SOW_Rehab_Island_Well__1.pdf
PDF 128 KB Posted
- Attached to
- ASIS - REHAB ISLAND WATER WELL #1
- Solicitation number
- 140P4221Q0093
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P4221Q0093_Amd_0003.pdf | ||
| Sol_140P4221Q0093_Amd_0002.pdf | ||
| Sol_140P4221Q0093_Amd_0001.pdf | ||
| Sol_140P4221Q0093.pdf | ||
| Experience_Questionnaire.docx | DOCX document | |
| MD20210010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Assateague Island National Seashore
Rehabilitate Island Potable Water Well # 1
INTRODUCTION
Purpose:
This is a contract to provide emergency repairs to the Maryland District, 314’, 6” diameter potable water well located in the developed area of the island. This well supplies potable water to both Oceanside and Bayside campgrounds. Repairs include all work necessary to remove and replace the well pump, well pump motor, well pump control box, and wiring necessary to return the well to full service according to applicable electrical code and manufacturer recommendations.
Description of Purchase:
The contractor will remove and replace the well pump and motor assembly and make any necessary repairs to the water supply line and power transmission lines. The contractor will replace the electrical control box and rubber seals on the pitless adapter. The contractor will disinfect and test the well for proper operation. Contractor will supply all necessary labor, supplies and materials needed to complete work.
SELLER RESPONSIBILITIES
Locations:
Assateague Island National Seashore, 7206 National Seashore Lane, Berlin, Maryland 21811.
Task to Be Performed by Vendor:
• Remove and replace the pump control box motor and water pump with a new Gould pump model 85GS50 or approved equal, a new Franklin Electric 5hp, 230-volt, single-phase motor and 230-volt, single-phase deluxe control box or approved equal.
• Remove and replace 180’ of 4/3 double jacketed submersible cable with ground.
• Replace two pitless adapter rubber seals.
• Chlorinate well and return well to full service.
All work will be performed at Assateague Island National Seashore, 6615 Bayberry Drive, Berlin, Maryland 21811.
Work is to be performed between 6:00AM and 3:00PM, Monday thru Friday
Dates of delivery
Estimated Period of performance 09-15-2021 to 12-15-2021. Work must be completed within 90 days after award.
Responsibilities of the Government
The Government will provide access to the worksite.
Contract Completion Criteria
The contract is complete when the well is started and tested, and fully operational and approved by the COR or his designee.
Additional Terms and Condition
In addition to any manufacturers warranties the contractor will guarantee and warranty from defect all materials and installation for a period of at least one year (365 days) from project completion.