This document outlines a statement of work for installing an electric vehicle charging station at the Arthur R. Marshall Loxahatchee National Wildlife Refuge. The contractor will install a ChargePoint CPF50 Level 2 charging station outside the visitor center by June 30, 2023. The work will include attaching a breaker box to an existing pad-mounted transformer, running electrical wiring to connect the breaker box to the charging station, and coordinating trenching for the wire installation with refuge staff. The contractor must provide all necessary materials and labor in accordance with ChargePoint specifications, electrical and safety codes, and complete a quality inspection to ensure proper installation.

View the file

Other files

File Type Posted
Sol_140FC123Q0020.pdf PDF
General_Wage_Decision_No__FL20230220_3_24_23.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Install ChargePoint EV Charger

NAICS code 238210

1. General:

1.1 Install a ChargePoint CPF50 Level 2 Charging Station at the Arthur R. Marshall Loxahatchee NWR, 10216 Lee Road, Boynton Beach, FL 33473-4797.

1.2 The purpose of the project is to install a ChargePoint CPF50 Level 2 Charging Station.

1.3 The Contractor should have experience installing electric car chargers of this capacity.

The contractor will need to sign ChargePoint’s CPF50 Construction Signoff Form verifying that the charger was installed according to ChargePoint Specifications.

1.4 Work will require installing the ChargePoint CPF50 Level 2 Charging Station without damaging the surrounding equipment. The electrical install will comply with all electrical, building, and safety codes.

2. Place of Performance and Period of Performance .

2.1 Arthur R. Marshall Loxahatchee NWR

10216 Lee Road Boynton Beach, FL 33473-4797 Worked will be performed outside the Visitor Center, east of the building.

2.2 The period of performance will 30 days after issuance of the Notice to Proceed. The project shall take place in coordination with the COR to ensure that the electrical wiring placed within 24 hours of the rench being dug by U.S. Fish and Wildlife (FWS) staff. The Visitor Center and parking lot will remain open during normal business hours.

Precautions must be taken by the contractor to minimize disturbance to visitors.

2.3 Normal business hours Monday thru Friday 8:00 a.m. - 4:30 p.m. Work will be completed during normal business hours unless after hour work is requested by contractor and approved by COR. In the event of emergencies, Contractor shall provide contact information.

2.4 Work will not be performed after business hours, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’ Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).

3. Scope

3.1 The contractor shall install the ChargePoint CPF50 Level 2 Charging Station using ChargePoint specifications. Installation of the charger will include attaching a breaker box to the pad-mounted transformer on the east side of the building. The contractor will provide all materials and labor to install this breaker box and run electrical wiring connecting the breaker box to the charging station. FWS will provide the ChargePoint CPF50 Level 2 Charging Station, but the contractor will be responsible assembling and mounting the station. FWS will dig the trenching for wire installation, but the contractor will need to coordinate with the COR so trenching and charger installation can be done in tandem. The charger will be installed at the closest parking space to the pad-mounted transformer (eastern most handicap spot).

Figure 1. Pad-Mounted Transformer.

Figure 2. Area where the CPF 50 will be placed.

4. Deliverables and/or Delivery Schedule:

4.1 The contractor shall obtain the materials necessary for the project before the period of performance. The materials will be compatible with installation of the ChargePoint CPF50 Level 2 Charging Station, installed at the Maximum 50A (Standard) Specifications for One Station (AC Voltage 208/ 240VAC) as outlined in the ChargePoint Specifications attached, including:

• 70A/80A dual pole (non-GFCI) service panel breaker box

• One 70A/80A branch circuit

• 3-wire (L1, L2, Earth) 32’ in length

• All related hardware and components for proper install

The contractor is responsible for getting all materials to the project site and removing excess materials at the completion of the project.

4.2 Identify the type of documentation (printed and electronic-such as manuals) to be provided, as well as those quality indicators desired by the Government.

• A signed CPF50 Construction Signoff Form.

5. Evaluation and Acceptance

5.1 The contractor will be evaluated as detailed herein. Government acceptance is contingent upon: A final inspection will be performed to ensure proper installation, operation, and professional workmanship.

6. Quality Control/Quality Assurance:

6.1 Where appropriate, QC will be maintained according to industry standards and made available to the agency with the contractor’s proposal.

