SOW - REPAIR B5024 - Life Safety.pdf
PDF 337 KB Posted
- Attached to
- Add Hallway to Building 5024 - Scott AFB
- Solicitation number
- W50S7S22Q0015
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sign in Sheet_Redacted.pdf | ||
| W50S7S22Q0015 1442.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ILLINOIS AIR NATIONAL GUARD
126th Civil Engineer Squadron 146 Air Guard Way
Scott AFB, IL 62225-5503
13 July 2022
Project #: VDYD222004 Page 1 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022 126 Air Refueling Wing - Scott AFB, IL
MEMORANDUM FOR: 126 MSG/MSC
FROM: 126 CES
SUBJECT: STATEMENT OF WORK
PROJECT NO.: VDYD222004
PROJECT TITLE: REPAIR, Bldg 5024 – Life Safety PROJECT LOCATION: 126th Air Refueling Wing, Scott AFB, Illinois, 62225
JURISDICTIONS
The Project Work Site, Scott Air Force Base, 126th Air National Guard (Scott AFB IL ANG), is a U.S. military installation and as such, all aspects of the work on the site shall be subject to the requirements herein. The Contractor shall coordinate all activities for compliance with these requirements through the Contracting Officer’s Representative (COR).
1) DESCRIPTION OF WORK: The work consists of furnishing all labor, materials and equipment necessary to alleviate several fire department write-ups and one life safety issue within the existing 126ARW fuel cell space. Currently, workers in the fuel cell have no way of getting to the existing bathrooms without passing through the public breakroom and office spaces creating a contamination issue. The contractor will need to cut a doorway in the existing CMU wall and provide necessary structural support to allow for a walkway to be created through the men’s locker room allowing workers access to the existing restrooms.
Below is a summary of the work required:
a) Install a doorway in the existing CMU wall with a new fire-rated door in the fuel cell bay and create a contained hallway constructed with CMU to allow members to reach both the female and male bathrooms.
b) Cut out a doorway into the existing ½ walls that are located within the janitors closet, Room 116.
c) All CMU block shall be painted to match the existing CMU walls in the building and be at the same fire rating as the surrounding walls. Contractor shall also install fire-rated ceiling tiles as needed. Install necessary lighting, HVAC (as needed) and fire suppression in the hallway in order to meet all AFI, UFC and NEC/NFPA codes.
A. The majority of the work is inside a controlled area (aircraft fuel cell). The Contractor will coordinate with the COR and CES to ensure there is an escort for the contractors while in the hangar.
Project #: VDYD222004 Page 2 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022
B. Contractor shall supply a schedule ahead of time to allow for maintenance to coordinate for a plane to not be in the fuel cell for extended periods of time.
C. Contractor shall have SOLE responsibility for accuracy of all measurements, estimates of material quantities and sizes, and site conditions that will affect the construction of this project. Below is a rough drawing of the work to be completed:
D. Contractor shall furnish and submit the following items:
a. Construction Schedule (Microsoft Project Compatible)
b. Material Submittals (Use Electronic AF3000)
c. Manufacturer's Information and Shop Drawings
d. Material Safety Data Sheets
2) CONSTRUCTION COORDINATION AND PHASING PLAN
A. The contractor shall minimize system down time or interruption of normal operations by coordinating work of the various trades to assure efficient and orderly sequence of installation of construction elements
B. Normal operations of the hangar will continue throughout the duration of the project.
Contractor must coordinate their project schedule with the COR at a minimum of 48 hours prior to construction in order to minimize the effect on normal operations.
Project #: VDYD222004 Page 3 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022
3) GENERAL CONTRACTOR INFORMATION
A. Omissions from the Drawing(s) or Statement of Work (SOW) or the inaccurate description of work details which are manifestly necessary to carry out the intent of the Drawing and SOW, or which are customarily performed, shall not relieve the Contractor from performing such omitted or inaccurately described work details, but they shall be performed as if fully and correctly set forth and described in the Drawing(s) and SOW at no additional cost to the Government.
B. The Contractor is responsible for the means and methods of all products and work. The
Government is paying the Contractor in the contract price to use its expertise to ensure the means and methods of all products in the project.
4) MATERIAL SUBMITTALS
• General Procedures: Contractor is required to submit all shop drawings, product data, and material submittals to the KO and COR. All hard material submittals shall be sent to the COR and the KO (1 Copy Each). All submittals shall be submitted to the COR/KO within 10 days after issue of the Notice To Proceed (NTP) or as directed by the KO.
A. Electronically deliver all submittals to KO and COR using the following email addresses:
KO: christopher.fisher.7@us.af.mil
COR: matthew.boice@us.af.mil
Prior to delivery, carefully review all submittals for compliance with Contract Document and for coordination purposes, and sign the submittal form as necessary.
B. Transmit each item listed on the AF Form 3000 - Schedule of Submittal Materials (PDF Format). Identify Project, Contractor, subcontractor, and major supplier; identify pertinent drawing sheet and detail number, and section number, as appropriate. Identify deviations from contract documents.
Contractor shall ensure that only one submittal item is listed on the material submittal form.
