SOW - Scissor Lift - 3 Aug 2026.pdf
PDF 148 KB Posted
- Attached to
- JBMDL Post Office Dock Scissor Lift
- Solicitation number
- FA448426Q0044
About this file
This is a Statement of Work (SOW) for the installation of a scissor dock lift with controller at the United States Postal Service Center located at 2907 Tuskegee Airmen Ave, Joint Base McGuire-Dix-Lakehurst (JB MDL), New Jersey.
The contractor shall provide all labor, materials, tools, and equipment to remove the existing scissor dock lift and controller and install new equipment on the existing concrete dock platform. The new lift specifications include a 72" width by 120" length platform with 64 5/8" usable width, raised height of 68" plus 2", lowered height of 8", 5,000 lbs capacity, 460-volt 3-phase motor requiring 240v A/C power on a dedicated 60 Hz circuit, removable handrails with 4" non-removable toe boards, roll ends with chains and handles, and draw bridges on both ends. The contractor is responsible for delivery, installation, and operation of the new lift; connecting the controller to the existing electrical power supply; obtaining all necessary permits and inspections to ensure compliance with local building codes; removing the old lift and restoring the site to original condition; disposing of hazardous fluids and waste in accordance with the Resource Conservation and Recovery Act (RCRA) and New Jersey Department of Environmental Protection regulations; repairing any damaged adjacent areas; and maintaining a clean work site. All work must comply with Federal, state, and local laws and regulations, including NEC, NFPA, BOCA, CABO, and OSHA codes. The performance period is 90 business days from award plus any lead-time for materials. A site visit is scheduled, and a final inspection will be conducted upon completion. The contractor must obtain base entry passes for all employees prior to commencing work at the McGuire Welcome Center. The Project Manager/Supervisor point of contact is Lynn Batchelor at 609-562-5801, lynn.batchelor@us.af.mil.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
INSTALLATION OF SCISSOR DOCK LIFT W/CONTROLLER
AT
2907 TUSKEGEE AIRMEN AVE, JB MDL, NEW JERSEY
1. DESCRIPTION OF SERVICES:
1.1. The contractor shall provide all labor, materials, tools and equipment to remove old scissor dock lift and controller from premises and install a new controller and scissor dock lift on the existing dock platform of the Postal Service Center located at 2907 Tuskegee Airmen Ave, JB MDL, NJ
1.2. Lift specifications
- Overall platform size: 72” width x “120” length
– Usable width 64 5/8”
– Roll end with chains and handles
- Raised height 68” + 2”
- Lowered height: 8”
- Removable handrails and 4” non removable toe boards
- 45”H w/21” mid rail
- Power A/C – 240v
- Motor Voltage: 460
- Capacity: 5,000 lbs
- Dedicated circuit required 60 Hz
- Motor phase: 3
- Draw bridge on both ends of lift table
2. TECHNICAL REQUIREMENTS:
2.1. The contractor shall provide all labor, materials, equipment, and supervision necessary to complete the installation of the lift and controller.
2.2. The contractor shall be responsible for the delivery, installation, and operation of the new lift.
2.3. The equipment shall be installed on the existing
concrete dock.
2.4. The contractor shall connect the controller to the
existing electrical power supply used by the old lift.
2.5. The contractor shall be responsible for obtaining any
necessary permits and inspections to ensure that the installation meets local building codes.
2.6. The contractor shall be responsible for removing the
previous lift from the premises and restoring the site to its original condition upon completion of the project.
2.7. Contractor will dispose of hazardous fluid and waste
in accordance with Resource Conversation and Recovery Act (FCRA) and NJ Department of Environmental Protection regulations.
2.8. Any adjacent areas dissembled, damaged, or removed by
the contractor during installation shall be properly repaired by the contractor at no expense to the Government.
All debris/trash generated by this project shall be removed and properly disposed of off base by the contractor. The contractor or his representative shall be on site during duty hours or the hours of work being accomplished. The contractor shall coordinate the time that work will be accomplished with the points of contact listed below. The contractor shall be responsible for daily clean up at the work site and complete restoration of the area after completion of the work. All work shall be accomplished in accordance with all Federal, state, and local laws and regulations, applicable building codes and standards, NEC, NFPA, BOCA, & CABO, and OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) codes.
3. Site Visit: A site visit is scheduled for ___________ at 1000hrs Bldg. 2907 and it is highly encourage that contractor to attend.
