SOW- Sources Sought.doc

DOC document 240 KB Posted

Attached to
Diesel Engine Lifecycle Support
Solicitation number
N64498-22-RFPREQ-PD-42-0011
Issued by

About this file

This statement of work outlines requirements for diesel engine lifecycle support services. The contractor shall provide engineering, technical, logistics, training, and program management support services related to Fairbanks Morse diesel engines and associated auxiliary systems installed on various classes of U.S. Navy, Military Sealift Command, and U.S. Coast Guard vessels. Specific support is required for engine lines including PC2.5, FMOP, PA6B, FM/ALCO, and FM/MAN. The contractor must have relevant experience and certifications for the engine models supported. The period of performance is five years consisting of one base year and four option years. Work will primarily take place at the contractor's facilities but also includes shipboard and fleet concentration area support.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Fairbanks Morse Defense (FMD) Diesel Engine Lifecycle Support

1.0 INTRODUCTION

1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD Code Codes 421 and 422, which have joint responsibility for Lifecycle Management (LCM) and In-Service Engineering (ISE) for US Navy diesel engines.

1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied

1.0.3 Government/Contractor Relationship

1.0.3.1 The services to be delivered under this Contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the Contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.

1.0.3.2 The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.0.3.3 Contractor personnel under this Contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.

1.0.4 Employee Relationship:

1.0.4.1 The services to be performed under this Contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.

1.0.4.2 Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.

1.0.4.3 Inapplicability of Employee Benefits: This Contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.

1.0.4.4 It is the Contractor's, as well as the Government's, responsibility to monitor Contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.

1.0.4.4.1 The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule or performance will be impacted.

1.0.4.4.2 The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:

(i) Confirm the conduct is in violation and when necessary direct the mode of further performance,

(ii) Countermand any communication regarded as a violation,

(iii) Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or

(iv) In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.

1.1 BACKGROUND

The Combatant & Nuclear Ships Diesels Branch NSWCPD’s (Code 422) branch is the In-Service Engineering Agent (ISEA) and its mission involves maintaining adequate and effective operational readiness, safety and mission effectiveness of US Navy diesel engines and their associated auxiliary systems. Additionally, NSWCPD works collaboratively and synergistically with Military Sealift Command (MSC) and the United States Coast Guard (USCG) to address lifecycle and in-service issues related to MSC and USCG shipboard diesel engine systems. In support of this mission, NSWCPD provides engineered solutions to fleet diesel problems.

Diesel Engine Original Equipment Manufacturers (OEMs) design, construct, install, service, support and provide repair and replacement parts for the engines under their purview. They possess certain unique knowledge, experience and expertise, and access to technical information that is not available elsewhere. In support of its Diesel Engine LCM and ISEA mission, NSWCPD intends to leverage off the contractor’s unique knowledge, experience and expertise, and access to technical information related to the engine lines listed in Appendix 1, for the purpose of improving in-service and lifecycle support initiatives. The contractor will assist NSWCPD in developing, delivering and executing engineered solutions to fleet diesel problem

1.2 SCOPE OF WORK

The overall scope of this SOW is to provide lifecycle, modernization and in-service support for the engine lines listed in Appendix 1 and their related shipboard auxiliary and support systems. The support required will involve technical, logistics, training, administrative and program management efforts related to diesel engine lifecycle and in-service concerns. The contractor shall provide all services, personnel, facilities, expertise, technical information, special tools, supplies and incidental materials necessary to execute the performance requirements detailed in this SOW.

2.0 APPLICABLE DOCUMENTS

2.1 Applicable and reference documents will be specified at the individual Task Order level.

3.0. REQUIREMENTS

Within the scope of this Contract, the contractor shall provide all labor, supplies, services, materials, expertise, information, special tools, procedures and facilities necessary to support NSWCPD’s mission as LCM and ISEA for US Navy Diesel Engines. Major functions the contractor will be expected to perform include:

3.1 Engineering & Technical Services - The contractor shall provide engineered solutions to existing problems. Engineering & technical services expected to be supplied on this contract include:

· technical issue resolution

· FMD/Navy owners group execution and support

· engineering investigations

· failure analysis, root cause determination and associated light repairs

· damage assessment and repair scoping associated with emergent failures

· product improvements (design, development, testing & evaluation, and deployment),

· new technology development and integration

· technical documentation product development, revision and update

· land-based and shipboard testing and evaluation.

· field technical service support in conjunction with engineering efforts and taskings

3.2 Logistics Support Services - The contractor shall provide necessary product line expertise and information necessary to support the development, updating and revision of various Navy logistics products, including:

· engine configuration management and associated Allowance Parts Lists (APLs)

· parts and sub-assembly provisioning

· technical manuals

· planned maintenance system (PMS) procedures

· maintenance standards

· drawings

· parts stocking and availability

3.3 Engine Training Services – The contractor shall provide training services in support of customer requirements. Training services include providing seats/space in existing training courses as well as the development of new training curriculum and courses as identified by the customer. Training shall be conducted at the contractor’s training facilities as well as in fleet concentration areas when specified. Training dates shall be coordinated by the contractor and customer at the individual task order level.