C. After review by the A/E, COR and the KO, the contractor shall revise and resubmit within 14 days. As required, identify changes made since previous submittal.
D. Distribute copies of reviewed submittals to concerned persons. Instruct recipients to promptly report any inability to comply with provisions.
E. Coordinate each submittal with requirements of work and contract documents.
F. Contractor’s responsibility for error and omissions in submittals is not relieved by Government’s review of submittals.
G. Contractor’s responsibility for deviations in submittals from contract document requirements is not relieved by KO’s review of submittals, unless KO gives written acceptance of specific deviations.
mailto:christopher.fisher.7@us.af.mil mailto:matthew.boice@us.af.mil
Project #: VDYD222004 Page 4 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022
H. Notify KO in writing at time of submission of deviations in submittals from contract document requirements.
I. Do not begin any work that requires submittals without KO’s stamp and signature indicating approval.
J. After KO’s review, make response required by KO’s stamp and distribute copies.
5) PRODUCT DATA
A. Collect product data into a single submittal for each element or system. Mark each copy to identify applicable products, models, options, and other data; supplement manufacturers’ standard data to provide information unique to work. Submit the number of copies Contractor requires, plus two copies, which will be retained by KO and COR. When product data includes information on several products, mark copies to indicate the following information:
1. Manufacturer's printed recommendations.
2. Compliance with recognized trade association standards.
3. Compliance with recognized testing agency standards.
4. Application of testing agency labels and seals.
5. Notation of dimensions verified by field measurement.
6. Notation of coordination requirements.
B. Submit manufacturer’s printed instructions for delivery, storage, assembly, installation, and start-up, adjusting, and finishing, for product data when required.
C. It is the intent of the KO to give the Contractor the widest possible latitude in the use of similar products of equal quality. When a brand name description or manufacturer is identified in the SOW, such identification is intended to be descriptive, but not restrictive, and is to indicate the quality and characteristics of the product that is satisfactory. The manufacturers that are listed are believed to provide acceptable products. This list is not all-inclusive and the Government is not warranting exclusive use of these products.
Contractor shall verify product is fit for purpose and complies.
D. In lieu of the label, the Contractor may submit written certification from any nationally recognized testing agency, adequately equipped and competent to perform such services.
E. The contractor shall maintain and provide quality control over suppliers, manufacturers, products, services, site conditions, and workmanship.
F. Work is to be performed by qualified persons. Comply with industry standards except when more restrictive tolerances or specified requirements indicate more rigid standards or more precise workmanship.
G. Comply with quality control, references, specifications, and manufacturer’s data. Products containing asbestos are prohibited on this project. Use only asbestos-free products that are environmentally acceptable.
H. Use products with personal protection. User must read container label and material safety data sheets prior to use.
Project #: VDYD222004 Page 5 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022
I. Required components to be supplied by Contractor in quantity shall be the same, and shall be interchangeable.
J. Materials used in this contract shall be, to the greatest extent practicable and consistent with financial prudence, made of recycled materials or with materials that are recyclable.
6) TRANSPORTATION, STORAGE AND HANDLING
A. Transport products by methods to avoid product damage; deliver in undamaged condition in manufacturer’s unopened containers or packaging, dry.
B. Provide equipment and personnel to handle products by methods to prevent soiling or damage.
C. Promptly inspect shipments to assure that products comply with requirements, quantities are correct, and products are undamaged.
D. Store products in accordance with manufacturer’s instructions. Maintain products within temperature and humidity ranges required by manufacturer’s instructions.
E. Arrange storage to provide access for inspection. Periodically inspect to assure products are undamaged, and are maintained under required conditions.
F. Do not re-use, recycle or dispose of material manufacturers product containers except in accordance with all applicable regulations. The user of manufactured products is responsible for proper use and disposal of product containers.
7) PRE-FINAL INSPECTION
• A pre-final inspection of the project shall be performed to compile a list of incomplete and nonconforming work and, if necessary, to help expedite project completion. The Contractor and the COR shall conduct the Pre-final inspection. This inspection shall be performed at a time agreed upon by the COR, the KO and the Contractor prior to completion of the work. Any items found to be deficient shall be addressed in the “Punch List” and completed to the satisfaction of the COR and the KO.
8) FINAL INSPECTION AND ACCEPTANCE
A. At 100% completion, the Contractor shall notify the KO that all work is complete and ready for inspection. The COR shall perform a walk through inspection of the project. A list of incomplete and nonconforming work shall be created (if required). If a list is not created, the COR shall notify the KO, in writing, of final inspection and acceptance by the Government. The KO will then notify the Contractor of such inspection and acceptance.
This inspection shall be performed NLT 7 days after work has been deemed complete by the contractor.
B. Cleaning shall be to the satisfaction of the COR and the KO. Any areas of work or adjacent areas disturbed shall be restored to original conditions.
a. Execute prior to notifying Government for a final inspection
b. Clean surfaces exposed to view; remove temporary labels, stains and foreign substances
Project #: VDYD222004 Page 6 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022
c. Clean site
d. Dispose of all waste, rubbish, and surplus materials off base appropriately
9) FINAL PAYMENT
• The KO shall not process final payment until all required documents are received and final inspection and acceptance is completed by the COR.