4. SPECIAL REQUIREMENTS: The work site shall remain clean and clutter free since this area is an active employment site.
5. POINTS OF CONTACT:
Please copy POC’s listed with all correspondences.
- Project Manager/Supervisor POC:
Lynn Batchelor 609 562 5801, lynn.batchelor@us.af.mil
- Contracting Officer: ______________________________
The Contractor Manager or an alternate shall be available with 24 hour notice during normal duty hours, 9:00am to 4:00 pm, to meet with Government personnel to discuss any problems encountered at the work site. Contractor will supply Government Quality Assurance Personnel (QAP) with phone number for contacting purposes.
6. BASE ENTRY: The contractor shall obtain the necessary passes and /or identification for entry into Joint Base McGuire Dix Lakehurst for all employees prior to commencement of work.
The Government reserves the right to refuse to issue an entrance pass to any employee for any reason deemed valid by the Government. The contractor shall be required to provide the Security Forces with vehicle registration(s), proof(s) of insurance, driver license(s), and a picture ID(s) to obtain a pass for entry onto the base. The Pass and Registration building is located at the McGuire Welcome Center, 3021 McGuire Blvd. JB-MDL, McGuire, N.J.
7. SECURITY FORCE AND FIRE PROTECTION:
USE 911 TO REPORT ALL EMERGENCIES (POLICE, FIRE, and EMS)
The Base Security Police Non-Emergency telephone number is 609-562- 6001.
8. PERFORMANCE PERIOD: All work shall be completed within 90 business days from award plus any lead-time for materials.
8.1. INSPECTION/ACCEPTANCE OF PROJECT COMPLETION: A final
inspection shall be scheduled upon completion of all work.
Contact the POC above for a site visit.
mailto:lynn.batchelor@us.af.mil
| 1. DESCRIPTION OF SERVICES: |
| 1.1. The contractor shall provide all labor, materials, tools and equipment to remove old scissor dock lift and controller from premises and install a new controller and scissor dock lift on the existing dock platform of the Postal Service Center loca... |
| 1.2. Lift specifications |
| - Overall platform size: 72” width x “120” length |
| – Usable width 64 5/8” |
| – Roll end with chains and handles |
| - Raised height 68” + 2” |
| - Lowered height: 8” |
| - Removable handrails and 4” non removable toe boards |
| - 45”H w/21” mid rail |
| - Power A/C – 240v |
| - Motor Voltage: 460 |
| - Capacity: 5,000 lbs |
| - Dedicated circuit required 60 Hz |
| - Motor phase: 3 |
| - Draw bridge on both ends of lift table |
| 2. TECHNICAL REQUIREMENTS: |
| 2.1. The contractor shall provide all labor, materials, equipment, and supervision necessary to complete the installation of the lift and controller. |
| 2.2. The contractor shall be responsible for the delivery, installation, and operation of the new lift. |
| 2.3. The equipment shall be installed on the existing concrete dock. |
| 2.4. The contractor shall connect the controller to the existing electrical power supply used by the old lift. |
| 2.5. The contractor shall be responsible for obtaining any necessary permits and inspections to ensure that the installation meets local building codes. |
| 2.6. The contractor shall be responsible for removing the previous lift from the premises and restoring the site to its original condition upon completion of the project. |
| 2.7. Contractor will dispose of hazardous fluid and waste in accordance with Resource Conversation and Recovery Act (FCRA) and NJ Department of Environmental Protection regulations. |
| 2.8. Any adjacent areas dissembled, damaged, or removed by the contractor during installation shall be properly repaired by the contractor at no expense to the Government. All debris/trash generated by this project shall be removed and properly dispo... |
| 3. Site Visit: A site visit is scheduled for ___________ at 1000hrs Bldg. 2907 and it is highly encourage that contractor to attend. |
| 4. SPECIAL REQUIREMENTS: The work site shall remain clean and clutter free since this area is an active employment site. |
| 5. POINTS OF CONTACT: |
| 6. BASE ENTRY: The contractor shall obtain the necessary passes and /or identification for entry into Joint Base McGuire Dix Lakehurst for all employees prior to commencement of work. The Government reserves the right to refuse to issue an entrance p... |
| 7. SECURITY FORCE AND FIRE PROTECTION: |
| 8. PERFORMANCE PERIOD: All work shall be completed within 90 business days from award plus any lead-time for materials. |
| 8.1. INSPECTION/ACCEPTANCE OF PROJECT COMPLETION: A final inspection shall be scheduled upon completion of all work. Contact the POC above for a site visit. |