3.4 Program Management Services – The contractor shall provide program management services in support of the efforts included in the scope of this contract. The contractor’s Program Manager will be the Government’s primary point of contact regarding contract execution matters. Program management duties and tasks will include, but are not limited to: contract management, budgeting, scheduling, planning, executing, prioritizing, progress tracking (task and financial), and planning of tasks, projects and programs. The Program manager shall be well versed in Government contract management and administration, including funding allocation (CLINs and SLINs), invoicing and supporting documentation, and manpower reporting.

3.5 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components –

3.5.1 The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.

4.0 DATA REQUIREMENTS

4.1 General

All products, documentation, data files and masters for reports etc. developed during the performance of this requirement are the property of the Government and shall be turned over to NSWCPD upon request or at the completion of the order. Deliverables shall be developed and submitted in accordance with the Contract Data Requirements List (CDRLs) and the, specific requirement of each TO. Both electronic and hard copy deliverables may be required. Work products shall be submitted in media (e.g., DOC, XLS, PDF, etc.) as mutually agreed upon prior to submission. Unless otherwise specified, deliverable products may be in contractor format.

4.2 Acceptance Criteria

Final inspection and acceptance of all work, reports, and other deliverables will be performed by the Government’s Subject Matter Expert (SME) at the place of delivery. General quality measures, as set forth below, will be applied to each work product delivered under this SOW.

4.2.1 Accuracy - Deliverables shall be accurate in presentation, technical content, and adherence to accepted elements of style.

4.2.2 Clarity – Deliverables shall be clear and concise. Any/all diagrams/text shall be easy to understand and be relevant to the supporting narrative.

4.2.3 Consistency to Requirements - All deliverables must satisfy the general requirements of this statement of work as well as the specific requirements of each TO.

4.2.4 File Editing - All electronic text and diagrammatic files shall be editable by the Government unless otherwise agreed.

4.2.5 Timeliness - Deliverables shall be submitted on or before the due date specified by the Government.

4.3 The contractor shall provide the following deliverables during the execution of Task Orders under this Contract. The specific requirements for each deliverable are provided in applicable Contract Data Requirements Lists (CDRLs).

4.3.1 Status Report (CDRL A001)

4.1.5.1 The contractor shall provide a progress report, the timeframe of which will be defined in individual Task Orders.

4.3.1.2 This report shall reflect both prime and subcontractor data, if applicable, and at the same level of detail.

4.3.2 Travel Report (CDRL A002)

4.3.2.1 The contractor shall develop and submit a report for each trip or travel occurrence conducted in support of this contract.

4.3.2.2 This report shall reflect both prime and subcontractor data, if applicable, at the same level of detail.

4.3.3 Project Planning Chart (CDRL A003)

4.3.3.1 The contractor shall develop and submit Project Planning Charts as specified at the individual Task Order level. The Project Planning Chart shall graphically depict the schedule and actual progress of work on a specific Task Order.

4.3.3.2 This report shall reflect both prime and subcontractor data if applicable at the same level of detail.

4.3.4 Technical Reports (CDRL A004)

4.3.4.1 All other deliverables and data items submitted as part of Task Orders awarded under this contract (not already covered by another CDRL) shall be submitted as technical reports.

4.3.4.2 This report shall reflect both prime and subcontractor data if applicable at the same level of detail.

4.3.5 Condition Found Reports (CDRL A005)

4.3.5.1 The Condition Found Report (CFR) shall be used as a means to communicate conditions found during Task Order execution. Additionally, CFRs shall be used to identify needed repairs and recommended corrective action for work discovered during the execution of Task Orders awarded under this Contract that is not covered by the Task Order statement of work.

4.3.5.2 This report shall reflect both prime and subcontractor data if applicable at the same level of detail.

4.3.6 Government Furnished Property (GFP) Inventory Baseline Report (CDRL A006) 4.3.6.1 The GFP Inventory Baseline Report is required when GFP is provided.

4.3.6.2 This report shall reflect both prime and subcontractor data if applicable at the same level of detail.

4.3.7 Government Furnished Property (GFP) Inventory Final Report (CDRL A007)

4.3.7.1 The GFP Inventory Final Report is required as a follow-on to the GFP Inventory Baseline Report, when applicable.

4.3.7.2 This report shall reflect both prime and subcontractor data if applicable at the same level of detail.

5.0 SECURITY REQUIREMENTS

5.1 SECURITY TRAINING. The Contractor is responsible for completing all required Government mandated training to maintain security and network access to government sites and IT systems to include but not limited to: Antiterrorism Level 1 Awareness; Records Management in the DON: Everyone's Responsibility; Training and Readiness: The Active Shooter; NAVSEA Introduction to Controlled Unclassified Information; Operations Security (OPSEC); NAVSEA Counterintelligence Training; Privacy and Personally Identifiable Information (PII) Awareness Training; NAVSEA Physical Security training and Cybersecurity 101 Training. Certificates of successful completion shall be sent to the COR and as otherwise specified in the contract.