10) CLOSEOUT PROCEDURES
• When Contractor has determined that the work has reached final completion, (all Incomplete and Nonconforming Work list items resolved), the contractor shall submit written certification that ontract documents have been reviewed, work has been inspected, and that work is complete in accordance with contract documents and ready for KO’s inspection.
11) PROJECT RECORD DOCUMENTS
• Store complete set of documents on site separate from those used for construction.
• Keep documents current and available for inspection.
12) ENVIRONMENTAL REQUIREMENTS:
A. Contractor and any subcontractor, agent or representative shall comply with all applicable Federal, State, and local laws and regulations providing for environmental protection and pollution control and abatement including but not limited to the Clean Air Act, Clean Water Act, Resource Conservation and Recovery Act, Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Toxic Substances Control Act, Federal Insecticide Fungicide and Rodenticide Act, Coastal Zone Management Act, Endangered Species Act, National Historic Preservation Act, Safe Drinking Water Act, Emergency Planning and Community Right-to-Know Act, Oil Pollution Act, and Pollution Prevention Act. Contractor has the duty to determine for itself where such laws and regulations apply. Although the Contractor may request assistance from the KO in delineating applicable environmental laws and regulations. Contractor has an independent responsibility to make its own determination and to do so in a timely fashion.
B. Hazardous material spills: Spills shall be immediately contained, if possible, and reported to the COR. The COR will advise the Environmental Officer (EO).
C. The Contractor shall not discharge anything into the sanitary sewer system or storm sewer system without coordination and approval from COR who will coordinate with EO.
D. The EO may conduct inspections without notice at on-base work sites to ensure environmental compliance. Any items of non-compliance will be reported to the COR.
E. Fines or Penalties for Envornmental Non-Compliance:
The Contractor shall be responsible for paying any fines or penalties assessed against the Government for environmental violations resulting from acts or omissions of the Contractor or its employees, subcontractors, or agents. This obligation is in addition to any fines or penalties which may be assessed against the contractor for the same conduct.
Contractor may either reimburse these fines or penalties through the Contracting Officer, Project #: VDYD222004 Page 7 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022 or with the consent of EO, conveyed through the Contracting Officer, the Contractor may pay such fines or penalties directly to the regulatory agency or agencies concerned.
F. Contractor’s Liability for Environmental Damages:
Contractor agrees to hold harmless and indemnify the Government for any and all damages of any kind resulting from environmental violations by the contractor, contractor’s employees or agents or subcontractors. Damages include but are not limited to personal injury, property damage (including diminution of value), or death, environmental restoration and response costs, natural resource damages, expert witness and attorney’s fees, and reimbursement of any and all expenses incurred to obtain permits as a result of Contractor’s failure to identify or obtain permits.
G. Contacts with Environmental Regulatory Officials:
Contractor shall, through the COR and the KO, immediately advise installation environmental management function of the content of all contact with federal, state or local environmental regulators before, during and after the performance of this contract concerning the performance of this contract.
H. Asbestos:
Owner and Contractor agree to exonerate, indemnify, defend, and hold harmless material manufacturer from and against all claims, demands, lawsuits, damages, expenses and losses incurred by Contractor’s removal of asbestos-containing materials from Owner’s building and work site. Contractor must conduct its operations according to applicable requirements including but not limited to those established by:
i. Occupational Safety and Health Administration (OSHA);
ii. Environmental Protection Agency (EPA);
iii. State or Local Air Pollution Control Authorities/Agencies;
iv. State or Local Solid Waste or Hazardous Waste Authorities/Agencies;
v. State or Local health Department(s);
vi. State or Local Building Code Authorities;
vii. Other federal, state, or local agencies or authorities.
I. Contractor shall perform appropriate inspections, surveys and file timely notifications to proper authorities prior to starting demolition activities. Inspectors, project planners, project managers, contractors and workers involved in this project shall have appropriate training, licenses and registrations. Contractor shall be responsible for determining and implementing regulatory compliance activities, including but not limited to work practices, engineering controls, personal protection, air monitoring, testing, hazard communication, material handling, record retention, and arranging for waste disposal/handling.
J. Contractor must file a Uniform Hazardous Waste Manifest from proper landfill site for each load of asbestos containing material removed. Copies must be sent to Government
Project #: VDYD222004 Page 8 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022 and material manufacturer/specifier. Transportation of waste shall be in accordance with applicable Department of Transportation (DOT) requirements.