6.2 QA/QC will be determined by final inspection to ensure the charger is fully, properly, and professionally installed and functioning in accordance with trade standards, applicable codes, and product design.

7. Technical Coordinator:

7.1 Jamie Schieler

Arthur R. Marshall Loxahatchee NWR 10216 Lee Road Boynton Beach, FL 33473-4797 jamie_schieler@fws.gov / (561) 903-6357

7.2 Steve Henry, Deputy Project Leader

Arthur R. Marshall Loxahatchee NWR 10216 Lee Road Boynton Beach, FL 33473-4797 steven_s_henry@fws.gov / (561) 735-6021 chargepoint.com/support 75-001409-01 r1

Sales Order Number (SO#)

CPF50 Construction Signoff Form This form is required to ensure the site for your ChargePoint EV charging station(s) has been prepared as specified, by you or by your chosen contractor, before beginning your charging station installation. Submit this completed form, and the photos specified, to installdispatch@chargepoint.com. The detailed data sheets, site design guides, and installation guides defining ChargePoint specifications are online at:

chargepointuniversity.com.

IMPORTANT: All installations must comply with all applicable codes. ChargePoint provides concrete pedestal guidance in the CPF50 Site Design Guide that is applicable for most sites; however, the size for a given site might be different due to site conditions. Ensure site drawings have been completed and approved by a structural engineer for this site.

Note: If your station installer arrives to install your station and finds these items incomplete, you will incur a separate re-dispatch charge.

Site Information Contractor Information Site Address: Company Name:

Number of CPF50 stations to be installed Pedestal: Wall:

Site Lead Name:

Number of Gateways to be installed: Site Lead Job Title:

Contact Name: Site Lead Email:

Contact Phone: Site Lead Phone:

Contact Email: Date Work Began (mm/dd/yyyy):

Take the following photos of each station throughout the site construction process.

Required Pictures

1. Concrete pad showing anchor bolts, conduit, and wire for each station -or- Wall station location with flex conduit and wire for each station

2. Gateway location

3. Overall space around the concrete pad, showing all service clearances are available

4. The electrical panel’s specification label, to show total panel capacity

5. The open electrical panel with the dead front panel removed, showing terminations

6. The open electrical panel with the dead front panel on, showing breaker amperage ratings and labels for CPF50 connections

Civil Work – Pedestal Mount

1. A new concrete pad was either designed and approved by a structural engineer for this specific site, or is a newly poured pad with:

• At least 600 mm (24 in) on each side, including underground.

• Follows one of the three recommended pedestal patterns in the Site Design Guide.

• Concrete 2500 PSI minimum.

• Mounting bolts positioned at least 150 mm (6 in) from the edges of the pad when measured from the center of any bolt.

-or- An existing concrete pad with:

• A minimum concrete volume of 0.23 m3 (8 ft3).

• A minimum concrete depth of least 150 mm (6 in) thick.

• Mounting bolts positioned at least 150 mm (6 in) from the edges of the pad when measured from the center of any bolt.

2. Four anchor bolts extend 60 mm +/- 5 mm (2.3 in +/- ¼ in) above the concrete. Bolts are plumb and secure in concrete or epoxy.

3. The center of the conduit stub-up (a) is at least 230 mm (9.1 in) from obstructions to the rear.

4. Conduit extends 300-600 mm (12-24 in) and wire extends 1.5 m (5 ft) above grade.

5. Walls, fences, or slopes do not prevent water from draining from the pad.

a

Civil Work – Wall Mount

1. Rigid or flexible conduit brings wire to the entry point of the station.

2. 600 mm (24 in) of wire extends beyond the conduit to enter the terminal block.

3. The wall is smooth, plumb, stable, and can support the charging station in use.

Electrical Work

1. Electrical infrastructure has been completed in accordance with all applicable codes and ChargePoint specifications.

2. Each circuit has a dual-pole, non-GFCI circuit breaker. Amperage: ________

3. Each circuit breaker is new or in good working order.

4. Breakers are correctly labeled in the panel.

5. Only bonded neutral systems are used.

System Type Select 120/240 VAC 1Ø bonded neutral 120/208 VAC 3Ø WYE bonded neutral 120/240 VAC 3Ø Delta center tap-grounded bonded neutral

6. The Gateway mounting location has been tested for 4G/LTE cellular coverage and shows an RSRP of -85 dBm or better (and an RSRQ of -10 or better).

