SOW-Remove tree at building 40.docx
DOCX document 1 MB Posted
- Solicitation number
- 31100PR260000051
About this file
This is a Statement of Work (SOW) for tree removal services at US Coast Guard Base Los Angeles Long Beach. The contractor must provide all labor, materials, and equipment to cut down one large tree at building 40, grind the stump at least 8 inches below grade and remove visible roots, and clean the site of all debris. The work location is at 1001 South Seaside Avenue, San Pedro, California 90731. Work must be performed between 7:00 AM and 4:00 PM, Monday through Friday (excluding Federal Holidays), and the contractor must provide written notification to the Contracting Officer's Representative (COR) five business days in advance of both work commencement and final inspection readiness. All cost bids must include a detailed breakdown of labor and materials.
The contractor must comply with extensive security and administrative requirements, including submitting a list of all on-site personnel (including subcontractors and suppliers) five days prior to work for security clearance, maintaining photo identification for all personnel, and providing 48 hours advance notice of all deliveries with company and personnel details. All work must adhere to OSHA Safety and Health Standards (29 CFR Part 1920), California Construction Safety Orders, and Army Corps of Engineers EM385-1-1, with submission of an Accident Prevention/Safety Plan prior to work commencement. The contractor must secure DUNS registration and SAM.gov registration before award, handle all disposal of waste materials off-site in compliance with federal, state, and local regulations, and coordinate with the COR regarding work scheduling to minimize interference with facility operations. Water and 120V electricity are available at no cost, though contractors are responsible for utility connection and disconnection costs.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
BASE LOS ANGELES LONG BEACH
1001 South Seaside Ave.
SAN PEDRO, CALIFORNIA 90731
Scope of Work
FOR
Remove Tree at building 40 Dated: 05/20/2026
| Base Los Angeles Long Beach |
| Initial |
| Date |
TBD
Contracting Officer (KO)
Paul Nelson Paul.L.Nelson@uscg.mil Contracting Officers Representative (COR)
LT Brandon McKee
BASE FACILITY ENGINEER
GENERAL REQUIREMENTS
PART 1 GENERAL
1.01 SCOPE OF WORK: Provide all labor, materials, and equipment necessary to remove a large tree at building 40. This is lowest-price, technically acceptable solicitation. The work includes, but is not limited to, the following:
A. Cut down one large tree and haul all wood off-site.
B. Grind stump at least 8 inches below grade and remove any visible roots.
C. Clean site making sure to pick up all tree debris.
1.02 LOCATION: Project site is located next to Building 40 at US Coast Guard Base Los Angeles Long Beach, 1001 South Seaside Avenue, San Pedro, CA 90731. Contracting Officer’s Representative (COR) for this project is Paul Nelson Paul.L.Nelson@uscg.mil.
1.03 SITE INVESTIGATION: Investigate the site per FAR 52.236-3 to ascertain the general and local conditions which can affect the work or its cost. Contact: Paul L Nelson via email to arrange site access. Vendors must have DUNS and be registered at System for Award Management (SAM.gov) prior to be awarded a government Purchase Order.
1.04 CONTRACTOR SECURITY REQUIREMENTS: For this Coast Guard facility, the Contractor shall provide a list of all on-site personnel on the provided access request form, including sub-contractors and suppliers, to the Contracting Officers Representative (COR) 5 days prior to commencing work for clearance (clearance can take up to 3 business days). The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the Coast Guard facility. Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the Coast Guard facility. Contractor personnel shall have photo identification at all times while working on Coast Guard facilities.
Contractor and delivery personnel may be required to present personal photo identification to gain access to a Coast Guard installation. If identification does not indicate United States citizenship, Coast Guard Security will require proof of the legal right to work in the United States. Contractor and delivery personnel also may be subjected to an immigration status and outstanding criminal warrants check.
Contractors shall provide the COR with 48 hours of advance notice of every delivery to the site (e.g., concrete, lumber, parts, etc.) and provide the company name, delivery person, and phone number of the firm(s) making deliveries. All vehicle access to government property requires vehicle registration and proof of liability insurance. Otherwise access to the Coast Guard facility may be denied.
1.05 CONTINUITY OF FACILITIES OPERATION: Schedule work to minimize interference with the facilities normal operations. Notify the COR 3 business days in advance of any shutdowns. Contractor is required to coordinate Lock Out/Tag Out Processes and Procedures with the COR. Perform all on-site work between the hours of 7:00 AM and 4:00 PM, Monday through Friday (Federal Holidays excluded), unless otherwise approved by the COR or the Facility Engineer (FE).
1.06 NOTIFICATION OF START AND COMPLETION OF WORK: The Contractor shall notify the COR in writing (email) five (5) business days in advance of the date they intend to commence work, and five (5) business days prior to the date that work will be ready for final inspection. All notifications must be approved by the COR, in writing, prior to commencing or completing work.
1.07 RECYCLING AND DISPOSAL OF REFUSE: Refuse, excess, or waste materials resulting from construction operations shall become the property of the Contractor and shall be recycled and/or disposed of off Government property. All disposals shall be done in accordance with federal, state, and local laws and regulations.
1.08 SAFETY: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction and California Code of Regulations, Title 8, Div. 1, Ch 4, Subchapter 4 Construction Safety Orders, and Army Corps of Engineers EM385-1-1. When the standards differ, the more restrictive standard shall apply. The contractor shall provide barriers, temporary fencing, ventilation, trench covers, etc. wherever work could cause injury to workers, visitors, Coast Guard personnel, or dependents. Return work site to original condition after completion of work by cleaning and removal of all construction material. An Accident Prevention/Safety Plan shall be submitted by the contractor prior to any commencement of work.
1.09 SUPPLIES AND SERVICES: All products must meet the requirements of the Buy American and Buy America Acts as amended in DFARS 225 and the FAR 25.103.
1.010 TEMPORARY FACILITIES:
A. STORAGE: The location for exterior stock piling or lay down area of materials will be available on base with location to be determined by COR and Facility Engineer depending on size. The Contractor shall be responsible for protecting materials stockpiled against weather, damage, theft, and other risks of loss. The Coast Guard assumes no responsibility for material or equipment left in the storage area.
B. SANITARY FACILITIES: Toilet facilities are available for use located in Buildings 33.
C. WATER AND ELECTRICITY: Water and 120V electricity are available at no cost to the Contractor. Cost of these utility connections and disconnections shall be the responsibility of the Contractor. Personnel using extension cords to bring power from another location for construction, maintenance, remodeling, etc., shall employ portable ground fault circuit interrupters (GFCIs), even if connecting to building wiring. Use of portable generators and compressors is authorized at contractor expense to operate portable equipment.
1.011 All bids submitted shall include break down of cost for labor and materials.