5.1.1 In accordance with the National Industrial Security Program Operating Manual (NISPOM) (37 CFR Part 117), Contractor personnel that require access to Department of Navy (DON) information systems and/or work on-site require an open investigation or favorable adjudicated Tier 3 by the Vetting Risk Operations Center (VROC). An interim clearance is granted by VROC and recorded in the Defense Information System for Security (DISS). An open or closed investigation with a favorable adjudication is required prior to issuance of a badge providing access to NSWCPD buildings. Furthermore, if the Navy Central Adjudication Facility, have made an unfavorable determination access will be denied. For Common Access Card (CAC) you must have an open investigation and/or a favorably adjudicated investigation. Interim security clearance are acceptable for a CAC. Access will be denied for anyone that has eligibility pending in DISS. Vetting through the National Crime Information Center, Sex Offender Registry, and the Terrorist screening database shall be process for a contractor that does not have a favorable adjudicated investigation.

5.1.2 Within 30 days after contract award, the contractor shall submit a list of all contractor personnel, including subcontractor employees, who will have access to DON information systems and/or work on-site at one of the NSWCPD sites to the appointed Contracting Officer Representative (COR) via email. The contractor shall provide each employee's first name, last name, contract number, the NSWCPD technical code, work location, whether or not the employee has a CAC and or Standard Access Control Badge (SACB), the systems the employee can access (i.e., NMCI, RDT&E), and the name of the Contractor's local point of contact, phone number and email address. Throughout the period of performance of the contract, the Contractor shall immediately provide any updated information to the COR when any Contractor personnel changes occur including substitutions or departures.

5.2 ON SITE WORK. Contractor personnel that require a badge to work on-site at one of the NSWCPD sites must provide an I-9 form to verify proof of citizenship. The I-9 form should be signed by the company Facility Security Officer or the company Human Resource Department. In addition to the I-9 form, Contractors shall also bring their birth certificate, current United States Passport or naturalization certificate and state issued ID to the NSWCPD Security Officer at the time of badge request to verify citizenship. Any contractor that has unfavorable information that has not been favorably adjudicated, by Department of Defense Central Adjudication Facility (DOD CAF) will not be issued a badge. Finally, contractors shall supply a copy of their OPSEC Training Certificate or other proof that the training has been completed.

5.2.1 In accordance with NSWCPD security protocol, contractor employees who hold dual citizenship will not be granted security clearance to our facilities.

5.3 DD254 REQUIREMENT. This effort may require access to classified information up to the CONFIDENTIAL level. No classified data will be generated or stored by the Contractor. The Contractor is required to have and maintain a CONFIDENTIAL clearance. The requirements of the attached DD Form 254 apply.

5.3.1 The contractor is required to maintain a Facility Security Clearance (FCL) in accordance with the DD254 to perform certain work under the contract. Although it is not required at time of award, it shall be obtained within 90 DAYS after award. Otherwise the government will have no obligation to continue ordering work under the contract and may not exercise any of the available options.

5.3.2 The Contractor shall appoint a Facility Security Officer (FSO), who shall (1) be responsible for all security aspects of the work performed under this contract, (2) assure compliance with the National Industrial Security Program Operating Manual (NISPOM) (32 CFR Part 117), and (3) assure compliance with any written instructions from the NSWCPD, Security Office, Code 1051.

5.3.3 The contractor shall forward signed copies of DD254s provided to subcontractors to the Naval Surface Warfare Center Philadelphia Division (NSWCPD), ATTN: Security.

5.3.4 The contractor shall direct the subcontractor to obtain approval, through the prime Contractor, for the public release of information received or generated by the sub through the prime Contractor.

5.3.5 The contractor shall submit the subcontractor request for public release through the technical point of contact identified on the DD 254.

5.4 OPERATIONS SECURITY (OPSEC)

5.4.1 The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure. The NSWC Philadelphia Division's (NSWCPD) Critical Information List (CIL)/ CIIL (Critical Indicators and information list) will be provided on site, if warranted. Performance under this contract requires the contractor to adhere to OPSEC requirements. The Contractor may not impose OPSEC requirements on its subcontractors unless NSWCPD approves the OPSEC requirements. During the period of this contract, the Contractor may be exposed to, use, or produce, NSWCPD Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NSWCPD’s CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence (FOCI) unless such FOCI has been appropriately mitigated through measures approved by the Defense Counterintelligence and Security Agency. Questions concerning these requirements shall be directed to the PCO.

5.4.2 CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations.

Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer. Component/System outside storage, staging, and test areas shall be shielded/obscured from public view wherever physically possible.

5.4.3 NSWCPD’s CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public facing websites. Media requests related to this project shall be directed to the PCO, and the COR who will forward the required to the NSWCPD Public Release Authority for review.

5.4.4 Any attempt by unauthorized third parties to solicit, obtain, photograph, or record, or; incidents of loss/compromise of government Classified or CI, Business Sensitive, Company Proprietary information related to this or other program must be immediately reported to the contractor's Facility Security Officer and Cognizant Security Office and/or the Naval Criminal Investigative Service, and the NSWC PD Security Division (Code 105).