7. The station mounting location is within 45 m (150 ft) line-of-sight of its Gateway.

Installation Readiness

1. All station boxes are delivered, available, and contents are undamaged.

2. The installation site is clean and safe for installation.

I, , hereby certify that the scope of work in this form has been correctly completed.

Signature Date

ChargePoint® CPF50 Level 2 Charging Stations for Fleet Specifications and Ordering Information

ChargePoint CPF50 Datasheet

ChargePoint, Inc. | Copyright © 2022 2 of 13

Ordering Information The order codes below represent specific product configurations. Other product options are available. Please contact ChargePoint Sales for information and order codes.

Hardware

Description Order Code

Model Single Port, Pedestal 5.4m (18’) Cable with 6' Cable Management Kit

CPF50-L18-PEDMNT-CMK6

Dual Port, Pedestal, 5.4m (18’) Cable with 6' Cable Management Kit

CPF50-L18-PEDMNT-CMK-Dual

Single Port, Wall, 5.4m (18’) Cable with 6' Cable Management Kit

CPF50-L18-WALLMNT-CMK6

Single Port, Pedestal, 7.0m (23’) Cable with 8' Cable Management Kit

CPF50-L23-PEDMNT-CMK8

Dual Port, Pedestal, 7.0m (23’) Cable with 8' Cable Management Kit

CPF50-L23-PEDMNT-CMK8-Dual

Single Port, Wall, 7.0m (23’) Cable with 8' Cable Management Kit

CPF50-L23-WALLMNT-CMK8

Replacement Cable

5.4m (18’). 50A, Charging Cable, CMK version

7.0m (23’), 50A, Charging Cable, CMK version

CPFCABLE-T1-50A-L18-CMK-F

CPFCABLE-T1-50A-L23-CMK-F

Required Companion Products Description Order Code

ChargePoint Cloud Plan Please contact ChargePoint sales

ChargePoint Gateway*

(1 required for every 9 stations)

CPGW1-LTE

* The ChargePoint Gateway is required for all CPF50 installations. ChargePoint certified installers will do a site validation and order the ChargePoint Gateway as needed. In addition, the site host is responsible for providing power to the gateway. The ChargePoint Gateway is owned and maintained by ChargePoint.

ChargePoint, Inc. | Copyright © 2022 3 of 13

The Gateway should be located where cellular signal levels are optimal for LTE. Each Gateway must be located within 150 feet line-of-sight to as many as nine (9) CPF50 charging stations. Each CPF50 charging station has built-in WiFi capability to communicate via the Gateway for ChargePoint network services.

The Gateway is a UL Class 2 device and requires less than four watts power (33 mA@120 V or 19 mA@208 V). ChargePoint recommends hardwire electrical termination to the power source for the Gateway. The Gateway dimensions are 280 mm (11 in) wide by 340 mm (13 3/8 in) long by 137 mm (5 3/8 in) deep.

Recommended Companion Products for Fleet Applications Description Order Code

Station Initial Activation CPSUPPORT-ACTIVE

ChargePoint Assure CPF-ASSURE-n*

*Substitute n for desired years of service (1, 2, 3, 4 or 5)

ChargePoint, Inc. | Copyright © 2022 4 of 13

Architectural Drawings (Dimensions) Single Wall Mount with Cable Management Kit

CPF50-L18-WALLMNT-CMK6ft (6 ft)

ChargePoint, Inc. | Copyright © 2022 5 of 13

Single Wall Mount with Cable Management Kit

CPF50-L23-WALLMNT-CMK8ft (8 ft)

Single Pedestal Mount with Cable Management Kit

CPF50-L18-PEDMNT-CMK6 (6 ft)

ChargePoint, Inc. | Copyright © 2022 7 of 13

Single Pedestal Mount with Cable Management Kit

CPF50-L23-PEDMNT-CMK8 (8 ft)

ChargePoint, Inc. | Copyright © 2022 8 of 13

Dual Pedestal Mount with Cable Management Kit

CPF50-L18-PEDMNT-CMK6-Dual (6 ft)

ChargePoint, Inc. | Copyright © 2022 9 of 13

Dual Pedestal Mount with Cable Management Kit

CPF50-L23-PEDMNT-CMK8-Dual (8 ft)

ChargePoint, Inc. | Copyright © 2022 10 of 13

General Specifications Electrical Input CPF50 supports flexible current settings up to 50A to fit your needs.