K. Hazardous Materials Usage
a. Contractor shall establish hazardous materials (HM) storage and distribution system when HM is to be used. All HM required to support this contract shall be reported to the Government using the Contractor HM Identification Form (183 FW Form 50, July 2001 (Part I)). This form will be provided to the contractor at the Pre-Construction meeting. Additional HM needed by the contractor shall be identified to the COR for approval.
b. Contractor planning to use HM for the work shall register with the installation Hazardous Material Pharmacy (HMP) prior to start of work in order to support the installation’s compliance with Executive Order 12856, Federal Compliance with Right-to-Know Laws and Pollution Prevention Requirements.
c. Contractor shall maintain a Contractor HM Identification form for all HM on the job site for inspection/verification.
d. COR will verify that the HM identified to the HMP is the only HM in use on the job site.
e. Contractor shall provide the following to the HMP:
L. A list of each material and quantity of material for all proposed HM shall be construed to mean any item that is:
a. A health hazard or physical hazard as defined in 29 CFR, §1910.1200.
b. Regulated in its disposal by EPA under 40 CFR.
c. Hazardous as defined by DOT regulations under 49 CFR.
d. Hazardous as defined by the Dangerous Goods Regulations of the International
Air Transport Association.
M. Provide material safety data sheets (MSDS) for each item on the HM list.
N. Unused materials shall be inventoried and removed from the ILANG installation prior to close-out of the contract or expiration date of the HM. Reports of materials delivered, used and removed from the installation shall be submitted monthly to the KO and prior to contract close-out.
O. Contractor shall accompany the COR and the installation Environmental manager (EM) on project close-out inspection to ensure all used and unused HM has been removed from the installation. This requirement shall not be a punch list item and must be accomplished prior to the government accepting beneficial occupancy of the facility or construction item (126th ARW Form 50, July 2001, (Part II)).
Project #: VDYD222004 Page 9 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022
P. Advise Government when volatile materials are to be used near air ventilation intakes so Government can use some or all of the following methods to minimize disruptions to building occupants and operations:
a. Divert air intake from work area by attaching scoops or temporary duct work.
b. Temporarily shut down or block air intakes.
c. Provide make-up air or intake air from sources away from work area.
13) SAFETY
Base and Safety Regulations:
1. These requirements are in addition to those referenced during the pre-construction conference.
2. The Contractor shall comply with all applicable provisions of Air Force regulations and directives pertaining to security, safety, fire, traffic, and personnel clearances insofar as they pertain to the Contractor’s activities on Scott AFB, IL.
3. The Contractor shall be responsible for providing, placing, and removing all barricades and safety devices during his construction activities.
In addition, the Contractor shall:
• Caution vehicle operators to avoid intrusion on the runway or flight line.
• Yield to all emergency vehicles including security police, fire department, ambulance, and ambulance buses when their red lights and/or sirens are operating.
• Coordinate movement of heavy/ oversized equipment such as cranes, extended flat bed trailers and large earth moving vehicles with the base security police and the COR.
• Provide personnel to direct traffic when Contractor operated vehicles block one or both lanes of a two-lane road.
• If a mishap involves injury or death to Contractor personnel and/or damage to Air Force property as a result of Contractor operation, the Contractor shall notify the Contracting Officer (KO) and COR. The COR will contact the Wing Safety Office on normal workdays or the Security Police at any other time. Any safety related problems encountered during the contract period should be reported to the COR who will advise Wing Safety. In case of life threatening emergency, dial 911 to reach the Security Police, Fire Department, or ambulance. Emergency treatment for serious or life-threatening injuries is available on Scott AFB, IL.
• The Contractor shall ensure compliance with contract and OSHA provisions.
Project #: VDYD222004 Page 10 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022
• Contractor will ensure all application, material handling, and associated equipment shall conform to and be operated in conformance with OSHA safety requirements.
• Site security to Scott AFB IL, Base facilities must be maintained at all times. FAA requirements state that approved temporary access openings are allowed to be opened only during the intended use times and closed during non-use. This will require the Contractor to place a temporary fence or roll back the removed fence netting across the access openings to the area as shown in the plans. The access opening will be closed during times when construction activities are not occurring and/or when access to this area is not required.
• United States Air Force Security has jurisdiction over all activities on or relevant to Scott AFB, IL. The Contractor, Subcontractors, Suppliers, and any other persons and organizations performing or furnishing any of the Work shall fully comply with any and all lawful orders of Air Force Security Staff.
• Contractor will comply with security requirements established at the preconstruction conference. All employees will complete a base access form and will have a current government issued photo identification.
• All contractor material deliveries shall only be via the Mascoutah Truck Gate located off Illinois Highway 161. All Contractor personnel access to the site shall only be via the Main Gate. Entrance to the Site shall be restricted and require issuance of a security pass or badge subject to the requirements of Base Security. Contractor shall coordinate with the KO to setup access passes for all necessary workers.
• The following is information pertaining to law enforcement and security policies in effect at Scott AFB. Questions or comments that concern the Security Police, must be directed to the COR.
1. Speed Limits: Speeding is not tolerated on Scott AFB. Speed limits are posted thought the Base.
2. Speed limit while passing troops is 5 mph.
3. Reserved/Prohibited Parking Areas:
• Signs marking reserved parking list the person or category for which the space is reserved, or stating which type of decal is required to park in the space.
• Sign or yellow paint on the curb marks prohibited parking.
• Parking on the grass or seeded areas is strictly prohibited unless it is required for contract completion.
• Crosswalks: Motorists are required to yield to anyone in or about to enter crosswalk.