5.5 RECEIPT, STORAGE, AND GENERATION OF CONTROLLED UNCLASSIFIED INFORMATION (CUI) All Controlled Unclassified Information (CUI) associated with this contract must follow the minimum marking requirements of DoDI 5200.48, Section 3, paragraph 3.4.a, and include the acronym "CUI" in the banner and footer of the document. In accordance with DoDI 5200.48, CUI must be safeguarded to prevent Unauthorized Disclosure (UD). CUI export controlled technical information or other scientific, technical, and engineering information must be marked with an export control warning as directed in DoDI 5230.24, DoDD 5230.25, and Part 250 of Title 32, CFR. Nonfederal information systems storing and processing CUI shall be protected per NIST SP-800-171, or subsequent revisions. All transmissions to personal email accounts (AOL, Yahoo, Hotmail, Comcast, etc.) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.) are prohibited. Destroy CUI associated with this contract by any of the following approved methods: A cross-cut shredder; a certified commercial destruction vendor; a central destruction facility; incineration; chemical decomposition; pulverizing, disintegration; or methods approved for classified destruction.

5.6 Planning, Programming, Budgeting and Execution (PPBE) Data.

When contractor employees, in the performance of their duties, are exposed to Planning, Programming, Budgeting and Execution (PPBE) data, a Non-Disclosure Agreement (NDA) with all affected contactor personnel must be executed in coordination with the COR and PCO to ensure safeguarding disclosure of this data.

5.7 U-NNPI SECURITY REQUIREMENTS

5.7.1 Security Classification Guidance is as follows of portions of the tasking on this contract when invoked in the task order statement of work:

5.7.1.1 Contractor requires access to information and equipment classified at the Confidential National Security Information (NSI) level in order to provide industrial support services within facilities that actively supports the Navy Nuclear Propulsion Program (NNPP).

5.7.1.2 All contractor personnel accessing classified information or classified material associated with the performance of work related to the resultant contract must be United States citizens, and shall have and maintain at a minimum Confidential security clearance.

5.7.1.3 The Contractor is responsible for completing all required government mandated training to maintain security and network access to government sites and IT systems, as necessary to support.

6.0 PLACE OF PERFORMANCE

6.1 The primary place of performance for this contract will be at the Contractor’s facilities, fleet concentration areas in the continental United States (CONUS), and shipboard locations outside of the continental United States (OCONUS). It is estimated that 80% of the work will occur at the contractor’s facilities and 20% of the work will occur shipboard and/or at ship homeport locations. Only as-needed work will be performed at Government sites, either via local site visits or formal travel orders to remote locations.

7.0 TRAVEL

7.1 The Contractor may be required to travel from the primary performance location when supporting this requirement. The estimated number of trips is 44 for the entire period of performance. While the majority of work will be performed at the Contractor’s site(s) and at facilities at/near the designated fleet concentration areas, the Contractor will be required to attend meetings and perform visits in the performance of the various tasks assigned under this contract. Such visits will be to Navy activities, ships, industrial areas, and the facilities of other contractors, corporations and businesses associated with each particular task. Ships visits may be accomplished during industrial repair availabilities and may require isolated underway periods. The estimated travel requirements for the entire contract period of performance are detailed in Table 1. The contractor shall make their own travel arrangements and process their own clearance data/messages required for admission to appropriate facilities.

The contractor shall be required to travel CONUS and OCONUS to accomplish the tasks contained in this contract. Travel in support of this requirement is anticipated to include, but may not be limited to, the following alternate performance locations:

Destination
Number of Individuals
Number of Days
Number of Trips
Philadelphia, PA
2
3
20
Norfolk, VA
2
5
5
Mayport, FL
2
5
5
San Diego, CA
2
5
5
Pearl Harbor, HI
2
10
2
Bahrain
2
15
2
Yokosuka, Japan
2
15
2
Sasebo, Japan
2
15
3

7.2 The number of times the Contractor may be required to travel to each location cited above may vary as program requirements dictate, provided that the total estimated travel cost is not exceeded. The numbers of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements. All travel shall be approved before travel occurs. Approval may be via email by the Contracting Officer (PCO), the Contacting Officer’s Representative (COR) or the fully executed Technical Instruction (TI) signed by the Contracting Officer.

7.2.1 In accordance with the TI instructions, before initiating any travel the Contractor(s) shall submit a detailed and fully-burdened estimate that includes the number of employees traveling, their expected travel costs for airfare, lodging, per diem, rental car, taxi/mileage and any other costs or actions requiring approval. The travel estimate shall be submitted to the Contracting Officer's Representative (COR) and Contract Specialist. Actuals cost, resulting from the performance of travel requirements, shall be reported as part of the Contractor's status report (CDRL A001). The reportable cost shall also be traceable to the Contractor's invoice

7.3 All travel shall be conducted in accordance with FAR 31.205-46, Travel Costs, and B-231-H001 Travel Cost (NAVSEA) and shall be pre-approved by the COR (CDRL A002).