Power Select allows CPF50 stations to be installed and software-configured for current input/output lower than the maximum 50A rating depending on your electrical and charging requirements. CPF50 Power Select current input/output options include 16A, 24A, 32A, 40A, and 48A.

Power Share allows two stations to share power from a single circuit dynamically across the stations, adjusting each station’s power output depending on whether one or both are actively charging. Standard wiring uses an independent circuit for each station.

Power Share can be used in combination with Power Select.

Electrical Input

One Station (AC Voltage 208 / 240V AC)

Two Stations (AC Voltage 208 / 240V AC)

Input Current

Input Power Connection

Required Service Panel

Breaker

Input Current

Input Power Connection

Required Service Panel

Breaker

Maximum 50A (Standard) 50A

One 70A/80A branch circuit

70A/80A dual pole

(non-

GFCI)

50A x 2

Two independent

70A/80A branch circuits

70A/80A dual pole

(non GFCI) x 2

Maximum 50A (Power Share) N/A N/A N/A 50A

One 70A/80A branch circuit split to two

70A/80A dual pole

(non GFCI)

Power Select 16A - 48A (Standard)

16A - 48A

One branch circuit rated

125% of input current (20A - 60A)

Dual pole (non-

GFCI)

rated

125% of input current (20A- 60A)

16A - 48A x 2

Two independent branch circuits rated

125% of input current (20A - 60A)

Dual pole (non-GFCI) rated 125% of input current x 2

Power Select 16A - 48A (Power Share) N/A N/A N/A 16A -

48A

One branch circuit rated

125% of input current (20A to 60A) split to two

Dual pole (non-GFCI) rated 125% of input current

(20A- 60A)

ChargePoint, Inc. | Copyright © 2022 11 of 13

Service Panel/Breaker

GFCI

Do not provide external GFCI as it may conflict with internal GFCI

(CCID)

Wiring – Standard 3-wire (L1, L2, Earth)

No neutral

3-wire (L1, L2, Earth) x 2

No neutral

Wiring – Power Share N/A 3-wire (L1, L2, Earth) split to 3-wire (L1, L2, Earth) x 2

Station Power 2.5W typical (standby), 4W maximum (operation)

5W typical (standby), 8W maximum (operation)

Line to Ground Voltage 120V +/- 10%

Electrical Output

Electrical Output Single Port (AC Voltage 208 / 240V AC)

Dual Port (AC Voltage 208 / 240V AC)

Maximum 50A (Standard) 12 kW (240V AC @ 50A) 12 kW (240V AC @ 50A)

Maximum 50A (Power Share)

N/A 12 kW (240V AC @ 50A) x 1 or

6 kW (240V AC @ 25A) x 2

Power Select 16A - 48A (Standard)

3.8 kW – 11.5 kW (240V AC @ 16A - 48A)

3.8 kW – 11.5 kW (240V AC @ 16A - 48A) x 2

Power Select 16A - 48A (Power Share)

N/A 3.8 kW – 11.5 kW (240V AC @ 16A - 48A) x 1 or

1.9 kW – 5.8 kW (240V AC @ 8A - 24A) x 2

Functional Interfaces Connector Types SAE J1772™

Cable Length – 1.8 m (6’) Cable Management

5.4 m (18’)

ChargePoint, Inc. | Copyright © 2022 12 of 13

Cable Length – 2.4 m (8’) Cable Management

7.0 m (23’)

Overhead Cable Management System

Yes

Card Reader ISO 15693 and ISO 14443

Indicators WiFi LED

Yes

Fault Indicator per UL Yes

Status LED Yes

Safety and Connectivity Features Ground Fault Detection 20mA CCID with auto retry

Open Safety Ground Detection

Continuously monitors presence of safety (green wire) ground connection

Plug-Out Detection Power terminated per SAE J1772™ specifications

Power Measurement Accuracy

+/- 2% from 2% to full scale (50A)

Power Report/Store Interval

15 minute, aligned to hour

Local Area Network 2.4/5 GHz Wi-Fi (802.11 a/b/g/n)