Project #: VDYD222004 Page 11 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022
• Cell Phones: Hands free devices are the only communication device authorized to be used when driving on Scott AFB, Illinois.
• Joggers/Cyclists: Motorists are cautioned to look out for high numbers of people engaged in exercise, especially during the middle of the day.
• Traffic Citations: Violation of base traffic rules could affect Contractor or individual access to the base. All provisions of the Illinois Vehicle Code and Air Force Regulations are enforceable for all drivers on Scott AFB, Illinois. Actions taken as result of traffic citations:
1. Notification to employer with required actions.
2. Loss of base driving privileges.
3. Fines.
4. Ban from base.
• Barricades and Lights:
1. Provide as necessary to prevent unauthorized entry to construction areas and affected roads, streets, and alleyways, inside and outside of fenced area, and as required to ensure public safety and the safety of Contractor’s employees, other employer’s employees, and others who may be affected by the Work.
2. Provide to protect existing facilities and adjacent properties from potential damage.
3. Locate to enable access by facility operators and government.
4. Protect streets, roads, highways, and other public thoroughfares that are closed to traffic by effective barricades with acceptable warning signs.
5. Locate barricades at the nearest intersecting public thoroughfare on each side of the blocked section.
• No alcohol or drugs may be possessed or used while on base.
• Weapons: No firearms, plastic explosives, fireworks, or any object which fires a projectile or explosive can be brought on base (except approved construction equipment). Offenses of this nature will be referred to the St. Clair County Sheriffs Office, the U.S. Magistrates Court, or the Bureau of Alcohol, Tobacco and Firearms.
• Gate Closures:
1. Anytime a security system is activated or a hostile act is committed on base, security procedures call for access gates to be closed until the “all-clear” is given.
Project #: VDYD222004 Page 12 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022
2. Delays will occur when attempting to enter or depart the base during such an incident.
3. The contractor will not be compensated for such delays.
• Controlled/Restricted Areas: Areas posted as Controlled or Restricted Areas (including the flight line, taxiways and ramps) are clearly marked with signs and constitute legal “No Trespassing” zones. Entry into these areas is strictly prohibited unless specific written authority is granted. Persons inadvertently entering a Controlled/ Restricted area will be apprehended by security personnel and treated as hostile until proper identity can be confirmed. Personnel should cooperate with security personnel in these types of situations since security personnel will continue to elevate force with resistance received.
• Required Coordination: If required to block off a street or portion of a street, before doing so, and with as much advance notice as possible, the Contractor shall coordinate with the Security Police Operations through the COR.
• Base Entry:
1. Check with Guard posted 24 hours a day, identify Company, and reason to be on Base.
2. Current vehicle registration, valid driver's license and vehicle insurance are mandatory when driving on IL Air National Guard property.
• The Contractor shall ensure all pilferable items are secured when not in use. Personal vehicles shall be locked when working on site. Tool boxes left on site will be secured after work hours.
• For further specifics or guidance contact the COR.
14) FIRE PREVENTION STANDARDS:
A. The following is information pertaining to fire prevention standards at Scott AFB IL ANG. These standards apply to all new construction and reconstruction, demolition, rehabilitation, alteration and modification. To report a fire, dial 911 or 618-256-5130.
B. Serious fires can occur due to accumulation of combustible materials or debris and the presence of ignition sources. Basic safeguards against construction fire hazards must be provided for during project planning. These standards outline measures which, with some pre-planning, will prevent fires or, at least minimize damage if a fire does occur.
C. Responsibilities:
A base fire department representative will attend pre-construction conference to brief the Contractor on pertinent fire regulations and to provide guidance for fire-safe operations during contract performance. Fire Prevention guidance appropriate for each type contract will be furnished the Contractor for briefing his personnel.
Project #: VDYD222004 Page 13 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022
The Contractor will furnish via the COR the fire department Fire Prevention Section and Security Police with the name(s) of responsible individuals, who, in case of a fire after normal work hours, can be notified of an incident.
The Contractor shall be responsible for assuring proper availability, operation and location of fire protection equipment, general supervision of safeguards and location of salamanders or portable heating equipment, and establishment and maintenance of safe cutting and welding operations.
The Contractor will maintain fire extinguisher within easy access whenever power tools, roofing kettles, fuels, solvents, torches, and open flames are being used.
D. Water Supply:
1. The Contractor will ensure an adequate water supply for fire protection is available whenever combustible materials accumulate.
2. Temporary connection to a main or fire hydrant by a contractor will first be coordinated through the COR with a fire department representative to ensure availability of water supply for fire protection is not jeopardized.
3. Any connection to the public potable water supply must comply with Illinois Plumbing Code using an approved cross-connection device and be coordinated with the Base Civil Engineer (BCE) through the COR.
E. Access for Firefighters:
1. Access for use of firefighting vehicles will be provided to the immediate job site at the start of construction and maintained until all construction is complete. Vehicle parking control measures will be established that will allow firefighters access to the construction site.
2. Free access from the street to fire hydrants and to outside connections for standpipes, sprinklers, or other fire extinguishing equipment, whether permanent or temporary, shall be provided and maintained at all times. No material or construction will be placed within 10 feet of hydrants or connections, or between hydrants and the centerline of the street.
