HPC, ATP, or TOC 14 days of laboratory sample receipt
| Total organic carbon (TOC) |
| SM 5310 |
| Quarterly |
| 14 days of laboratory sample receipt |
| Hardness |
| Total Hardness as CaCO3 per Method 200.7 |
| Annually |
| 14 days of laboratory sample receipt |
| Ionic contaminants (chloride, iron, copper, manganese) |
| Method 200.7 |
| Annually |
| 14 days of laboratory sample receipt |
*Contractor should price this based off one test per year ** Note; this table is per sample location (there will be two).
File details come from the government source that posted it. Updated .