7.4 Travel Costs

7.4.1 The current “maximum per diem” rates are set forth in the (i) Federal Travel Regulations for travel in the Continental United States; (ii) Joint Travel Regulations for Overseas Non-Foreign areas (e.g., Alaska, Hawaii, Guam, Puerto Rico, etc.); and (ii) Department of State (DOS) prescribed rates for foreign overseas locations.

7.5 OCONUS Contractor Personnel Travel During COVID-19

In consideration of personnel movement during the COVID-19 pandemic, Force Health Protection (FHP) guidance has been issued for contractor personnel who travel OCONUS for deployment and for conducting official travel OCONUS as well. Entry requirements are communicated to traveling personnel, including contractor personnel, through the Electronic Foreign Clearance Guide (EFCG). Contractor personnel must adhere to current country entry requirements of the respective geographic combatant command (GCC) (which may include screening, ROM, and testing) and all applicable host nation procedures. All contracts including performance outside the United States require DoD contractor personnel to complete a risk assessment of health status.

8.0 GOVERNMENT FURNISHED PROPERTY

GFP maybe required for completion of tasks under this SOW. All Government Furnished Property is property of the U.S. Government and shall not be transferred to any individual or agency, public or private, without the express written approval of the originating Contracting Officer except as required for the specific performance of tasks under this task order. Accountability for Government Property under this task order shall be managed in accordance with FAR Part 45 and DFARS Part 245 as well as the Government Property clauses in the Task Order whether acquired by the prime or subcontractors (Contractor Acquired Property), provided by the Government, or received directly from another commercial source as a deliverable from a Government issued contract.

Additional Government Property accountability requirements are outlined in the following Directives and Instructions and shall be adhered to as applicable:

· DODI 4161.02, Accountability & Management of Government Contract Property

· DoDM 4140.01, DoD Supply Chain Material Management Procedures: Material Returns, Retention and Disposition

· DODI 5000.64, Accountability & Management of DoD Equipment and Other Accountable Property

· OPNAVINST 4440.26B, Operating Materials & Supplies and Government Furnished Material Management

· SECNAVINST 5200.43A, Property Management

GFP will be identified at the Task Order level when applicable.

8.1 Reporting

The Contractor shall perform reporting functions and actions to maintain an accurate accounting of property. Receipt Reporting: DFARS 252.211-7007 requires the Contractor to report receipt of all GFP using the PIEE GFP Module.

8.2 Shipping Notification

FAR 52.245-1 requires the Contractor to report when GFP is returned to the

Government, and the DoD Vendor Guide requires this notification be provided by posting electronic shipping notification to the PIEE GFP Module.

8.3 Inventory Reporting

FAR 52.245-1 requires the Contractor to periodically perform, record, and disclose physical inventory results. While the FAR clause does not define “periodically,” SECNAVINST

5200.43A requires on-hand inventory count reports to support property type specific inventory requirements as set forth in their respective governing instructions. This report is to be delivered according to Exhibit X, Government Property Inventory Report. The Contractor shall provide support within a reasonable time after the Government’s written request to support any Government audit in which GFP, or its related documentation, is requested as part of normal audit processes.

8.4 Lost, Damaged or Stolen GFP Reporting

FAR clause 52.245-1 requires the Contractor to investigate and report to the Government all incidents of property loss as soon as the facts become known. DFARS

252.245-7002, further requires the Contractor to report lost, damaged or stolen Government property using the Property Loss functionality within the PIEE GFP Module. The Contractor shall support the Government’s process to assign liability and document loss in support of lost, damaged or stolen GFP.

8.5 Excess Property Reporting: SECNAVINST 5200.43A requires unused or excess GFP be properly dispositioned soon as the excess is identified without waiting for formal contract closeout processing.

Recovering excess property from the Contractor via the Plant Clearance Automated Reutilization

Screening System (PCARSS) as soon as possible ensures the property is available to fill other requirements and can potentially reduce the administrative costs of the contract.

8.6 Property Disposition

Government Property Distribution shall be in line with FAR 52.245-1(j). The contractor shall provide a written notice to the Contracting Officer when property held under this contract has not been used in 100 calendar days. All General Equipment/assets provided as GFP shall be returned to the Government for disposition at the completion of its use unless otherwise directed in writing by the Contacting Officer and the Accountable Property Officer.

8.6.1 Property Disposition Instructions

In the event there is excess or unused GFP, Contract Acquired Property (CAP), which requires returning to the Government (delivery instructions), disposal, or transferring to follow-on contracts shall be delivered to TBD on Task Orders with a DD Form 1149. The DD Form 1149 shall include the following:

• Dollar Value

• Purchase Request Number

• Item Description

• Serial Number

• Model Number

• Quantity

• Task Order Number

• Technical Point of Contact

• Assigned Unique Serialized Identification Number

• All Delivered items for which the Government’s unit acquisition cost is $5,000.00 or more shall have an IUID tag and the corresponding information uploaded into iRAPT (Invoicing, Receipt, Acceptance and Property Transfer)

8.6.2 Issuance of the DD 1149 “Requisition and Invoice/Shipping Document” The contractor must obtain a DD-1149s before removing any Government Furnished Property, including Plant, Property, and Equipment (PP&E) from NSWCPD premises for general use. For situations where the contractor picks up/replaces NSWCPD property for maintenance purposes, the contractor shall provide an equipment receipt, showing Manufacturer, Model/Part Number, Serial Number and Asset Number/Barcode, on their company letterhead to the COR. All GFP returned to the Government shall include a DD 1149 to document transfer of liability back to the Government.

