This statement of work outlines requirements for a mezzanine installation at Royal Air Force Lakenheath. The project involves fabricating and constructing a mezzanine platform within building 657, including reconfiguring building services and ensuring load and measurement specifications are met. The work must be completed within 5 business days and be supervised by the shop lead. The contractor must provide all personnel, equipment, materials, tools, transportation, safety equipment, and other items necessary. Construction must follow standard industry practices and current building codes. The related federal contract opportunity is a solicitation from the Department of the Air Force United States Air Forces in Europe - Air Forces Africa to install the mezzanine.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit.pdf | ||
| Combo Solicitation.pdf | ||
| Quote Sheet.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
(SOW)
“Mezzanine Install” at
Royal Air Force (RAF) Lakenheath
“Rev. 1, 24 February 2023”
1.0 Introduction
1.1 Mission: Our mission, in the 100th Civil Engineer Squadron Structures Shop, is to maintain the installations infrastructure. This mezzanine requirement is essential for the addition of sign shop, utilizing vertical space in our facility, to accomplish a vast number of sign requests/updates throughout the installation. The ultimate expectation of the contractor is to provide, and install the mezzanine in its entirety, while complying with all requirements as discussed in the site visit.
1.2 Background: Currently, the shop is manufacturing all signs by hand in the break room, and printing with an outdated machine. The mezzanine addition to our building, would not only reduce the underutilized vertical space in our facility it will increase the usable work area by 30%. Additionally, the mezzanine would eliminate work related hazards from our food area sharing the same area as equipment and increase production capabilities 100%.
1.3 Scope: The project involves the fabrication and construction of a mezzanine platform system, within building 657 on RAF Mildenhall. The construction will include the reconfiguration of building services to suit the revised building layout such as lighting, ventilation grilles, and ensuring it meets all load and measurement specifications.
This work will be completed in no more than 5 business days, as specified by the quotation, and will be under supervision of the shop lead (requestor). The facility will remain operational during the completion of the construction.
2.0 General Requirements
2.1 Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute this requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall promptly identify issues to the Government and take timely corrective action. The Contractor shall seek to ensure mission partner satisfaction and professional and ethical behavior of all contractor personnel.
2.2 Contract Management & Administration
2.2.1 Contract Management: The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of resources assigned to the requirement. The Contractor must maintain continuity between the mission partner and the contractor’s corporate offices.
2.2.2 Contract Administration: The Contractor shall establish processes and assign appropriate resources to effectively administer the contract. The Contractor shall respond to the Governments requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and contractor personnel assigned to support the contract. The Contractor shall assign resources in order to maintain proper and accurate records related to this contract.
2.3 Subcontract Management: If applicable, the Contractor shall be responsible for any subcontractor and any subcontractor management necessary to integrated work executed under this contract.
2.4 Hours of Work: Work days are from Monday through Friday excluding US federal holidays and UK bank holidays.
Work hours are from 0800 to 1700 local UK time.
3.0 Product Specifications & Construction Requirements
3.1 The contractor must provide all personnel, equipment, tools, materials, supervision, transportation, safety equipment, any other items and services necessary to successfully remove/dispose current system and remove any adhesive residue; then, the new system will be installed in accordance to outlined specifications.
3.2 All construction shall be made in accordance to Standard Industry Practice. Contractor shall adhere to the most
CURRENT Building Codes, Regulations, Guidelines, and Industry Standards in the performance of this project. All work shall be done in accordance with all building codes and with manufacturer’s recommendations.
3.3 Remove existing fixtures, material and dispose of as required.
3.4 Fix minor wall damage as caused by construction.
3.5 Mezzanine to be inspected with POC and contractor periodically.
3.6 Contractor to provide control features during construction to ensure safety of construction site for workers.
3.7 Contractor shall be responsible to protect the existing facilities to include parking lot to avoid damage. Any damage resulting from construction activity shall be the contractor’s sole responsibility to repair to original condition prior to construction.
