SOW Replace Refrigeration System at Lindemann.docx
DOCX document 31 KB Posted
- Solicitation number
- BD-22-1022-DMH06-6420A-65316
- Issued by
- Suffolk County, Massachusetts
About this file
This document is a Scope of Work (SOW) for a project to replace the refrigeration system for two walk-in freezers at the Erich Lindemann Mental Health Center in Boston, Massachusetts. The project, numbered FY22-012, has an estimated total cost of $18,000 with $12,000 in labor and $6,000 in materials and equipment. The Awarding Entity is the Massachusetts Department of Mental Health. The project requires the contractor to supply and install a new 2.5 hp low temperature refrigeration split-feed system for the existing two walk-in freezers, including new fan units. The project has a planned start date of August 30, 2021 and a final completion date of August 31, 2021.
The SOW provides details on the required licenses and certifications, warranties, and required forms to be submitted with the bid, including a Certificate of Insurance and Prevailing Wage Rate Requirements. The contract opportunity is listed as having a State ID of 65a95d78d947088ac30981f7 for the state of Massachusetts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PW 2021-7-7 GRO35~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK Project # FY22-012
Scope of Work Statement MGL Chapter 149 Projects: With Labor Costs of $10,000 to $49,999
AWARDING ENTITY
Awarding Entity: DMH
Agency Name and Address: Erich Lindemann MHC 25 Staniford Street Boston, MA 02114
Project Number: FY22-012
Estimated Total Cost: $18,000
· Estimated Labor = $12,000
· Estimated Materials & Equipment = $6,000
CONTACT INFORMATION
Name and Title: Mark Smith - Mechanical Engineer Phone: 617-626-8850 Email Address: mark.f.smith@state.ma.us
CONTRACT AND BIDDING INFORMATION
Project Name: Install Refrigeration System for Walk-in Freezers @ Erich Lindemann MHC
Project Description (brief overview): The current two walk-in freezers at the Lindemann are no longer functional due to a broken refrigeration system. Contractor to supply and install a new 2.5 hp low temperature refrigeration split-feed system for the existing two walk-in freezers. A new fan unit will be installed in each of the walk-in freezers. Connections to be made to the existing electrical & plumbing.
Bid Sets Available (place, date and time): N/A Pre-Bid Conference Walk-Thru (place, date and time): Erich Lindemann MHC, 25 Staniford St. Boston, MA 02114 Thursday 8/12/21 at 10am Bid Deadline: Thursday 8/19/21 at 10am OSD Trade Category: Food Service & Equipment: GRO35
Additional Information: Warranties: 1 year parts and labor and additional 4 year compressor part only
DETAILED SCOPE OF WORK
Provide detailed scope of work of sufficient detail to bid on the project. Provide additional drawings, sketches, notes or specifications as needed and check he appropriate boxes below.
· Drawings or sketches attached
· Notes or specification attached
· Other attachment, if so, indicate:
PROJECT SCHEDULE
Planned Start Date: 8/30/21
Contract Duration until Substantial Completion: N/A
Contract Duration until Final Completion: 8/31/21
ATTACHMENTS
The following sections are included in the appendices and are part of this contract:
· Instruction to Bidders
· Owner-Contractor Agreement
· General Conditions of the Contract
· Supplemental Conditions of the Contract X Prevailing Wage Rate Requirements
FORMS
It is the responsibility of the awarding entity to ensure that they obtain the required licenses/certifications from all workers who will be assisting with the work. The following forms are to be completed and submitted with the bid:
· Form for General Bid
· Required Licenses /Certificates X Certificate of Insurance
· Certificate of Non-Collusion
· Contractor Authorized Signatory Form
· Payment Bond and Performance Bond
· 50% payment bond if total contract is >$25,000
· OSHA Certificates for all employees
Scope of Work Statement Page 2 of 2