8.7 Contract Closeout Reporting: DFARS clause 252.245-7004 directs the Contractor to provide an inventory schedule using the PCARSS system at contract end to begin the disposition and disposal process. Reports generated by PCARSS and delivered to the Government must be used to update the APSR to ensure accountability of GFP returned or disposed of by the Contractor is maintained. Government Furnished Materials Reporting: The Contractor shall provide a report for all materials procured and/or furnished. The report shall include the fields required by the GFM module of the PIEE system IAW DFARS 252.211-7007 and PGI 245.103-72 for the purpose of accountability.

9.0 GOVERNMENT FURNISHED INFORMATION

9.1 GFI may be provided to the contractor at the Task Order level when applicable.

9.2 GFI is for informational purposes and use by the Contractor is optional.

10.0 PURCHASES

10.1 Only items directly used and incidental to the services for this Contract/ and for work within the scope of the Statement of Work, shall be purchased under the Other Direct Cost (ODC) line items. Purchases of an individual item that is valued above $15,000 shall be approved by the Contracting Officer prior to purchase by the Contractor. The purchase request and supporting documentation shall be submitted via email to the Contracting Officer and the Contracting Officer's Representative (COR) it shall be itemized and contain the cost or price analysis performed by the Contractor to determine the reasonableness of the pricing.

10.2 Information Technology (IT) equipment, or services must be approved by the proper approval authority. All IT requirements, regardless of dollar amount, submitted under this Contract shall be submitted to the PCO for review and approval prior to purchase. The definition of information technology is identical to that of the Clinger-Cohen Act, that is, any equipment or interconnected system or subsystem of equipment that is used in the automatic acquisition, storage, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information. Information technology includes computers, ancillary equipment, software, firmware and similar procedures, services (including support services), and related resources.

11.0 Counterfeit Material Prevention

11.1 Non-Electronic Materiels

11.1.1 Department of the Navy contractors (and their subcontractors at all tiers) who obtain critical or high risk materiel shall implement a risk mitigation process as follows:

11.1.1.1 If the materiel is currently in production or currently available, materiel shall be obtained only from authorized suppliers

11.1.1.2 If the materiel is not in production or currently available from authorized suppliers, materiel shall be obtained from suppliers that meet appropriate counterfeit avoidance criteria

11.1.1.3 Contractor shall notify the contracting officer when critical or high risk materiel cannot be obtained from an authorized supplier;

11.1.1.4 Contractor shall take mitigating actions to authenticate the materiel if purchased from an unauthorized supplier

11.1.1.5 Contractor shall report instances of counterfeit and suspect counterfeit materiel to the contracting officer and the GIDEP as soon as the contractor becomes aware of the issue.

12.0 PERSONNEL

12.1 Personnel Requirements. All persons proposed in key and non-key labor categories shall, at the time of proposal submission be U.S. citizens. The contractor shall be responsible for the employment of trained and technically qualified personnel to perform the technical efforts described herein. In addition, the contractor is responsible for organizational and administrative controls necessary to ensure that performance meets or exceeds all contract specification requirements and those set forth in the contract. The Government reserves the right, during the life of this contract, to request resumes on any Non-Key personnel for the purposes of verifying compliance with minimum Education and Experience requirements. Personnel assigned to or utilized by the contractor in the performance of this contract shall be fully capable of performing the contemplated functions of the respective labor categories in an efficient, reliable, and professional manner.

All persons proposed in all labor categories with a reasonable expectation to conduct shipboard visits in support of contract efforts shall, at the time of proposal submission, be U.S. citizens possessing a favorable DCSA adjudication or hold an active Defense Biometric Identification System (DBIDS) credential.

12.2 Clause 52.222-2 "Payment for Overtime Premiums" will provide for the total approved dollar amount of overtime premium or will state “zero” if not approved. If overtime premium has not been approved under this contract in accordance with Clause 52.222-2, overtime effort to be performed shall be requested from the Contracting Officer prior to performance of premium overtime. For overtime premium costs to be allowable costs; the Contracting Officer is required to approve the performance of overtime prior to the actual performance of overtime. The dollar amount in FAR 52.222-2 shall equal overtime premium negotiated between the Government and the prime contractor. This overtime premium amount shall equal the prime contractor's unburdened premium OT labor costs plus the subcontractors' fully-burdened premium OT labor costs.