4.0 Special Requirements
4.1 Security & Safety
4.1.1 Operational Security (OPSEC): If any construction is required to take place in a Government facility, the Contractor shall be familiar with the organizational critical information and indicators list (CIIL) and OPSEC policy of any installation they require access to. The required CIIL can be provided by the Contracting Officer.
4.1.2 Safety: The Contractor and any of its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government/Contractor personnel that takes place on an installation. The Contractor shall notify the cognizant Contracting Officer within 24 hours of all mishaps or incidents. The Contracting Officer will in-turn notify the Safety Office. The Contractor shall cooperate in any resulting safety investigation.
4.2 Contractor Access to Installations: Access to DoD installations is limited to personnel with a valid installation access pass. Failure to submit required information to obtain required documentation will result in the exclusion of such employees from the installation until such documentation is obtained. Contractor employees may be subject to personal and vehicle searched when entering or leaving a DoD installation. If installation access is required, the Government will provide the Contractor with the required information and documents for installation access passes upon award. Subsequently, the Contractor shall provide a list of all employees along working under this contract, along with the required documentation upon receipt of contract award, and no later than 30 days prior to the projected need for any new installation access pass requirements. The Contractor is responsible for maintaining an adequate number of personnel with active installation access passes, and adhering to the timeframes stated in this section. The cognizant mission partner is responsible for the coordination of installation access passes. Upon termination of employment, termination or cancellation of the contract, or expiration of the contract the Contractor is responsible for collecting employee installation access passes and turning them in to the CO, or the cognizant mission partner in a timely fashion.
4.3 Shipping Instructions
4.3.1 For vendors located inside the United Kingdom.
4.3.1.1 Shipment shall be FOB Destination.
4.3.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either include the shipping in the costs of the items, or outline it in a separate line item).
4.3.1.3 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.
4.3.2 For vendors located outside of the United Kingdom.
4.3.2.1 Option One: United States Postal Service.
4.3.2.1.1 Shipping shall be FOB Destination.
4.3.2.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).
4.3.2.1.3 Weight of individual shipments must not exceed 70lbs.
4.3.2.1.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.
4.3.2.1.5 Hazardous material is not submitted.
4.3.2.1.6 The Government will provide the APO shipping address as part of the solicitation.
4.3.2.2 Option Two: Commercial small parcel carrier.
4.3.2.2.1 Shipping shall be FOB Destination.
4.3.2.2.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).
4.3.2.2.3 Weight of individual shipments must not exceed 300lbs.
4.3.2.2.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.
4.3.2.2.5 The Contractor is responsible for arranging and performing all shipping actions from origin to final destination.
4.3.2.2.6 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.
4.3.2.3 Option Three: Consolidated Shipping Point.
4.3.2.3.1 Shipping shall be FOB Destination.
4.3.2.3.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).
4.3.2.3.3 Weight of individual shipments must exceed 300lbs.
4.3.2.3.4 Dimensions of individual shipments must exceed 72 inches of any one dimensions (length, width, height).
4.3.2.3.5 Hazardous material may be shipped via this method.
4.3.2.3.6 The Contractor must complete a DD Form 1139 “XXX” to determine if the cargo can be shipped via MILAIR.
4.3.2.3.7 The Contractor shall ensure all cargo is marked “UNITED
STATES AIR FORCE” in order to ensure shipments clear customs.
4.3.2.3.8 48 FW logistics points of contact are provided for in 4.3.3.
4.3.3 Contact Information; 48th Logistical Readiness Squadron (48 LRS)
4.3.3.1 48 LRS/Inbound Customs; 48lrs.lgrddc.inboundcustoms@us.af.mil.
4.3.3.2 48 LRS/Inbound Cargo; 48lrs.inboundcargo@us.af.mil.
4.3.3.3 Commercial phone number; +44 01638 52620.
4.4 Government Furnished Material: Include any information on any Government Furnished Property (GFP) or
Government Furnished Equipment (GFE), if applicable.
4.5 Applicable Directives: List any additional directives the Contractor must comply with. Reference the directive to a specific part of the Statement of Work in order to ensure the Contractor clearly understands the requirement.
5.0 Appendix: Related Documents