F. Fire hydrants in excavations will be rigidly braced and protected from freezing.
G. Scaffolding, materials, or equipment will not block fire escape routes during performance of projects in occupied buildings.
H. Hazard Notification:
1. In accordance with AFM 91-201, Explosives Safety Manual, if storing more than 1,000 nail gun cartridges, approval must be requested from Wing Safety through the COR.
Project #: VDYD222004 Page 14 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022
2. The Contractor will notify the Fire Prevention representative, through the COR, whenever an existing fire detection, alarm, or extinguishing system must be disconnected, relocated, or extended. Fire Protection system components will be handled carefully to assure reliability when the system is restored to service.
3. Any fire hazard or condition that is not specifically covered by these specifications that is recognized by anyone will be immediately brought to the attention of supervisors or anyone having authority to stop the operation.
4. For any further fire prevention guidance or specifics, contact the COR.
15) 126 ARW STANDARD WORKDAY/WEEK
A. Government will issue base work schedule at time of contract issue.
B. When the Contractor desires to work at other than the aforementioned times, he shall submit a written request to the Contracting Officer via the COR for approval, and written approval thereof shall be required prior to proceeding with work.
C. The request shall be submitted at least five workdays prior to the proposed performance of work.
D. The request shall indicate the day/days, time/amount of work, and reason why permission should be granted to perform work during nonstandard hours.
E. Approval for work to be performed during nonstandard time will be given only in cases of necessity.
16) PERMITS
A. The Contractor shall obtain, through the COR, an AF Form 103 Base Civil Engineer Work Clearance Request (Dig Permit) from the Base Civil Engineer. The purpose of the permit is to locate, prior to excavation, all known underground utilities.
B. The Contractor shall clearly mark the location of the excavation or ground penetration with white, water-soluble, spray paint, or white utility marking flags prior to requesting the dig permit from the COR. The Contractor shall insure the markings are maintained until all responsible agencies/ offices clear the area for each utility.
C. The Contractor shall coordinate the Dig Permit request with the COR, a minimum of ten (10) working days prior to performing any excavation or ground penetration. The Contractor shall provide equipment to locate and perform the location of utilities.
D. The Contractor shall also show the identified area on a site plan. The site plan shall clearly delineate the proposed work area, nearest building, the nearest cross street to the location of digging. The Contractor shall provide this site plan to the BCE when filing an AF Form 103. In the event that a representative for the designated utility does not respond to the locating request, the Contractor shall immediately notify the Contracting Officer.
Project #: VDYD222004 Page 15 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022
E. The Contractor will receive a copy of the AF Form 103 only after each affected agency or office and the BCE have identified and cleared the utilities locations. The Contractor must have the AF Form 103 on the job site during the excavation process.
F. The Contractor shall exercise every precaution during excavation to prevent damage to the existing utilities. The Contractor shall immediately notify COR if any utilities are damaged during the location or excavation process.
G. Confined Space Permit:
H. The Contractor shall obtain from Scott AFB IL ANG, through the COR, a Confined Space Permit prior to entry into any existing Base confined space.
I. A confined space shall be as defined in OSHA.
J. The Contractor shall submit a completed request a minimum of five (5) working days prior to entry into any existing Base confined space.
17) 24-HOUR POINT OF CONTACT
The Contractor shall provide the Contracting Officer and COR with a 24-hour number or numbers where his authorized representative can be contacted at anytime day or night.
Also provide call-forwarding capability for leaving a message. This number should be provided at the pre-construction conference, but not later than ten (10) days after the Notice to Proceed is received.
18) UTILITIES AND SERVICES
A. The Contractor shall be permitted to connect to the GOVERNMENT’S existing utility system (water, electric, and sewer). The CONTRACTOR will be required to pay for connection of all utilities.
B. The Contractor shall be permitted the use of all reasonably required amounts of utilities (water, electric, and sewer) from the GOVERNMENT’s existing system outlets.
C. In addition to requirements contained in FAR Clause 52.236-14, “Availability and Use of Utility Services,” temporary utility connections shall be at the Contractor’s expense and installation shall include metering and be subject to the approval of the Contracting Officer and the COR. The Contractor shall provide telephone and other services required for the work. Removal of temporary connections will also be at Contractor’s expense.
D. If portable sanitary facilities are utilized, said facilities are subject to the approval of the Contracting Officer, through the COR, as to the location, cleanliness, and maintenance. All temporary sewer/ sanitation facilities shall be self-contained units with both urinals and stool capabilities. The units shall be sufficiently ventilated to control odors and fumes and should be emptied and cleaned at least every week or more often if required by the Contracting Officer. The door should be self-closing. The exterior
Project #: VDYD222004 Page 16 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022 color of the unit shall be any color the Contractor desires. The facility will be located behind the construction fence or out of the public view.
E. If base facilities are to be utilized, approval from the COR and the KO is required. If approval is provided, the Contractor shall clean the areas used and insure that the facilities are in the same condition as found.
F. The Contractor shall submit written notification to the COR not less than five work days in advance for each planned interruption of a utility service.
G. No single interruption shall exceed 4 hours, unless approved by the BCE and the
COR.
H. Utility service interruptions shall not be permitted unless approved by the COR.
I. Service interruptions shall be accomplished at other than normal work hours if feasible. Schedule for base non-work Fridays will be provided at the pre-construction conference.
19) DUST CONTROL
A. Contractor shall use industry-recognized best management practices to avoid creation of fugitive dust emissions and to avoid and control storm water runoff from the construction site and any temporary roads that may be used for access to it. Water sprinkling may be used to control dust. Contractor shall perform all work under this contract in such a manner that no pollutants of any kind are released into ditches, storm drains, streams, lakes or other surface waters of the site.
B. The Contractor shall maintain all excavations, embankments, stockpiles, access roads, and all other work areas free from excess dust to such reasonable degree as to avoid causing a hazard or nuisance to base personnel or surrounding facilities.
C. Approved temporary methods consisting of sprinkling, chemical treatment, light bituminous treatment or similar methods will be permitted to control dust.
D. Dust control shall be performed as the work proceeds and whenever a dust nuisance or hazard occurs.
20) PATCHING AND REPAIRING
A. After the work has been completed, any Contractor caused damages to Scott AFB IL ANG owned structures, facilities, streets, curbs, walks, lawns, etc., shall be properly patched, repaired, or replaced to the complete satisfaction of the Contracting Officer, through the COR.
B. Any holes, cuts, breakage’s, and damages made in finished surfaces of the area in which work has been accomplished, shall be properly repaired and the disfigured areas then painted over or otherwise repaired and resurfaced in kind to match the existing finishes to the complete satisfaction of the Contracting Officer, through the COR.
Project #: VDYD222004 Page 17 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022
C. The Contractor shall protect from damage all building contents located directly beneath or immediately adjacent to the site of work, and shall repair, replace, or otherwise be held liable for all such damage. Building contents include, but are not limited to, furniture, equipment, materials, or items of supplies.
21) DISPOSITION OF REMOVED GOVERNMENT PROPERTY
A. All materials and equipment to be removed by the Contractor and not reinstalled under this contract, including debris generated by this project, shall be removed at regular intervals from the site and disposed of off base by the Contractor.
B. Off-base disposal of materials shall be in conformance with applicable Federal, state, and local pollution regulations at the Contractor’s expense.
22) ACCOMPLISHMENT OF WORK
A. Prior to commencing work, the job superintendent/foreman will report to the COR or COR representative. The superintendent/foreman will verify each day the size of the crew and the number of each trade working on site.
B. Access for delivery of materials and equipment, as well as removal of demolished equipment shall be coordinated with the COR who will, in turn, coordinate with the BCE. Construction personnel entry and locations of construction delivery, debris removal, construction storage and trailers, construction parking and personnel entries will be provided by the BCE at the preconstruction meeting or to the COR, as appropriate.
C. Base communications personnel shall be allowed to work periodically within the project area during the construction period installing operational communication lines, as needed.
D. Smoking will not be permitted within any area of any federal building.
E. Burying or burning waste materials on site will not be permitted. Washing waste material down sewers or site waterways will not be permitted.
F. Upon completion of specified work in the contract, The Contractor will clean the work area, and if applicable, staging and storage areas. Areas will be cleaned to pre-construction existing conditions.
23) RECYCLING
In support of national environmental efforts, the Contractor is encouraged to recycle general administrative refuse associated with this project. This refuse includes cardboard, one gallon mark 1 and 2 plastic bottles, type 1 and 2 plastic soda bottles, aluminum and steel cans, and mixed paper.
24) COMMUNICATIONS COORDINATION REQUIREMENTS
Project #: VDYD222004 Page 18 of 18 Project Title: REPAIR, Bldg 5024 – Life Safety 13 July 2022
Contractor shall, in order to effect the appropriate coordination and obtain clearance to operate two-way radio and radio frequency transmitting equipment on Scott AFB IL ANG, contact the Frequency Management Office through the COR.
25) PRECEDENCE OF AIR OPERATIONS
The Contractor shall never be on or near any aircraft operating surface unless specifically called for in the performance work statement. Prior coordination with the COR is mandatory.
26) PROJECT MEETINGS
A. The Government shall schedule and preside at a pre-construction conference. The Government shall make physical arrangements for meetings, record minutes of pre-construction conference and distribute minutes.
B. The Contractor shall conduct periodic progress meetings, (established at the pre-construction conference), record, reproduce and distribute minutes of all other meetings within 5 business days after each meeting to all meeting participants, all parties affected by decisions made at the meetings and furnish at least one copy to the Contracting Officer.