12.3 The level of effort for the performance of the resultant Contract is based on the following labor categories and hours per year:

NSWCPD Labor Category Title
eCRAFT Title
eCRAFT Code
Gov’t Site Hours
Gov’t Site OT* Hours
Gov’t Site DT* Hours
KTR Site Hours
KTR Site OT Hours
KTR Site DT Hours
Program Manager
Program/Project Manager I
MANP1
384
0
0
1,536
0
0
PC2.5 Engine Line Manager (ELM)
Program/Project Manager I
MANP1
288
0
0
1,152
0
0
FMOP ELM
Program/Project Manager I
MANP1
288
0
0
1,152
0
0
PA6B ELM
Program/Project Manager I
MANP1
384
0
0
1,536
0
0
FM/Alco ELM
Program/Project Manager I
MANP1
38.4
0
0
154
0
0
FM/MAN ELM
Program/Project Manager I
MANP1
38.4
0
0
154
0
0
Mechanical Engineer
Engineer, Mechanical III
EM3
576
0
0
2,304
0
0
Electrical/Controls Engineer
Engineer, Electrical/Electronics III
EE3
576
0
0
2,304
0
0
Analytical Engineer
Engineer, Design III
ED3
576
0
0
2,304
0
0
Mechanical Engineering Technician
Engineering Technician IV
30086
48
48
0
192
192
0
Electrical Engineering Technician
Engineering Technician IV
30086
48
48
0
192
192
0
Senior Field Service Technician
Machinery Maintenance Mechanic
23530
192
96
112
768
384
448
Field Service Technician
Machinery Maintenance Mechanic
23530
192
96
112
768
384
448
Technical Writer
Technical Writer, Supervisory
TECW
288
0
0
1,152
0
0
Graphics Specialist
Drafter/CAD Operator
30062
288
0
0
1,152
0
0
Logistician
Logistician I
LGT1
288
0
0
1,152
0
0
Training Specialist
Specialist, Training I
ST1
192
0
0
768
0
0
Project Specialist
Manager, Administrative II
MANA2
192
0
0
768
0
0

Totals:

4,876.8
288
244
19,507.2
1,152
896

*OT and DT stand for Overtime and Double Time, respectfully.

12.4 Non-Key Personnel

In the performance of this effort, the Contractor shall fully staff the non-key positions listed below with qualified individuals. The Contractor shall provide individuals to fill the non-key positions identified below:

NSWCPD Labor Category Title
eCRAFT Title
eCRAFT Code
Program Manager
Program/Project Manager I
MANP1
PC2.5 Engine Line Manager (ELM)
Program/Project Manager I
MANP1
FMOP ELM
Program/Project Manager I
MANP1
PA6B ELM
Program/Project Manager I
MANP1
FM/Alco ELM
Program/Project Manager I
MANP1
FM/MAN ELM
Program/Project Manager I
MANP1
Mechanical Engineer
Engineer, Mechanical III
EM3
Electrical/Controls Engineer
Engineer, Electrical/Electronics III
EE3
Analytical Engineer
Engineer, Design III
ED3
Mechanical Engineering Technician
Engineering Technician IV
30086
Electrical Engineering Technician
Engineering Technician IV
30086
Senior Field Service Technician
Machinery Maintenance Mechanic
23530
Field Service Technician
Machinery Maintenance Mechanic
23530
Technical Writer
Technical Writer, Supervisory
TECW
Graphics Specialist
Drafter/CAD Operator
30062
Logistician
Logistician I
LGT1
Training Specialist
Specialist, Training I
ST1
Project Specialist
Manager, Administrative II
MANA2

Program Manager (eCRAFT Code MANP1):

Minimum Education: Bachelor’s degree in a technical or project/program management discipline from an accredited college or university. In lieu of education, eight (8) years’ experience in program management, engineering and technical oversight of Government contracts, in addition to the target experience required below. Minimum Experience: Five (5) years’ experience performing Project Management duties including contract management, budgeting, scheduling, planning, estimating, and progress tracking (project and financial) and planning of programs and projects.

PC2.5 Engine Line Manager (ELM)

Program/Project Manager (eCRAFT code MANP1):

Minimum Education: Bachelor of Science degree in Engineering (Mechanical or Electrical from an accredited college or university. In lieu of education, individual shall have ten (10) years’ specialized experience with Fairbanks Morse engine models, with at least eight (8) years’ experience on the PC2.5 engine line Minimum Experience: For the Engine Line Managers (ELMs) that meet the minimum education requirements through a 4-year degree, minimum experience shall be five (5) years’ experience on the PC2.5 engine line.

FMOP Engine Line Manager (ELM)

Program/Project Manager (eCRAFT code MANP1):

Minimum Education: Bachelor of Science degree in Engineering (Mechanical or Electrical preferred) from an accredited college or university. In lieu of education, individual shall have ten (10) years’ specialized experience with Fairbanks Morse engine models, with at least eight (8) years’ experience on the FMOP engine model.

Minimum Experience: Five (5) years’ experience on the FMOP engine line.

PA6B Engine Line Manager (ELM)

Program/Project Manager (eCRAFT code MANP1):

Minimum Education: Bachelor of Science degree in Engineering (Mechanical or Electrical preferred) from an accredited college or university. In lieu of education, individual shall have ten (10) years’ specialized experience with Fairbanks Morse engine models, with at least eight (8) years’ experience on the PA6B engine model.

