SOW SO-26-001 Hiller FM200 Bottle.pdf

PDF 148 KB Posted

Attached to
FM-200 Bottle Procurement and Install Federal contract opportunity
Solicitation number
N0040626QS078
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This Mechanical Service Order (SO-26-001) for a T-AKE Class ship specifies the procurement and installation of an FM-200 Bottle (Cylinder No. 16) for a Maritime Sealift Command (MSC) vessel. The service order requires an ABS Recognized Service Supplier to procure 607 lbs of FM-200 agent, associated flex/heavy duty discharge hoses, and ship the new cylinder to the MSC Korea Warehouse in Busan, South Korea. A minimum of one Technical Representative must assist with installation and perform comprehensive testing and inspection of the firefighting system.

The period of performance is from January 06, 2026 to March 01, 2026. Key requirements include coordinating with the ship's force for equipment lockout/tagout, conducting a pre-work meeting with the Chief Engineer, performing detailed system inspections (including piping, controls, valves, and nozzles), conducting functional tests in the presence of OMT Representative and ABS, and ensuring all personnel are certified and knowledgeable about the system. The service provider must use only OEM authorized parts and submit a completion/trip report upon finishing the work.

View the file

Other files for this federal contract opportunity

Other files attached to FM-200 Bottle Procurement and Install, newest first.
File Type Posted
Combined SYN SOL N0040626QS078.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(T-AKE Class)

Mechanical Service Order SO-26-001 12 December 2025

SO-26-001 FM200 Bottle MSC/N756/WLP

SO-26-001-1

1.0 ABSTRACT

1.1 This item provides for the procurement and

installation of the ship’s FM200 Bottle, cylinder 16.

2.0 REFERENCES/ENCLOSURES: None

3.0 ITEM LOCATION/DESCRIPTION

3.1 Description/Quantity

3.1.1 N/A

3.2 Manufacturer’s Data:

N/A

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES

5.1 Period of Performance: January 06, 2026 to March 01, 2026.

6.0 QUALITY ASSURANCE REQUIREMENTS

6.1 All work shall be performed by a Manufacturer’s

Authorized Service Facility or on board the ship.

SO-26-001-2

7.0 STATEMENT OF WORK REQUIRED

7.1 Provide the services of a manufacturer’s authorized

service facility to procure the ship’s FM-200 Cylinder bottle No.16, installation and testing of the Ship’s FM200 in accordance with manufacturer's standards.

7.1.1 The authorized service rep shall accomplish

the following:

7.1.1.1 Procure the FM-200 Bottle Cylinder

No.16. Procurement shall include 607lbs of FM200 agent, associated flex/heavy duty flex/discharge hoses and shipping of the new cylinder bottle to MSC Korea Warehouse in Busan South Korea.

7.1.1.2 Provide labor of a minimum of one

Technical Representative to help install the new FM200 Bottle.

7.2 Coordinate with ship’s force to have the associated

equipment and system locked and/or tagged out per ship’s lock out/tag out policy to prevent accidental discharge.

When the maintenance is complete, coordinate with ship’s force to have associated equipment unlocked and/or tagged in per ship’s lock out/tag out policy.

7.2.1 Tag-out the fixed gas firefighting systems

and controls to prevent accidental discharge.

7.3 Prior to accomplishing any work, conduct a meeting

with the vessels Chief Engineer and OMT Rep to determine what ship’s equipment will be shut down by the testing.

It may be necessary to temporarily disconnect interlock circuits before beginning the work. Any ship’s circuits that are disconnected during the servicing must be re-connected and functionally tested when the servicing is completed to ensure the extinguishing system is operable.

7.4 Upon completion of the installation, test the FM-200

bottle.

7.4.1 Inspect all piping, controls, actuators, SO-26-001-3

remote pulls, valves, time delays, pressure switches, sirens and alarms, extinguishing agent, expelling means and physical condition to verify the system is in good order.

7.4.2 Visually examine all flexible hoses (hoses, loops,..) and their associated components connecting the high pressure cylinders and pilot cylinders to the distribution manifold/piping using the manufacturer’s recommendations as guidance. Submit a condition report identifying any found damaged, decayed, or unserviceable.

7.4.3 Verify the discharge piping and nozzles are

clear of any external obstructions. Nozzles should be inspected to ensure they have not been blocked or obstructed by the storage of spare parts or a new installation of structure or machinery.

7.4.4 Verify the discharge piping and nozzles are

clear of any internal obstructions. Isolate the discharge piping from the system and blow dry compressed air or nitrogen through the piping to confirm the pipework and nozzles are clear. To be demonstrated in the presence of an OMT Rep.

7.4.5 Verify all control/section valves are in the

correct position.

7.4.6 Visually inspect the boundaries of the

protected space to confirm that no modifications have been made to the enclosure that have created un-closeable openings that would render the system ineffective. If cylinders are installed inside the protected space, verify the integrity of the double release lines inside the protected space, and check low pressure or circuit integrity monitors on release cabinet, as applicable.

7.4.7 Check connections of all manifolds and

distribution piping for tightness.

SO-26-001-4

7.4.8 Upon successful completion, re-mark the

cylinders in accordance with 46 CFR §147.60 through 67.

7.4.9 Secure a tag or label to all cylinders

indicating inspection and maintenance was performed. The tag at a minimum is to include the type of extinguishing agent, test date (month/year) and name of test facility.

7.4.10 A leak test is to be performed proving the

cylinder is tight.

7.4.11 Coordinate and conduct a final functional

test demonstrating satisfactory operation of the fixed gas firefighting systems in the presence of OMT REP and ABS.

7.4.12 Upon completion of all inspections, tests

and repairs return the Firefighting Systems to a ready for service condition. Conduct a final walk around survey with the ships Master and OMT REP to verify status.

7.5 Submit a completion/trip report.

7.6 Manufacturer’s Representative:

7.6.1 This work item requires maintenance and

repair actions to be performed on a MSC ship critical safety item. Only fire extinguishing system service companies certified and recognized as an ABS Recognized Service Supplier shall be used. To include oversight of all aspects of equipment inspection, removal, disassembly, reassembly, repairs, modifications, reinstallation, and testing as applicable. In addition, only OEM authorized parts will be used.

7.6.2 It is critical that all persons working on

the system must be certified and fully knowledgeable in its operation and repair.

Persons in training to be certified are permitted to perform maintenance and recharging of extinguishing systems under the direct supervision and in the immediate presence of a certified person.

SO-26-001-5

8.0 GENERAL REQUIREMENTS: None Additional

7.4.1 Inspect all piping, controls, actuators, remote pulls, valves, time delays, pressure switches, sirens and alarms, extinguishing agent, expelling means and physical condition to verify the system is in good order.
7.6.2 It is critical that all persons working on the system must be certified and fully knowledgeable in its operation and repair. Persons in training to be certified are permitted to perform maintenance and recharging of extinguishing systems under t...