This statement of work outlines requirements for repairs to heating equipment at a USDA research facility in Byron, Georgia. The contractor will demolish and dispose of two hot water pumps, one expansion tank, four unit heaters, and one radiant heater. They will also demolish and dispose of twenty-four unit heaters. The contractor must install replacement equipment of the specified models and series. All work must be completed in accordance with local, state and federal codes and regulations as well as USDA facility design standards. The contractor is responsible for site visits, safety compliance, and minimizing impacts to facility operations. The project schedule must not exceed 180 days from notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Recommended Equipment Replacement.docx | DOCX document | |
| Service Provisions 1106492.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Repair West Headhouse Unit Heaters & Expansion Tank
Southeastern Fruit and Tree Nut Research Laboratory 21 Dunbar Rd., Byron, GA 31008
Byron, GA
Prepared by:
Everett Wilson
11JUL23
Statement of Work:
Contractor shall furnish all labor, materials, and supplies to perform the following work for USDA, ARS, SEFTNRL, 21 Dunbar Road, Byron, Georgia 31008
To ensure limited interruption of lab research all work will be coordinated with the Lab personnel.
The Contractor shall:
• Demo and dispose of two hot water pumps
• Install two new B&G model and series listed on separate document for equivalency.
• Demo and dispose of current expansion tank
• Install new Taco model and series listed on separate document for equivalency.
• Demo and dispose of four Carrier unit heaters
• Install four new Modine model and series listed on separate document for equivalency.
• Demo and dispose of one radiant heater
• Install new radiant heater model and series listed on separate document for equivalency. This
• Demo and dispose of twenty‐four Trane unit heaters
• Install twenty‐four Trane model and series listed on separate document for equivalency.
All work shall be completed in accordance with all local, state, and federal codes and regulations. All work shall also meet the requirements of the ARS Facilities and Design Standards (P&P 242.1). The P&P 242.1 document can be found at: http://www.afm.ars.usda.gov/ppweb/PDF/242‐01M.pdf.
All work shall be accomplished in a professional manner and in accordance with good workmanship and acceptable practice.
Contractor is responsible for inspecting the site and for determining the exact requirements of the project.
Contractor’s working hours shall be scheduled to coincide with the normal working hours (7am‐4pm) at the site. Should it be necessary to schedule working hours other than normal working hours, contractor shall arrange for access to the work area with the Contracting Officer’s Representative (COR) at the site at least three days prior to the need.
Site Visit:
Bidders are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for observing firsthand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.
Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid.
Registration can be obtained through: https://www.sam.gov/portal/public/SAM/
Safety: The contractor is responsible for complying with all local, state and federal safety codes and laws.
Detailed Bid: The proposal will have the cost for all First Floor Labs detailed out by lab. The proposal will have the Second Floor Labs detailed out by lab and shall be presented as options on a lab‐by‐lab basis. Provide all materials, labor, and equipment to fully and successfully complete the Statement of Work described in this document. The detailed bid shall be presented in a MS Excel spreadsheet that is fully functional with formulas intact for ARS analysis of the bid. The proposal shall be submitted in MS Word. Neither type of documents will be password projected. Contractor has option of additionally submitting their proposal in .pdf format for fidelity purposes should they desire to do so but any Bid Proposal will not be accepted for review until it’s presented in MS Excel and MS Word format.
Contractor Responsibility:
The project has a base bid to be performed per the following specifications:
1. Contractor will verify all equipment, dimensions and existing site conditions covered in their report.
2. Contractor is required to manage the project and consult with the Government prior to beginning all work phases. And, to work in a manner that minimizes the impact of the work on Government operations, research, and functions.
3. All work must be performed in such a manner as to not adversely affect daily operations of the facility, its workers, and the onsite facility operations.
Material / Submittals:
The AE firm shall submit a draft of their report for review and comment to the Lab personnel, the EPM and the Contracting officer for a period of 10 business days. Upon review, incorporation of ARS comments, and approval by ARS personnel, the final version of the report shall be issued.
Installation Procedure:
Contractor will verify all dimensions and site conditions prior to beginning work. Contractor will schedule the work between working hours as listed below. Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor. The contractor shall be responsible for protecting his work at all times and ensuring the safety of his crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.
Project Schedule:
The completion of this project shall not exceed 180 days from date of notice to proceed. A request for time extension must be submitted to the Contracting Specialist in writing. Each request must include specific and detailed reasons in support of the schedule alteration.
Work Hours:
Contractor work hours shall be Monday through Friday, seven (7) A.M. to four (4) P.M. except for Government holidays or as otherwise arranged with the site personnel in advance.