Minimum Experience: Five (5) years’ experience on the PA6B engine line.

FM/ALCO Engine Line Manager (ELM)

Program/Project Manager (eCRAFT code MANP1):

Minimum Education: Bachelor of Science degree in Engineering (Mechanical or Electrical preferred) from an accredited college or university. In lieu of education, individual shall have ten (10) years’ specialized experience with Fairbanks Morse engine models, with at least eight (8) years’ experience on the FM/ALCO engine model.

Minimum Experience: Five (5) years’ experience on the FM/ALCO engine line.

FM/MAN Engine Line Manager (ELM)

Program/Project Manager (eCRAFT code MANP1):

Minimum Education: Bachelor of Science degree in Engineering (Mechanical or Electrical preferred) from an accredited college or university. In lieu of education, individual shall have ten (10) years’ specialized experience with Fairbanks Morse engine models, with at least eight (8) years’ experience on the FM/MAN engine model.

Minimum Experience: For the Engine Line Managers (ELMs) that meet the minimum education requirements through a 4-year degree, minimum experience shall be five (5) years’ experience on the FM/MAN engine line.

Mechanical Engineer

Engineer, Mechanical III (eCRAFT code EM3):

Minimum Education: Bachelor of Science degree in Mechanical Engineering from an accredited college or university.

Minimum Experience: Individual shall have seven (7) years technical experience in engineering analysis, design, installation, operation, maintenance, troubleshooting, repair and testing of mechanical systems. This experience shall include five (5) years of leading mechanical engineering efforts involving the application of engineering disciplines in the technical field directly related to shipboard diesel engines and associated auxiliary support systems.

Electrical / Controls Engineer

Engineer, Electrical/Electronics III (eCRAFT code EE3):

Minimum Education: Bachelor of Science degree in Electrical Engineering or related engineering discipline from an accredited college or university.

Minimum Experience: Seven (7) years technical experience in engineering analysis, design, installation, operation, maintenance, troubleshooting, repair and testing of electrical, electronic and control systems. This experience shall include five (5) years of leading electrical engineering efforts involving the application of engineering disciplines in the technical field directly related to shipboard diesel engine electrical and control systems, and associated auxiliary support systems.

Analytical Engineer

Engineer, Design III (eCRAFT code ED3):

Minimum Education: Bachelor of Science degree in Mechanical Engineering or a related engineering discipline from an accredited college or university.

Minimum Experience: Seven (7) years technical experience in engineering analysis, design, development and modeling of mechanical and electrical systems. This experience shall include five (5) years’ experience of leading engineering analysis efforts involving the application of engineering disciplines in the technical field directly related to shipboard diesel engines, their related electrical and control systems, and associated auxiliary support systems.

Engineering Technician, Mechanical

Engineering Technician IV (eCRAFT code 30086):

Minimum Education: Bachelor’s or Associate’s Degree in a related engineering or technical discipline from an accredited college or university, or demonstrated curriculum work towards a Bachelor’s or Associate’s degree in a related engineering or technical discipline.

Minimum Experience: Seven (7) years technical experience in the operation, maintenance, troubleshooting, repair and testing of mechanical systems. This experience shall include five (5) years’ experience related to Fairbanks Morse diesel engines and associated auxiliary support systems.

Engineering Technician, Electrical

Engineering Technician IV (eCRAFT code 30086):

Minimum Education: Bachelor’s or Associate’s Degree in a related engineering or technical discipline from an accredited college or university, or demonstrated curriculum work towards a Bachelor’s or Associate’s degree in a related engineering or technical discipline.

Minimum Experience: Individual shall have seven (7) years technical experience in the operation, maintenance, troubleshooting, repair and testing of electrical, electronic and control systems. This experience shall include five (5) years’ experience related to Fairbanks Morse diesel engine electrical, electronic and control systems, and associated auxiliary support systems.

Senior Field Service Technician

Machinery Maintenance Mechanic (eCRAFT code 23530):

Minimum Education: High School diploma or GED equivalent. Additionally, individual shall have factory Senior Field Service certification on Fairbanks Morse diesel engines.

Minimum Experience: Ten (10) years technical experience in maintenance, troubleshooting and repair of shipboard diesel engines and related auxiliary support systems, to include five (5) years’ experience related to Fairbanks Morse diesel engines and associated auxiliary support systems.

Field Service Technician Machinery Maintenance Mechanic (eCRAFT code 23530):

Minimum Education: High School diploma or GED equivalent. Additionally, individual shall have factory Field Service certification on Fairbanks Morse diesel engines.

Minimum Experience: Five (5) years technical experience in maintenance, troubleshooting and repair of shipboard diesel engines and related auxiliary support systems, to include three (3) years’ experience related to Fairbanks Morse diesel engines and associated auxiliary support systems.

Technical Writer

Technical Writer, Supervisory (eCRAFT code TECW):

Minimum Education: Bachelor’s degree in English, Journalism, Engineering…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .