OJ-830(V)2 W/ ORDALT TCC(V)2 MIL-STD-901E HEAVY WEIGHT SHOCK
TESTING
STATEMENT OF WORK (SOW)
1.0 SCOPE
The Naval Surface Warfare Center, Dahlgren Division Dam Neck Activity (NSWCDD DNA) requires heavy weight shock testing for a single asset to meet Grade A/B shock. The test will run utilizing the same barge and testing infrastructure.
2.0 APPLICABLE DOCUMENTS
2.1 MIL-DTL-901E; Shock Tests, H.I. (High-Impact) Shipboard Machinery, Equipment, and
Systems, Requirements for 20 June 2017
3.0 REQUIREMENTS
3.1 The Contractor shall conduct a heavyweight shock test in accordance with MIL-DTL-
901E for the Government Furnished Equipment/Materials (GFE/M) listed in Section 5 of this
SOW. The contractor shall meet the following additional requirements under this SOW:
3.1.1 Design and build mounting fixtures for the subject testing 1 item, in accordance with
Section 2.1.
3.1.2 Offload and install equipment onto the test fixture and prepare for testing.
3.1.3 Provide all power to units under test in accordance with Section 2.1.
3.1.4 Provide no less than nine (9) channels for instrumentation on customer equipment.
3.1.5 Provide instrumentation to monitor and verify test inputs to the Floating Shock Platform
(FSP) and to the units under test.
3.1.6 Conduct 4 shot Barge test at 14 & 25 Hz to requalify unit after design changes
3.1.7 Remove and repackage units under test after testing is complete.
3.1.8 Provide a Contingency Fee line item in the quote for 15% of the total contract.
3.2 The contractor shall coordinate with the technical point of contact listed in Section 6.0 below to schedule the shipment of all Government Furnished Equipment/Materials (GFE/M) and work to be performed under this statement of work. Work shall begin no later than fourteen (14) calendar days after award of contract. The contractor shall start testing within sixty (60) calendar
5.3 The Government will provide all miscellaneous test item equipment, interconnecting cables, operational and checkout hardware.
6.0 TECHNICAL POINT OF CONTACT (TPOC)
Provided upon award.