SOW Repaint Static Displays.pdf

PDF 2 MB Posted

Attached to
RESTORATION OF TWO STATIC DISPLAY AIRCRAFT (F-4C and F-15A)
Solicitation number
W50S9E21Q0005
Issued by

View the file

Other files

File Type Posted
W50S9E21Q0005 Clauses.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

RESTORATION OF TWO STATIC DISPLAY AIRCRAFT (F-4C and F-15A)

Scope of Work. The contractor shall execute the project as stated in the SOW for restoration and preservation that maintains the aircraft in a properly altered condition. The primary goal is to preserve the history of the United States Air Force and maintain authenticity of the static display aircraft. Contractor shall provide all personnel, tools, equipment, material, supervision, technical expertise, and other related items necessary to perform restoration of aircraft i.e., sheet metal work, maintenance repairs, bird proofing and painting static display aircraft located at the Western Air Defense Sector (WADS) Air Park, Joint Base Lewis McChord, WA. Both aircraft are mounted on 12 ft tall pedestals in a grassy area next to a parking lot.

Contractor Experience. Five (5) years minimum experience in aircraft restoration work and three (3) references of past aircraft stripping and painting work accomplished.

Complete Restoration. Performance of restoration requirements will include, but not limited to paint preparation, corrosion repairs, sheet metal work, fiberglass work, primer, aircraft maintenance repairs painting, bird proofing, hardware replacement, adhesive use and vinyl/decal replacement. Provide all decals and standard markings and apply IAW Air Force Technical Order 1-1-4, Exterior Finishes, Insignia, and Markings, Applicable to USAF Aircraft 14 May 1994, Change 7, 17 July 1998, and AC 43.13-1B, Acceptable Methods, Techniques, and Practices Aircraft Inspection and Repair dated 8 September 1998 to be comparable and similar in repair for appearance and hardware of original aircraft. Paint color shade examples are listed in Federal Standard 595 Paint Specification. Contractor shall protect all landscaping adjacent to aircraft from damage. All damage caused by the contractor will be repaired or replaced at no additional cost to the government, within 10 days after identification/notification.

Preparation of Aircraft. Contractor shall assess aircraft for structural soundness and ensure previous paint, dirt deposits, residual oil, biological soils, pest, and insect/bird nests will be removed from aircraft. Contractor shall follow manufacturer’s recommended instructions for preparation and painting of highest-grade Pittsburg Paint Group (PPG) AUE-360 urethane. Inspect to ensure substrate is free of corrosion prior to primer/paint. Repair or replace any damaged panels or structural pieces. Frequently quantities of bird nests and debris are found within the structure. After removal of this debris, repair or replace areas of corrosion (caused by bird droppings, which are highly corrosive to aluminum) or damage. Prepare aircraft to a sound substrate per paint manufactures paint specifications prior to painting. Ensure to coat aircraft with primer as needed prior to painting. Paint shall not be performed on aircraft until sheet metal damage is repaired or replaced, corrosion and composite repairs are completed, primer applied, and aircraft maintenance discrepancies are completed.

The aircraft is ready for paint once the structure is repaired, prepped, and washed and government personnel inspect aircraft prior to painting. Paint scheme, colors, and pattern of aircraft shall simulate original specifications. Contractor shall ensure the painted/restored static display has a smooth finished and all decals/markings replaced as needed, and in appropriate positions simulating original specifications. Contractor shall utilize PPG Commercial Performance Coatings of AUE-360 urethane paint.

Aircraft Maintenance Discrepancy Repairs. Maintenance repairs restore aircraft to its original unaltered or properly altered condition. Where repairs, alterations, or maintenance is preformed, every effort shall be made to ensure repairs are comparable and similar in appearance and hardware. Screw applications are divided into three basic groups: structural screws, machine screws, and self-tapping screws: all can be used for static display aircraft repairs.

Bird Proofing. Install bird proofing securely to close openings and to prevent birds from landing on/in aircraft surfaces. Bird proofing consists of a number of processes, for example: bird spikes are a long lasting, humane, nearly invisible excellent low profile bird control product, used to protect numerous areas around the aircraft.

Spikes deter problem birds from aircraft areas by presenting an unsuitable landing area and preventing birds from gaining footholds. Additionally, the use of wire mesh around holes and openings will keep pests and birds from entering aircraft. All installed bird proofing shall be secure and effective, closing off holes and are humane.

Bird proof aircraft by screening, plugging or covering vents, nozzles, wheel wells, cowlings and cowl flap areas, intakes, air scoops, exhausts, aircraft stand and engines. The government shall approve all bird proofing solutions prior to installation.

Applying Adhesive and Screws. Be sure to read and follow AC 43.13-1B, Acceptable Methods, Techniques, and Practices, Aircraft Inspection and Repair for adhesive application instructions. Additional use of self-tapping screws for bird proofing adds an increase support from the environment and high winds.

Performance Period. Contractor will have 120 days to perform and complete requested work from the date of contract award, however must start within 30 days of contract award. Contractor can choose and have the ability to work weekends if so desired. Upon completion of painting, area will be cleaned to remove all items associated with the restoration process.

PERFORMANCE REQUIREMENTS SUMMARY

Performance Objective

Performance Standard and AQL Methods of Performance Assessment

Preparation of Aircraft

Contractor shall perform preparation work of the aircraft in accordance with the SOW and is acceptable to the government. Maximum allowable deviation from perfect performance is 5% failure to meet.

Onsite random Inspections.

Review of reports to ensure SOW assessment standards are met.

Complete Restoration

Contractor shall perform restoration and/or repair work in accordance with the SOW and is acceptable to the government. Maximum allowable deviation from perfect performance is 5% failure to meet.

Onsite random Inspections.

Review of reports to ensure SOW assessment standards are met.

Bird Proofing Contractor shall perform bird proofing repair work in accordance with the SOW. Maximum allowable deviation from perfect performance is 5% failure to meet.

Onsite random Inspections.

Review of reports to ensure SOW assessment standards are met.

Clean Up Upon completion of restoration, contractor shall perform cleanup of work area in accordance with the SOW. Maximum allowable deviation from perfect performance is 5% failure to meet.

Final closeout walk through.

AT / OPSEC REQUIREMENTS

Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

File details come from the government source that posted it. Updated .