SOW Sand Key BOATHOUSE REPLACE.pdf
PDF 148 KB Posted
- Attached to
- USCG Station Sand Key Boat House Replacement
- Solicitation number
- 30321PR250000005
About this file
This is a Scope of Work (SOW) for the replacement of the Boat House at Coast Guard Station Sand Key in Clearwater, Florida. The project involves constructing a 20' x 25' x 14' Garage/Workshop with a 10' x 18' x 11.33' Lean-To, including horizontal sheeting, a vertical roof with 6" overhang, heavy-duty 26-gauge roof sheeting, a 6' x 10' lockable roll-up door, a 36" x 80" walk door, and asphalt anchors. The solicitation is a Small Business Set-Aside with Solicitation Number 30321PR250000005, using simplified acquisition procedures.
Key details include a quote submission deadline of 30 April 2025 at 3 p.m. EST, with an anticipated award date of 10 business days after the solicitation closes (OOA 10 May 2025). Quotes should be submitted via email to angel.melendez@uscg.mil or mailed to the Commanding Officer USCG Base Miami Beach. The contract will be awarded on a best-value basis, considering cost, past performance, and the vendor's ability to provide all required labor, materials, and equipment. A site visit is recommended and scheduled for 23 April 2025 at 9:00 AM EST, with coordination through MKC Steve Dunn or BMC James E. Pinto.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Synopsis Solicitation STA Sand Key Boat House.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
1. GENERAL REQUIREMENTS: The work consists of providing all supervision, labor, materials, and equipment as required to: replace Station Sand Key’s Boat House
All above work is located at Coast Guard Station Sand Key, 1375 Gulf Blvd, Clearwater
FL, 33767.
2. COMMENCEMENT AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT ten (5) days after notice to proceed.
3. SCOPE OF WORK:
• 20' x 25' x 14' Garage/Workshop
• Full Side With Horizontal Sheeting
• Gable Only With Horizontal Sheeting
• Gable Only With Horizontal Sheeting
• Upgraded Vertical Roof With 6" Overhang (Vertical Roof Includes Hat Channels
& Ridge Cap)
• Heavy Duty 26 Gauge Roof Sheeting
• 10' x 18' x 11.33' Lean-To (2/12 Pitch Roof)
• Full Side With Horizontal Sheeting
• Full End With Horizontal Sheeting
• Full End With Horizontal Sheeting
• Upgraded Vertical Roof With 6" Overhang
• 6' x 10' Certified Heavy Duty Lockable Roll Up Door
• Header Seal for Roll Up Door
• Heavy Duty Walk Door With Keyed Lock - 36" x 80" Certified (Solid) (Installed on side of building)
• Asphalt Anchors
• Additional 3 x 26 Panel - Building will be sheeted on 1 Side Only
• Fee to Connect Lean-To To Main Building
• Certified Building
• As Built Stamped Drawings (4 Copies)
4. SITE VISIT: All bidders are strongly encouraged to visit the site to verify any/all quantities before submitting bids. Interested parties shall coordinate site visits with MKC Steve Dunn @
(386) 956-3804 / Steven.c.dunn@uscg.mil or BMC James E. Pinto @ (352) 346-4215/ james.e.pinto@uscg.mil.
5. DESIGNATED CONTRACTING OFFICER’S QUALITY ASSURANCE
EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of Contact for this project is MKC Steve Dunn @ (386) 956-3804 / Steven.C.Dunn@uscg.mil.
6. CONDITIONS AFFECTING THE WORK: The contractor should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.
7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of the intended start date. The work shall be done in accordance with the specification.
8. ORAL MODIFICATION: No oral statements of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.
9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.
10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.
11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.
12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the unit’s regular hours (0730-1600), they must submit their request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the Government for inspecting the work in progress.
13. UPON COMPLETION OF WORK: Contact the Contracting Officer’s QAE Representative to arrange for inspection/acceptance of work.
14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. The CG Sector St Petersburg Command Security Officer LT Blaine O’Reilly (757) 398-6336 / Blaine.A.OReilly@uscg.mil will be given a copy of the employee list to grant or deny access onto the installation. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.
15. SAFETY REQUIREMENTS:
1. Responsibilities:
a. All contractors working on USCG Facilities shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series), 29 CFR 1925 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Safety Officer prior to starting work.
b. Written notification must be provided to the CG Sector St. Petersburg’s Assistant Safety Officer, CWO Justin David @ (619) 788-7170 in their capacity as Fire Marshal of any activity that could potentially cause fire or explosion or those changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the unit, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification if the outsource review sheet is signed by Safety Officer.
c. Copies of the following must be provided to the Safety Officer, prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits.
Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work.
d. Lock Out/Tag Out requires notification and coordination with facilities engineering and will not be conducted by a contractor on Coast Guard Facilities. A Facilities Division representative is required for all contractors Lock Out/Tag Out needs.
2. Rights:
a. Every employee working on CG Facilities has the right to a safe and healthy workplace. The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.
16. ENVIRONMENTAL PROTECTION REQUIREMENTS:
a. All contractors working on USCG Station Sand Key facilities shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist Mr. Keith McDonald @ 727-502-8705 / keith.r.mcdonald@uscg.mil prior to starting work and must be in accordance with the Unit Environmental Guide.
b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on CG Davis Island Facilities. Some examples of qualifying activities are any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.
c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.
d. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.
| 1. GENERAL REQUIREMENTS: The work consists of providing all supervision, labor, materials, and equipment as required to: replace Station Sand Key’s Boat House |
| All above work is located at Coast Guard Station Sand Key, 1375 Gulf Blvd, Clearwater FL, 33767. |
File details come from the government source that posted it. Updated .