DEPARTMENT OF THE NAVY

HRMC (NMD)

USS MISSISSIPPI (SSN 782)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: HRMC-507-20

INCLUDES ALL CHANGES THROUGH 1/22/2020

DRAFT

cindy.badua Highlight cindy.badua Highlight

INDEX

SHIP: USS MISSISSIPPI (SSN 782) HRMC-507-20

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-20 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE CHANGE DATE CHANGE

009-01 General Criteria; accomplish 10/01/2018 Original

009-02 Environmental Compliance Report for Material Usage; accomplish 04/30/2018 Original

009-03 Toxic and Hazardous Substance; control 04/09/2019 CH-1

009-04 Quality Management System; provide 04/09/2019 CH-1

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

08/31/2018 Original

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;

accomplish

07/24/2019 CH-2

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 08/31/2018 Original

009-10 Asbestos-Containing Material (ACM); control 04/30/2018 Original

009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original

009-19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original

009-20 Government Property; control 10/01/2017 Original

009-21 Logistics and Technical Data; provide 10/01/2018 Original

009-23 Interference; remove and install 10/01/2018 Original

009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness;

accomplish

10/01/2018 Original

009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish

10/01/2018 Original

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

10/01/2018 Original

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

10/01/2018 Original

009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original

009-67 Integrated Total Ship Testing; manage 04/30/2018 Original

009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

10/01/2018 Original

009-72 Physical Security at a Private Contractor Facility; accomplish 08/31/2018 Original

009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

10/01/2018 Original

009-74 Occupational, Safety and Health Plan; accomplish 10/01/2018 Original

009-80 Ship Facilities; maintain 11/18/2016 Original

009-81 Compartment Closeout; accomplish 08/31/2018 Original

009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original

009-84 Threaded Fastener Requirements; accomplish 10/01/2018 Original

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

03/06/2018 Original

009-99 Ship Departure Report; provide 07/18/2014 Original

009-100 Ship's Stability; maintain 03/06/2018 Original

DRAFT

cindy.badua Highlight

ITEM_NO. TITLE CHANGE DATE CHANGE

009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original

009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017 Original

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2017 Original

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016 Original

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

04/30/2018 Original

009-117 Combat Systems, Light-Off Suport; provide 08/31/2018 Original

009-118 CG Deck Loading; accomplish 07/18/2014 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 03/06/2018 Original

009-122 Temporary Padeye; install and remove 10/01/2018 Original

DRAFT

cindy.badua Highlight

ITEM NO. TITLE

Hazardous Waste Produced on Naval Vessels; control077-00-001

No. One, Ships Service Turbine Generator (SSTG); repair311-11-001

No. 2, Ships Service Turbine Generator (SSTG); repair311-12-002

DRAFT

cindy.badua Highlight

SHIP: USS MISSISSIPPI (SSN 782) ITEM NO: 077-00-001

COAR: 16 PCN: EAMC-Q151

CMP: NONE

PLANNER: UMHOLTZ, PAUL

SSP: HRMC-507-20 1 of 2 ITEM NO: 077-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Hazardous Waste Produced on Naval Vessels; control

1.2 Location of Work:

1.2.1 Throughout the Ship

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items

2.2 Resource Conservation and Recovery Act (RCRA)

2.3 Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103

2.4 Applicable Hazardous Waste Manifest Form

2.5 10 U.S.C. 7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste in accordance with 2.2 through 2.5.

3.2 Hazardous waste, as identified in 2.2, expected to be produced during performance of this Job Order: NONE.

3.3 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 The contractor is expected to use best management practice to identify and dispose of all hazardous waste.

4.2 Hazardous wastes are determined by one or more of the following methods:

4.2.1 Chemical analysis which shows that the material

characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.

4.2.2 Reference to a Material Safety Data Sheet (MSDS), or

manufacturer's information.

4.2.3 Applying knowledge of the hazardous characteristics of waste pertaining to materials and/or processes used.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

DRAFT

cindy.badua Highlight cindy.badua Highlight

SHIP: USS MISSISSIPPI (SSN 782)

SSP: HRMC-507-20 2 of 2 ITEM NO: 077-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

DRAFT

cindy.badua Highlight

SHIP: USS MISSISSIPPI (SSN 782) ITEM NO: 311-11-001

COAR: 16 PCN: EM01-Q148

CMP: NONE

PLANNER: UMHOLTZ, PAUL

SSP: HRMC-507-20 1 of 4 ITEM NO: 311-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: No. One, Ships Service Turbine Generator (SSTG); repair

1.2 Location of Work:

1.2.1 Engine Room

1.3 Identification:

1.3.1 Quantity: (One EA), No. One, SSTG, Mfr: Northrop Grumman

1.3.2 Quantity: (One EA), P/N: MS3402D24-28PX, Receptacle

1.3.3 Quantity: (One EA), P/N: MS3400D24-28PY, Receptacle

1.3.4 Quantity: (20 EA), P/N: 6512E47-13 Balanced, Nut Hex

2. REFERENCES:

2.1 Standard Items, FY-20

2.2 S9311-DE-MMO-010, Turbine Generator Set Technical Manual

2.3 6511E72, Steam Turbine Generator Assembly

2.4 S9G-N3B-TG-2.1, TG SETS, GDEB TEST PROCEDURE

2.5 6511E83C, Housing, Thrust Bearing Machining THP

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-90 of 2.1, for the disassembly, inspection, and repair of the equipment listed in 1.3.1, for the location listed in 1.2. See Note 4.1.

3.1.1 Provide the services of a qualified Original Equipment

Manufacturers (OEM) representative to disassemble, clean free of corrosion, and inspect, the No. 1 Turbine High Pressure (THP) bearing assembly, THP Radial Rotor, Turbine Low Pressure (TLP) Bearing Assy, Generator Coupling End (GCE) Bearing Assy, Turbine to Generator Coupling, Thrust Rotor, inboard and outboard Thrust Stator Assembly of the equipment listed in 1.3.1, for signs of overheating or defects, in accordance with the requirements of 2.2, 2.3, and OEM's proprietary drawings and specifications. Record the inspection results.

3.1.1.1 Submit one legible copy, in electronic media, of a

report listing results of the requirements of 3.1.1 to the

SUPERVISOR.

3.2 Remove existing Thrust Bearing Housing from the equipment listed in

1.3.1 and air freight to the OEM facility listed in 4.2 for modification in accordance with OEM proprietary drawings and specifications. Upon completion of modification return to PHNSY via air freight.

3.2.1 Accomplish Thrust Bearing Housing air flow modifications in accordance with the requirements of 2.5 and OEM proprietary drawings and specifications.

DRAFT

cindy.badua Highlight cindy.badua Highlight cindy.badua Highlight

SSP: HRMC-507-20 2 of 4 ITEM NO: 311-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.3 Remove existing, provide and install new components listed in 1.3.2 through 1.3.4 in accordance with the requirements of 2.2, 2.3 and OEM's proprietary drawings and specifications.

3.3.1 Remove existing and install new GOVERNMENT Furnished (GFM) components listed in 5.1.1 through 5.1.30 in accordance with the requirements of 2.2, 2.3 and OEM's proprietary drawings and specifications. See Note 4.4.

3.3.2 Accomplish in-place machining and grinding to final finish, the THP Radial Rotor and Sensor target area. Record final dimensional readings.

3.3.2.1 Submit one legible copy, in electronic media, of a

report listing the results of 3.3.2 to the SUPERVISOR.

3.4 Provide a letter which gives permission to Pearl Harbor Naval Shipyard Radiological personnel to monitor the radiation exposure of NORTHROP GRUMMAN personnel involved in the SSTG Dynamic Tuning evolution.

See Note 4.3.

3.4.1 Provide a report listing the NORTHROP GRUMMAN personnel who will be involved in the SSTG Dynamic Tuning evolution, and their current level of radiation exposure.

3.4.1.1 Submit one legible copy, in electronic media, of a

report listing the requirements of 3.4 and 3.4.1, to the SUPERVISOR, one week prior to SSTG Dynamic Tuning.

3.5 Accomplish SSTG micro-balancing in accordance with the requirements of 2.2 through 2.4, and OEM's proprietary drawings and specifications.

Record the results.

3.6 Accomplish SSTG Static Tuning, grooming, and SSTG testing in accordance with the requirements of 2.2 through 2.4, and OEM's proprietary drawings and specifications. Record the results.

3.7 Accomplish SSTG Dynamic Tuning in accordance with the requirements of 2.2 through 2.4, and OEM's proprietary drawings and specifications.

Record the results. See Note 4.3.

3.7.1 Submit one legible copy, in electronic media, of a report listing the requirements of 3.5, 3.6 and 3.7 to the SUPERVISOR.

3.8 Upon completion of work, submit one legible copy, in electronic media, of a report certifying all work has been completed.

4. NOTES:

4.1 Known source for OEM qualified Technical Representative:

Max Schultz

Northrop Grumman Marine Systems MLS Field Service Manager

1167 Main St, Suite 201

PO Box 420

Wyoming, RI 02898

Phone: 401-491-9550

DRAFT

cindy.badua Highlight cindy.badua Highlight cindy.badua Highlight cindy.badua Highlight

SSP: HRMC-507-20 3 of 4 ITEM NO: 311-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Cell: 401-954-4301

Fax: 401-491-9551

Email max.schultz@ngc.com

4.2 Northrop Grumman Marine Systems

401 E Hendy Ave. Sunnyvale, CA 94086

Point of Contact:

Dan Johnson

Phone No: 408-735-2140

4.3 SSTG Dynamic Tuning requires reactor plant operation. NORTHROP GRUMMAN personnel are required to wear a thermo luminescent dosimeter (TLD) device during this evolution.

4.4 Government Furnished Material listed in 5.1 furnished on Contract No. N32253-18-C-0015, issued 19SEPT2018.

4.5 All interference shall be removed by ships force and PHNSY & IMF as required.

4.6 PHNSY & IMF shall provide all rigging and crane service as required.

4.7 PHNSY & IMF and ships force shall be responsible for the disposal of all solid and liquid waste generated during the execution of this contract.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 4 EA

Socket Head Cap Screw

4D09968-

2. 2 EA

THP Catcher Bearing Axial Shim

5D87091-

3. 4 EA

Socket Head Cap Screw

4D09968-

4. 12 EA

Socket Head Cap Screw

4D09968-

5. 8 EA

Socket Head Cap Screw

4D09968-

6. 1 EA

Thrust Bearing Support Liner

5D87172-

7. 1 EA

Thrust Bearing Support Liner

5D87172-

8. 24 EA

Socket Head Cap Screw

5D87536-

9. 1 EA

Shielding Gasket, EMI End Cover

5D86559-

10. 2 EA

Shielding Gasket, EMI TB

5D86561-

DRAFT

cindy.badua Highlight cindy.badua Highlight cindy.badua Highlight cindy.badua Highlight

SSP: HRMC-507-20 4 of 4 ITEM NO: 311-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Housing Wirewell

11. 2 EA

Shielding Gasket, EMI TB Housing Cableway

5D86565-

12. 2 EA

Shielding Gasket, EMI TB Sensor

5D86563-

13. 1 EA Receptacle

MS3402D2

4-2PW

14. 1 EA Receptacle

MS3400D2

4-2P

15. 4 EA

Gasket, Connector, EMI Shielding

8516- 0109-56

16. 6 EA

Socket Head Cap Screw

5D87540-

17. 24 EA

Socket Head Cap Screw

NAS1352N

4-12S

18. 16 EA

Socket Head Cap Screw

NAS1352N

4-8S

19. 1 EA Thrust Rotor M8010600

20. 44 EA Balance Weight 5D87611-

21. 24 EA

Socket Head Cap Screw

4D09968-

22. 1 EA

Inboard Thrust Stator M8010102

23. 1 EA

Outboard Thrust Stator M8010101

24. 1 EA

Socket Head Cap Screw

5D86736-

25. 8 EA

Socket Head Cap Screw

5D86736-

26. 16 EA

Socket Head Cap Screw

4D09968-

27. 24 EA Bolt, Fitted 2884525

28. 24 EA

Nut, Self- Locking 2884524

29. 1 EA THP Radial Rotor M8010700

30. 2 EA

Gasket, Generator

5D87137-

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

DRAFT

cindy.badua Highlight

SHIP: USS MISSISSIPPI (SSN 782) ITEM NO: 311-12-002

COAR: 16 PCN: EM01-Q120

CMP: NONE

PLANNER: UMHOLTZ, PAUL

UEHARA, CHRISTOPHER

SSP: HRMC-507-20 1 of 4 ITEM NO: 311-12-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: No. 2, Ships Service Turbine Generator (SSTG); repair

1.2 Location of Work:

1.2.1 Engine Room

1.3 Identification:

1.3.1 Quantity: (One EA), No. 2, SSTG, Mfr: Northrop Grumman

1.3.2 Quantity: (One EA), P/N: MS3402D24-28PX, Receptacle

1.3.3 Quantity: (One EA), P/N: MS3400D24-28PY, Receptacle

1.3.4 Quantity: (20 EA), P/N: 6512E47-13 Balanced, Nut Hex

2. REFERENCES:

2.1 Standard Items, FY-20

2.2 S9311-DE-MMO-010, Turbine Generator Set Technical Manual

2.3 6511E72, Steam Turbine Generator Assembly

2.4 S9G-N3B-TG-2.1, TG SETS, GDEB TEST PROCEDURE

2.5 6511E83C, Housing, Thrust Bearing Machining THP

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-90 of 2.1, for the disassembly, inspection, and repair of the equipment listed in 1.3.1., for the location listed in 1.2. See Note 4.1.

3.1.1 Provide the services of a qualified Original Equipment

Manufacturers (OEM) representative to disassemble, clean free of corrosion, and inspect, the No. 1 Turbine High Pressure (THP) bearing assembly, THP Radial Rotor, Turbine Low Pressure (TLP) Bearing Assy, Generator Coupling End (GCE) Bearing Assy, Turbine to Generator Coupling, Thrust Rotor, inboard and outboard Thrust Stator Assembly of the equipment listed in 1.3.1, for signs of overheating or defects, in accordance with the requirements of 2.2, 2.3, and OEM's proprietary drawings and specifications. Record the inspection results.

3.1.1.1 Submit one legible copy, in electronic media, of a

report listing results of the requirements of 3.1.1 to the

SUPERVISOR.

3.2 Remove existing Thrust Bearing Housing from the equipment listed in

1.3.1 and air freight to the OEM facility listed in 4.2 for modification in accordance with OEM proprietary drawings and specifications. Upon completion of modification return to PHNSY via air freight.

3.2.1 Accomplish Thrust Bearing Housing air flow modifications in accordance with the requirements of 2.5 and OEM proprietary drawings

DRAFT

cindy.badua Highlight cindy.badua Highlight cindy.badua Highlight cindy.badua Highlight

SSP: HRMC-507-20 2 of 4 ITEM NO: 311-12-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

and specifications.

3.3 Remove existing, provide and install new components listed in 1.3.2 through 1.3.4 in accordance with the requirements of 2.2, 2.3 and OEM's proprietary drawings and specifications.

3.3.1 Remove existing and install new GOVERNMENT Furnished (GFM) components listed in 5.1.1 through 5.1.30 in accordance with the requirements of 2.2, 2.3 and OEM's proprietary drawings and specifications. See Note 4.4.

3.3.2 Accomplish in-place machining and grinding to final finish, the THP Radial Rotor and Sensor target area. Record final dimensional readings.

3.3.2.1 Submit one legible copy, in electronic media, of a

report listing the results of 3.3.2 to the SUPERVISOR.

3.4 Provide a letter which gives permission to Pearl Harbor Naval Shipyard Radiological personnel to monitor the radiation exposure of NORTHROP GRUMMAN personnel involved in the SSTG Dynamic Tuning evolution.

See Note 4.3.

3.4.1 Provide a report listing the NORTHROP GRUMMAN personnel who will be involved in the SSTG Dynamic Tuning evolution, and their current level of radiation exposure.

3.4.1.1 Submit one legible copy, in electronic media, of a

report listing the requirements of 3.4 and 3.4.1, to the SUPERVISOR, one week prior to SSTG Dynamic Tuning.

3.5 Accomplish SSTG micro-balancing in accordance with the requirements of 2.2 through 2.4, and OEM's proprietary drawings and specifications.

Record the results.

3.6 Accomplish SSTG Static Tuning, grooming, and SSTG testing, in accordance with the requirements of 2.2 through 2.4, and OEM's proprietary drawings and specifications. Record the results.

3.7 Accomplish SSTG Dynamic Tuning, in accordance with the requirements of 2.2 through 2.4, and OEM's proprietary drawings and specifications.

Record the results. See Note 4.3.

3.7.1 Submit one legible copy, in electronic media, of a report listing the requirements of 3.5, 3.6 and 3.7 to the SUPERVISOR.

3.8 Upon completion of work, submit one legible copy, in electronic media, of a report certifying all work has been completed.

4. NOTES:

4.1 Known source for OEM qualified Technical Representative:

Max Schultz

Northrop Grumman Marine Systems MLS Field Service Manager

1167 Main St, Suite 201

PO Box 420

Wyoming, RI 02898

DRAFT

cindy.badua Highlight cindy.badua Highlight cindy.badua Highlight

SSP: HRMC-507-20 3 of 4 ITEM NO: 311-12-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Phone: 401-491-9550

Cell: 401-954-4301

Fax: 401-491-9551

Email: max.schultz@ngc.com

4.2 Northrop Grumman Marine Systems

401 E Hendy Ave. Sunnyvale, CA 94086

Point of Contact:

Dan Johnson

Phone No: 408-735-2140

4.3 SSTG Dynamic Tuning requires reactor plant operation. NORTHROP GRUMMAN personnel are required to wear a thermo luminescent dosimeter (TLD) device during this evolution.

4.4 Government Furnished Material listed in 5.1 furnished on Contract No. N32253-18-C-0015, issued 19SEPT2018.

4.5 All interference shall be removed by ships force and PHNSY & IMF as required.

4.6 PHNSY & IMF shall provide all rigging and crane service as required.

4.7 PHNSY & IMF and ships force shall be responsible for the disposal of all solid and liquid waste generated during the execution of this contract.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 4 EA

Socket Head Cap Screw

4D09968-

2. 2 EA

THP Catcher Bearing Axial Shim

5D87091-

3. 4 EA

Socket Head Cap Screw

4D09968-

4. 12 EA

Socket Head Cap Screw

4D09968-

5. 8 EA

Socket Head Cap Screw

4D09968-

6. 1 EA

Thrust Bearing Support Liner

5D87172-

7. 1 EA

Thrust Bearing Support Liner

5D87172-

8. 24 EA

Socket Head Cap Screw

5D87536-

9. 1 EA

Shielding Gasket, EMI End Cover

5D86559-

10. 2 EA Shielding 5D86561-

DRAFT

cindy.badua Highlight cindy.badua Highlight cindy.badua Highlight cindy.badua Highlight

SSP: HRMC-507-20 4 of 4 ITEM NO: 311-12-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Gasket, EMI TB Housing Wirewell

11. 2 EA

Shielding Gasket, EMI TB Housing Cableway

5D86565-

12. 2 EA

Shielding Gasket, EMI TB Sensor

5D86563-

13. 1 EA Receptacle

MS3402D2

4-2PW

14. 1 EA Receptacle

MS3400D2

4-2P

15. 4 EA

Shielding Gasket, Connector, EMI

8516- 0109-56

16. 6 EA

Socket Head Cap Screw

5D87540-

17. 24 EA

Socket Head Cap Screw

NAS1352N

4-12S

18. 16 EA

Socket Head Cap Screw

NAS1352N

4-8S

19. 1 EA Thrust Rotor M8010600

20. 44 EA Balance Weight 5D87611-

21. 24 EA

Socket Head Cap Screw

4D09968-

22. 1 EA

Inboard Thrust Stator M8010102

23. 1 EA

Outboard Thrust Stator M8010101

24. 1 EA

Socket Head Cap Screw

5D86736-

25. 8 EA

Socket Head Cap Screw

5D86736-

26. 16 EA

Socket Head Cap Screw

4D09968-

27. 24 EA Bolt, Fitted 2884525

28. 24 EA

Nut, Self- Locking 2884524

29. 1 EA THP Radial Rotor M8010700

30. 2 EA

Gasket, Generator

5D87137-

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

DRAFT