SOW Ready Service Lockers - Draft.pdf

PDF 281 KB Posted

Attached to
USS New York Ready Service Locker Repair
Solicitation number
N50054-22-R-0014
Issued by

About this file

This document contains a draft statement of work and sources sought notice for locker repair services. The statement of work outlines requirements to disassemble, inspect, preserve, reassemble, replace gaskets, and test 21 ready service lockers aboard the USS New York, including cleaning, painting, and ensuring proper door operation. The sources sought notice requests capability statements from contractors by July 22nd to identify qualified sources for a firm fixed price contract to provide the locker repair services outlined in the statement of work from September to November 2022. The appropriate NAICS codes are identified as 336611, 337215, 32813, and 325510. Capability statements should demonstrate meeting minimum requirements and detail relevant past performance within the last three years.

View the file

Other files

File Type Posted
1360106_H Locker Details Draft.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

PLACE OF PERFORMANCE:

USS NEW YORK (LPD-21)

Naval Station Norfolk, VA 23511

DESCRIPTION OF WORK:

Record existing periphery lines, label plates, placards exact locations, colors and painted coating for interior and exterior surfaces, doors, and sun shields of the RSL lockers. Remove existing gasket from each locker door. Disassemble each locker, removing dogs, operating handles and mechanisms, hinge pins, drain plugs, sunshields and fasteners, label plates, and placards and retain for reuse.

Equipment: Ready Service Lockers (Weather Deck)

Accomplish the following for the 21 Ready Service Lockers listed on Enclosure 1.1.

Clean each ready service locker (including doors, sun shields and other normally painted surfaces) as follows:

Cleaning shall be accomplished by abrasive blasting in accordance with the requirements of 009-32 of Reference One, including Table 5, Line 31, Column A.

Accomplish a visual inspection of each ready service locker for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion. Submit one legible copy, in hard copy or approved transferrable media, of a report listing results to the SUPERVISOR.

Accomplish the requirements of 009-32 of Reference One, including Table 5, Line 31 Columns B, for each locker and door, interior and exterior surfaces, including sunshields. Colors shall be in accordance with those recorded. The topcoat color for sunshields shall be in accordance with 009-32, Note (47).

Assemble each locker, door and sunshield, including dogs, operating handles and mechanisms, hinge pins, fasteners, drain plugs, and label plates and placards retained, in their original location. Chase and tap threads on drop bolt assemblies and install new gaskets on each locker door in accordance with References One and 2.

Accomplish a chalk test on each ready service locker gasket to verify seal. Chalk imprint shall show 100 percent contact. Document results on enclosure 1.2 and submit one legible copy, in hard copy or approved transferrable media to the Government.

Accomplish an operational test of each door by cycling through 2 cycles from fully open to fully closed, to ensure proper operation. Allowable binding or misalignment: None. Document results on enclosure 1.3 and submit one legible copy, in hard copy or approved transferrable media to the Government.

References:

1. NAVSEA Standard Item FY-23

2. 804-1360106 Rev H, Locker Details

3. 804-5184210 Rev A, Locker .50 Caliber Ammunition

USS New York LPD-21

Weather Deck, Ready Service Lockers

PRIORITY TYPE JSN: CG03- RSL LOCATION

1 50 CAL 1620 #1 MT 241 1-25-1-X

2 30MM 1642 #18 MT 302 04-131-2-X

3 30MM 1641 #17 MT 302 04-131-2-X

4 50 CAL 1650 #7 MT 245 01-98-1-X

5 50 CAL 1651 # 26 MT 508 1-147-2-X

6 PYRO 1648 #24 PYRO LOCKER 1-146-2-X

7 GRENADE 1645 #21 AN/M14 H.G.L. 1-143-1-X

8 50 CAL 1628 #5 MT 503 04-45-1-X

9 PYRO 1633 #9 PYRO LOCKER 01-80-0-X

10 PYRO 1634 #10 PYRO LOCKER 01-80-2-X

11 JETTISON 1643 #19 PYRO LOCKER 1-143-2-X

12 JETTISON 1631 #23 CHAFF DECOY 1-146-2-X

13 CT RSL 1636 #12 SRBOC LOCKER 03-104-3-X

14 CT RSL 1639 #15 SRBOC LOCKER 03-106-2-X

15 CT RSL 1640 #16 SRBOC LOCKER 03-106-2-X

16 CT RSL 1638 #14 SRBOC LOCKER 03-105-2-X

17 50CAL 1629 #6 MT 504 04-45-2-X

18 50 CAL 1632 #8 RSL 01-92-1-X

19 CT RSL 1635 #11 SRBOC LOCKER 03-104-1-X

20 50CAL 1630 #13 SRBOC LOCKER 03-104-5-X

21 50 CAL 1649 #25 MT 507 1-147-1-X

Enclosure 1.1

TEST AND INSPECTION RECORD

QA FORM

1. SHIP HULL NO. 2. Work Item 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT

USS NEW YORK (LPD-21) Ammunition Storage

6. REFERENCES (COMPONENT DETAIL/ASSEMBLY DRAWING AND REV)

A. 804-1360106 Rev H, Locker Details B. 804-5184210 Locker .50 Caliber Ammunition C.

7. PART DESCRIPTION/PIECE NO.:

21 EA Ready Service Locker

8. DESCRIPTION OF TEST AND/OR INSPECTION:

“CHALK TEST”

Accomplish a chalk test on 21 each ready service locker gasket to verify seal. Chalk imprint shall show 100 percent contact.

9. RESULTS:

Check which applies:

SATISFACTORY ______

UNSATISFACTORY ______

10. CRAFTSMAN SIGNATURE DATE 11. SUPERVISOR SIGNATURE DATE

Enclosure 1.2

TEST AND INSPECTION RECORD

QA FORM

1. SHIP HULL NO. 2. Work Item 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT

USS NEW YORK (LPD-21) Ammunition Storage

6. REFERENCES (COMPONENT DETAIL/ASSEMBLY DRAWING AND REV)

A. 804-1360106 Rev H, Locker Details B. 804-5184210 Locker .50 Caliber Ammunition C.

7. PART DESCRIPTION/PIECE NO.:

21 EA Ready Service Locker

8. DESCRIPTION OF TEST AND/OR INSPECTION:

“OPERATIONAL TEST”

Accomplish an operational test of each door by cycling through 2 cycles from fully open to fully closed to ensure proper operation. Allowable binding or misalignment: None.

9. RESULTS:

Check which applies:

SATISFACTORY ______

UNSATISFACTORY ______

10. CRAFTSMAN SIGNATURE DATE 11. SUPERVISOR SIGNATURE DATE

Enclosure 1.3

File details come from the government source that posted it. Updated .