Wide Area Network 4G LTE provided by the ChargePoint Gateway CPGWx

Safety and Operational Ratings Station Enclosure Rating Type 3R per UL 50E

Safety and Compliance UL and C-UL listed; complies with UL2594, UL2231-1, UL 2231-2. NEC Article 625 compliant. For Canada CSA C22.2, No. 280, 281.1, 281.2, CED UL and C-UL listed per UL916 Energy Management Equipment

ChargePoint, Inc. | Copyright © 2022 13 of 13

Station Surge Protection 6 kV @ 3000A. In geographic areas subject to frequent thunder storms, supplemental surge protection at the service panel is recommended

EMC Compliance FCC Part 15 Class B

Storage Temperature -40ºC to +60ºC (-40ºF to 140ºF)

Operating Temperature -40ºC to +50ºC (-40ºF to 122ºF)

Operating Humidity Up to 95% @+50ºC (122ºF) non-condensing

Non-Operating Humidity Up to 95% @+50ºC (122ºF) non-condensing

Maximum Charging Stations per 802.11 Radio Group

9 maximum. Each station must be located within 46 m (150’) “line of sight” of a CPGW gateway

ChargePoint, Inc. reserves the right to alter product offerings and specifications at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document

ChargePoint, Inc.

240 East Hacienda Avenue Campbell, CA 95008-6617 USA

Contact Us

Visit chargepoint.com

Call +1.408.370.3802 or +1.877.370.3802 US and Canada toll-free

Email sales@chargepoint.com

Copyright © 2021 ChargePoint, Inc. All rights reserved. CHARGEPOINT is a U.S.

registered trademark/service mark, and an EU registered logo mark of ChargePoint, Inc.

All other products or services mentioned are the trademarks, service marks, registered trademarks or registered service marks of their respective owners. 27 July 2022.

ENERGY STAR certified. Listed by Underwriters Laboratories Inc.

http://www.chargepoint.com/ mailto:sales%40chargepoint.com?subject=

CPF50ConstructSignoffForm
cpf50-ds-fleet-enus
Ordering Information
Hardware
Required Companion Products
Recommended Companion Products for Fleet Applications
Architectural Drawings (Dimensions)
General Specifications
Electrical Input
Electrical Output
Functional Interfaces
Indicators
Safety and Connectivity Features
Safety and Operational Ratings
SOW_EVCharger
1. General:
2. Place of Performance and Period of Performance (Where and When) the project is being completed.
2.1 Annotate the complete address and zip + 4 or closest complete address and zip + 4. Annotate if work is to be performed at the contractor site.
Arthur R. Marshall Loxahatchee NWR
10216 Lee Road
Boynton Beach, FL 33473-4797
Worked will be performed outside the Visitor Center, east of the building.
2.2 Annotate the Performance start and end date. Annotate any conditions, limitations, or windows of opportunity impacted by the habitat, seasons or weather, or other projects.
The period of performance will be June 21st- June 30th, 2023. The project shall take place in coordination with the COR to ensure that the electrical wiring placed within 24 hours of the trench being dug by U.S. Fish and Wildlife (FWS) staff. The Visi...
2.3 Normal business hours Monday thru Friday 8:00 a.m. - 4:30 p.m. Work will be completed during normal business hours unless after hour work is requested by contractor and approved by COR. In the event of emergencies, Contractor shall provide conta...
2.4 Work will not be performed after business hours, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’ Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas...
3. Scope
4. Deliverables and/or Delivery Schedule: (for extended list a bid schedule and/or use of line item detail on the PR is recommended)
Site Address:
Pedestal Count:
Wall Count:
Gateway Count:
Contact Name:
Contact Phone:
Contact Email:
Company Name:
Site Lead Name:
Site Lead Job Title:
Site Lead Email:
Site Lead Phone:
Date Work Began mmddyyyy:
Pic 1: Off
Pic 2: Off
Pic 3: Off
Pic 4: Off
Pic 5: Off
Pic 6: Off
SO#:
Pad: Off
Bolts: Off
Stub-up: Off
Length: Off
Drainage: Off
Conduit: Off
Wire: Off
Strong: Off
Code: Off
Circuit: Off
Amperage:
New: Off
Labeled: Off
Bonded Neutral: Off
120/240VAC10: Off
120/208VAC30: Off
120/240VAC30: Off
Gateway: Off
Line-of-sight: Off
Boxes: Off
Clean: Off
Your Name:
Date: