This Statement of Work (SOW) from the National Institute of Standards and Technology (NIST) details the procurement of one RFSoC ZCU216 evaluation kit for the Applied Physics Division's Advanced Microwave Photonics Group. The specific requirement is for a new ZCU216 Evaluation Board (part number EK-U1-ZCU216-V1-G) that is compatible with the open-source software QICK, to be used for complex qubit and resonator measurements at ultra-low temperatures.
The procurement includes specific delivery and payment terms, with delivery to NIST in Boulder, CO within 8 weeks after receipt of order (ARO). The contractor must provide a system with all new components, shipped in original manufacturer's packaging, and will be required to warranty the entire system for a minimum of 2 years. Payment will be 100% upon order, with Net 30-day payment terms, and the government reserves the right to conduct quality assurance testing to confirm the equipment meets manufacturer and government performance specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised RFQ Unrestricted LPTA.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK/REQUIREMENTS DOCUMENT
Title: Open-source RFSOC for superconducting qubit control and readout Requesting Lab: PML, Applied Physics Division, group 05
I. BACKGROUND INFORMATION
The Advanced Microwave Photonics Group performs complex qubit and resonator measurement at ultra-low temperature. Current projects involve high-throughput measurements of device quantum coherence and include the development of standard practices for such measurement will the goal to disseminate these standard practices to the community, which is a core NIST mission. Such dissemination requires the use of control electronics with large number of channels, direct synthesis in the 4-8GHz band, compatibility with the open-source software QICK, and can be widely adopted by the research community. Currently, the only platform meeting these needs is the RFSoC
ZCU216.
Purpose/Objective: Acquisition of an RFSoC ZCU216 evaluation kit.
II. SCOPE
The contractor shall deliver one RFSoC ZCU216 evaluation kit, part number EK-U1-ZCU216-V1- G.
III. MINIMUM REQUIREMENTS
The Contractor shall provide a system that meets all technical specifications identified below. All items must be new. Used or remanufactured equipment will not be considered for award.
Experimental, prototype, or custom items will not be considered. The use of “gray market” components are not authorized for sale in the U.S. by the Contractor is not acceptable. All line items shall be shipped in the original manufacturer’s packaging and include all original documentation and software, when applicable.
Line Item 0001: RFSoC ZCU216 evaluation kit Description: RFSoC ZCU216 evaluation kit Quantity: 1
A. Technical Specifications
a. ZCU216 Evaluation Board: the technical proposal shall include a RFSoC ZCU216 evaluation kit, part number EK-U1-ZCU216-V1-G.
b. Board must be compatible with the open source software QICK
IV. DELIVERABLES
Description Quantity or Format Due Date
RFSoC ZCU216 evaluation kit 1 8 weeks ARO
V. PLACE OF PERFORMANCE
NIST
VI. DELIVERY TERMS
Delivery shall be F.O.B Destination and shall occur in accordance with the delivery due dates provided in the above table.
FOB Destination means: The contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for any loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order; and pay all charges to the specified point of delivery. The contractor shall deliver all
Line Items to:
National Institute of Standards and Technology NIST/PML/Applied Physics 325 Broadway MS 686.05 Attn Florent Lecocq Boulder CO, 80305
***Due to ongoing limited site access of the NIST facilities, the Awardee SHALL confirm with the Designated Government Official and the Contracting Officer prior to ANY shipment to NIST***
VII. INSPECTION & ACCEPTANCE
In addition to the inspection and acceptance terms articulated in 52.212-4, the Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.
NIST may choose at its discretion to forego this part of acceptance testing.
A visual inspection of the equipment will be performed by the NIST TPOC to identify surface defects or any form of indication that any equipment was damaged during transport to NIST. The Government shall have sole discretion to require repair or replacement of damaged and/or nonconforming supplies at no cost to the Government. The Government at any time prior to acceptance shall reject the equipment due to defects and/or nonconformance. The vendor is responsible for latent defects discovered any time after final inspection. However, the extent of its liability shall be prorated over the useful life of the equipment.
Ownership of the equipment shall transfer to NIST upon acceptance by the Government.
The Government will test, inspect, and accept or reject the equipment within (insert working days it will take to inspect, accept or reject) of the receipt of the equipment unless otherwise indicated above. The Government reserves the right to conduct quality assurance testing to confirm that a given instrument(s) meets the manufacturer’s and/or the Government’s performance specifications. It is anticipated that the equipment will meet all manufacturer’s specifications and/or the Government’s performance specifications identified in the most recent operations and maintenance manual for each piece of equipment and/or in this document.
VIII. WARRANTY
The contractor shall warranty the entire system for a period of a minimum of 2 years after receipt of the equipment and shall be in accordance with terms in FAR 52.212-4. Warranty shall commence upon acceptance of the system by the Government and at a minimum shall include the following:
IX. PAYMENT SCHEDULE
The Contractor must invoice in arrears according to the payment schedule. The Contractor shall be paid, in accordance with Net 30-day payment terms, upon receipt and acceptance of a proper invoice, in accordance with the following schedule:
1. 100% upon order
NOTE: Partial shipments and partial invoices will not be accepted, unless otherwise requested and accepted by the Contracting Officer prior to award offer. Proposed payment schedules shall be submitted with vendor’s response to the RFQ for consideration.