SOW Repair Generac 200KW Generator - Baton Rouge LA.docx

DOCX document 38 KB Posted

Attached to
Generac Generator Repair Federal contract opportunity
Solicitation number
12405B25Q0019
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery

About this file

This document is a Statement of Work (SOW) for the repair of a 200KW Generac generator located at the Honeybee Breeding, Genetics & Physiology Lab in Baton Rouge, Louisiana. The contractor shall provide all services necessary to completely repair the generator, including changing the oil, gaskets, hoses, starting batteries, starting motor, and exhaust system components as needed. The government will provide electricity and water for the project. The contract period is 30 calendar days, and the contractor must adhere to safety, cleanup, and disposal requirements.

The related federal contract opportunity is a Combined Synopsis/Solicitation (Solicitation Number: 12405B25Q0019) for the Generac Generator Repair. The government is looking for a contractor to provide the required repair services. Quotes must be submitted by November 21, 2024 at 4:00 PM Central Time, and the award will be made based on best value to the government, considering technical specifications and price. The NAICS code is 335312 (Motor and Generator Manufacturing) with a small business size standard of 1,250 employees.

View the file

Other files for this federal contract opportunity

Other files attached to Generac Generator Repair, newest first.
File Type Posted
Answers to Questions 1.docx DOCX document
SAM.Gov combined Synopsis Solicitation.docx DOCX document
Clauses FAC 2025-07 eff. 11-12-24 under $250k (Solicitation).pdf PDF
12405B25Q0019.pdf PDF
SAM Wage Determination.pdf PDF
SAM.Gov combined Synopsis Solicitation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture Agricultural Research Service

STATEMENT OF WORK

Repair Generac 200KW Generator

Honeybee Breeding, Genetics & Physiology Lab 1157 Ben Hur Rd.

Baton Rouge, LA 70820

PROJECT:

The Contractor shall provide all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with requirements as described herein.

Completely repair 200KW Generac Generator by changing the oil, gaskets, hoses, starting batteries, starting motor, and exhaust system components at a minimum as needed.

The Base Bid shall include all work described.

Government Furnished Equipment\Services:

The Government will furnish a reasonable amount of electricity and water.

GENERAL REQUIREMENTS:

The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense to pre-damaged condition to the satisfaction of the COR.

Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities of the protection and security.

Provide continuous noise and dust abatement as required to prevent disturbance and nuisance to the public and workers and to the occupants of adjacent premises and surrounding areas. Dampen or cover areas affected by demolition operations as necessary to prevent dust nuisance.

The Contract Documents may not represent all surface conditions at the site and adjoining areas. The known surface conditions are as indicated and shall be compared with actual conditions before commencement of work and the cost shall be included in the contractor’s proposal.

Disposal of Removed Materials and Debris:

Dispose of materials, waste, trash, and debris in a safe, acceptable manner, in accordance with applicable laws and ordinances and as prescribed by authorities having jurisdiction.

Cleanup:

The construction site shall be always kept clean and free of debris. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR.

Final Payment/Contract Closeout:

The following documents are REQUIRED PRIOR TO FINAL PAYMENT (other documents may also be required):

1. Release of liens.

1. Employee payroll\time sheets

1. Invoice

PROJECT SCHEDULE: The Contract time for this project is 30 calendar days.

image1.png

File details come from the government source that posted it. Updated .