END
| JURISDICTIONS |
| C. Contractor shall have SOLE responsibility for accuracy of all measurements, estimates of material quantities and sizes, and site conditions that will affect the construction of this project. Below is a rough drawing of the work to be completed: |
| 3) GENERAL CONTRACTOR INFORMATION |
| 4) MATERIAL Submittals |
| General Procedures: Contractor is required to submit all shop drawings, product data, and material submittals to the KO and COR. All hard material submittals shall be sent to the COR and the KO (1 Copy Each). All submittals shall be submitted to t... |
| A. Electronically deliver all submittals to KO and COR using the following email addresses: |
| KO: christopher.fisher.7@us.af.mil |
| COR: matthew.boice@us.af.mil |
| Prior to delivery, carefully review all submittals for compliance with Contract Document and for coordination purposes, and sign the submittal form as necessary. |
| B. Transmit each item listed on the AF Form 3000 - Schedule of Submittal Materials (PDF Format). Identify Project, Contractor, subcontractor, and major supplier; identify pertinent drawing sheet and detail number, and section number, as appropriate. ... |
| Contractor shall ensure that only one submittal item is listed on the material submittal form. |
| C. After review by the A/E, COR and the KO, the contractor shall revise and resubmit within 14 days. As required, identify changes made since previous submittal. |
| D. Distribute copies of reviewed submittals to concerned persons. Instruct recipients to promptly report any inability to comply with provisions. |
| E. Coordinate each submittal with requirements of work and contract documents. |
| F. Contractor’s responsibility for error and omissions in submittals is not relieved by Government’s review of submittals. |
| G. Contractor’s responsibility for deviations in submittals from contract document requirements is not relieved by KO’s review of submittals, unless KO gives written acceptance of specific deviations. |
| H. Notify KO in writing at time of submission of deviations in submittals from contract document requirements. |
| I. Do not begin any work that requires submittals without KO’s stamp and signature indicating approval. |
| J. After KO’s review, make response required by KO’s stamp and distribute copies. |
| 5) Product Data |
| A. Collect product data into a single submittal for each element or system. Mark each copy to identify applicable products, models, options, and other data; supplement manufacturers’ standard data to provide information unique to work. Submit the num... |
| 1. Manufacturer's printed recommendations. |
| 2. Compliance with recognized trade association standards. |
| 3. Compliance with recognized testing agency standards. |
| 4. Application of testing agency labels and seals. |
| 5. Notation of dimensions verified by field measurement. |
| 6. Notation of coordination requirements. |
| B. Submit manufacturer’s printed instructions for delivery, storage, assembly, installation, and start-up, adjusting, and finishing, for product data when required. |
| C. It is the intent of the KO to give the Contractor the widest possible latitude in the use of similar products of equal quality. When a brand name description or manufacturer is identified in the SOW, such identification is intended to be descripti... |
| D. In lieu of the label, the Contractor may submit written certification from any nationally recognized testing agency, adequately equipped and competent to perform such services. |
| E. The contractor shall maintain and provide quality control over suppliers, manufacturers, products, services, site conditions, and workmanship. |
| F. Work is to be performed by qualified persons. Comply with industry standards except when more restrictive tolerances or specified requirements indicate more rigid standards or more precise workmanship. |
| G. Comply with quality control, references, specifications, and manufacturer’s data. Products containing asbestos are prohibited on this project. Use only asbestos-free products that are environmentally acceptable. |
| H. Use products with personal protection. User must read container label and material safety data sheets prior to use. |
| I. Required components to be supplied by Contractor in quantity shall be the same, and shall be interchangeable. |
| J. Materials used in this contract shall be, to the greatest extent practicable and consistent with financial prudence, made of recycled materials or with materials that are recyclable. |
| 6) Transportation, STORAGE and Handling |
| A. Transport products by methods to avoid product damage; deliver in undamaged condition in manufacturer’s unopened containers or packaging, dry. |
| B. Provide equipment and personnel to handle products by methods to prevent soiling or damage. |
| C. Promptly inspect shipments to assure that products comply with requirements, quantities are correct, and products are undamaged. |
| D. Store products in accordance with manufacturer’s instructions. Maintain products within temperature and humidity ranges required by manufacturer’s instructions. |
| E. Arrange storage to provide access for inspection. Periodically inspect to assure products are undamaged, and are maintained under required conditions. |
| F. Do not re-use, recycle or dispose of material manufacturers product containers except in accordance with all applicable regulations. The user of manufactured products is responsible for proper use and disposal of product containers. |
| 7) Pre-Final Inspection |
| A pre-final inspection of the project shall be performed to compile a list of incomplete and nonconforming work and, if necessary, to help expedite project completion. The Contractor and the COR shall conduct the Pre-final inspection. This inspect... |
| 8) Final Inspection and Acceptance |
| A. At 100% completion, the Contractor shall notify the KO that all work is complete and ready for inspection. The COR shall perform a walk through inspection of the project. A list of incomplete and nonconforming work shall be created (if required). ... |
| B. Cleaning shall be to the satisfaction of the COR and the KO. Any areas of work or adjacent areas disturbed shall be restored to original conditions. |
| a. Execute prior to notifying Government for a final inspection |
| b. Clean surfaces exposed to view; remove temporary labels, stains and foreign substances |
| c. Clean site |
| d. Dispose of all waste, rubbish, and surplus materials off base appropriately |
| 9) Final Payment |
| The KO shall not process final payment until all required documents are received and final inspection and acceptance is completed by the COR. |
| 10) Closeout Procedures |