This statement of work outlines requirements for the procurement of Virginia Class submarine support equipment by the Naval Surface Warfare Center Philadelphia Division. The contractor shall manufacture, test, and deliver Virginia Class submarine racetracks, payload tube loading platforms, multiple all-up-round canister special support equipment ladder kits, and associated shipping crates. The contractor must also provide assembly support teams to install the equipment at shipyards worldwide and store items for up to eight weeks prior to delivery. The statement of work specifies technical requirements and drawings, quality inspection standards, facility and equipment needs, and data submittal requirements. It also provides estimated travel details for contractor personnel to support on-site fit-up and installation of the equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources Sought -C453 Racetrack.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW-PWS Template 14 July 2023 version Page 1
Statement of Work (SOW) for VIRGINIA Class Racetrack Procurements
1.0 INTRODUCTION
1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy’s ships, submarines, military watercraft and unmanned vehicles.
This requirement is for NSWCPD Code 453, which is responsible for engineering, maintenance, repair and outfitting of Naval Submarine Sail and Mechanical Systems.
1.1 BACKGROUND
Submarine Sail, Deployed Systems, and Modernization HM&E Engineering (Code 453) and the Undersea Vehicle, Submarine Sail and Deployed Systems Division (Code 45) of the Naval Surface Warfare Center, Philadelphia Division (NSWCPD), provide for maintenance, repair, restoration, overhaul, and testing of Submarine Sail and Hull Systems on Virginia Class Submarines in accordance with Class Maintenance Plans (CMP) and applicable Availability Work Packages (AWP). Code 453 also supports PEO Submarines and Virginia Class new construction efforts by providing sail system repair and support equipment. VIRGINIA Class Sail Racetracks, Payload Tube Loading Platforms, and Multiple All-Up-Round Canister Special Support Equipment Ladder Kits with shipping crates, are maintenance and repair support equipment used in the performance of critical sail and missile tube work.
1.2 SCOPE OF WORK
The contractor shall manufacture, test, and certify VIRGINIA Class Submarine Sail Racetracks, Payload Tube Loading Platforms, and Multiple All-Up-Round Canister Special Support Equipment Ladder Kits with shipping crates. Work supports delivery of equipment needed to execute sail system maintenance, troubleshooting, and repair. In addition, specialized equipment delivery supports the load out of submarine missile tubes with specialized payloads. In order to meet submarine fleet maintenance and operational requirements the contractor must be prepared to provide the contracted equipment as identified in the timeframes put forth. The contractor shall support preparation and ultimate loading of manufactured equipment onto government contracted transportation trucks for delivery to NSWCPD designated locations. The contractor will be required to receive, store or generate Controlled Unclassified Information (CUI) in the performance of this work.
The contractor shall also provide fly away teams that will be able to travel to waterfront locations all over the WORLD to provide final assembly support of the VIRGINIA Class Submarine Racetracks and other support equipment. The time needed will be variable based on location.
They will not be required to provide riggers, crane operator and crane. They should be prepared to supply manpower required to turn the wrenches and all required tools to assemble the racetrack.
SOW-PWS Template 14 July 2023 version Page 2
The contractor will not be responsible for the logistics of moving any of the maintenance platforms. The government will pick them up from the contractor’s location and delivery them to the appropriate location.
2.0 APPLICABLE DOCUMENTS
2.1 NAVSEA Drawing 8217065, Arrangement & Installation
2.2 NAVSEA Drawing 8217181, Assembly & Detail
2.3 NAVSEA Drawing 8357347, Weldment Details
2.4 NAVSEA Drawing 8217294, MAC SSE Modifications
2.5 NAVSEA Drawing 7066384, VLS Portable Deck Arrangement & Installation
2.6 Electric Boat Corporation Engineering Report ERH861-7010
2.7 NAVSEA Drawing 6640965, Electric Boat Corporation Drawing 2633-100-01
2.8 Electric Boat Corporation Engineering Report ER861-3140
2.9 Safety Net Vendor Drawing 11579
2.10 Special Test Document 861-826 VIRGINIA Payload Tube (VPT) Loading Platform Equipment Strength and Operations
2.11 Special Test Document 861-827 VIRGINIA Payload Tube (VPT) Loading Platform Equipment Demonstration and Fitup
2.12 NAVSEA Drawing 8660753, VIRGINA Payload Tube Special Support Equipment Test Loads/Method Procedures
2.13 NAVSEA Drawing 8283382, Portable Sail Staging Platform
2.14 NAVSEA S9074-AR-GIB-010/278, Requirements for Fabrication Welding and Inspection, and Casting Inspection and Repair for Machinery, Piping, and Pressure Vessels
2.15 NAVSEA T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods
2.16 MIL-STD-2035A, Nondestructive Testing Acceptance Criteria
2.17 ISO/ IEC 17025: General Requirements for the competence of testing and calibration laboratories (Replaced ANSI/NCSL Z540-1)
SOW-PWS Template 14 July 2023 version Page 3
2.18 NAVSEA 0948-LP-045-7010, Material Control Standard (Non-Nuclear)
2.19 NAVSEA S9074-AQ-GIB-010/248, Requirements for Fabrication Welding and Inspection, and casting Inspection and Repair for Machinery, Piping, and Pressure Vessels
2.20 VPT Platform Paint Comparison (DAROSA 11-10-2016)
2.21 MAC SSE Ladder Test Procedure
2.22 NAVSEA Drawing 7124609, Support Equipment and Container MAC
2.23 NAVSEA Drawing 7016051, Non Standard Weld Joint Design
2.24 NAVSEA Drawing 6984010, NSSN Class Submarine, NDT Notes for Welds & Material
2.25 NAVSEA Drawing 6633924, Vertical Launch System SSN688/774 Class Weapons Handling Equipment Test Loads/Methods and Inspection Procedure
2.26 NAVSEA Drawing 7016710, NSSN Class Submarine Paint Schedule Non Propulsion
2.27 NAVSEA Drawing 7069399, NSSN Class Submarine Label Plate Standards
2.28 NAVSEA T9074-AD-GIB-010/1688, Requirements for fabrication, Welding & Inspection of Submarine Structure
2.29 Manual SW820-AV-WHS-010, Installation and Removal VPT Platform (Reference only if deemed necessary)
2.30 GK Mechanical Systems Acceptance Test Procedure ATP 1273 Revision B
2.31 NUWC VPT Platform Drawing Package Clarifications and Supplemental Information
2.32 DCN Racetrack Changes - DCN #451-23-002
These documents are available online or by request. The Contractor shall reference and utilize the latest version available when performing tasks within this SOW.
3.0. REQUIREMENTS
3.1 General
3.1.1 The contractor shall provide the required VIRGINIA Class Submarine Racetracks, VIRGINIA Class Payload Tube Platform’s (VPTs) and Multiple All-Up-Round Canister (MAC) Special Support Equipment Ladder Kits (SSE) with shipping crates.
SOW-PWS Template 14 July 2023 version Page 4
3.1.2 The contractor shall provide: machining, fabrication, welding, inspection, testing, quality assurance, engineering reporting, preservation, non-destructive testing and certification for all sub, main and assembly components associated with VPT Platform sand MAC SSE deliveries. The VPT Platforms shall be manufactured in accordance with the technical requirements identified in the latest revisions, including Engineering Reports, of NAVSEA DWG’s 7066384, 8217181, 8357347 & 8217065. The MAC SSE Ladder Kits shall be manufactured with technical requirements identified in the latest revision of reference NAVSEA DWG 8217294.
a. All materials, tooling and test equipment associated with completion of the requirements are solely the contractor’s responsibility.
b. All Non-Conformances and Technical questions regarding fabrication and drawing requirements shall be formally submitted to the assigned COR and cc’d to NSWCPD, Code 453 Subject Matter Expert, by the contractor using Condition Reports, Engineering Reports or comparable feedback documentation.
3.1.3 The contractor shall paint and preserve all manufactured equipment in accordance with requirements identified on each manufacturing drawing. In addition, clarification guidance provided in “NUWC VPT Platform Drawing Package Clarifications and Supplemental Information” document shall be used.
3.1.4 Upon completion of manufacturing all VPT Platforms shall be inspected/weight tested/operational tested in accordance with Special Test Documents 861-826, Sections 8.2.5, 8.2.7, 8.2.8, 8.2.9, 8.2.10, 8.3, 8.4, 8.5 and NUWC DWG 8660753 Acceptance testing of K- Locks is in accordance with Acceptance Test Procedure 1273 Rev. B.
a. Contractor shall notify Government Oversight Representative of scheduled dates for load testing and inspections of each VPT platform. Notification of test/inspection dates shall be made to the Government a minimum of (2) weeks prior.
3.1.5 Completed racetracks, VPT Platforms, and ladder kits shall require assembly and fit-up to ensure any/all modifications required with the host platform are addressed prior to the Government taking acceptance. VPT Platform fit-up shall be performed in accordance with Manual SW820-AV-WHS-010
a. Contractor will be required to perform a review of the fit-up and propose a modification plan to be executed after review by the Government.
3.1.6 The contractor is required to support a fit-up of each VPT Platform and ladder kit manufactured, unless waived by the Government. Fit-up will be performed on a submarine scheduled by the government at either the Norfolk Naval Operations Base or the Naval Submarine Base New London. Contractor is required to provide representative(s) on-site for the fit-up to ensure proper installation, mating and functionality per drawing requirements of each unit. Transportation for each VPT Platform and ladder kit shall be scheduled and funded by the Government. Upon completion of the fit-up test, the unit will be returned to the contractor’s facility for corrective actions, if required, and for final inspection and acceptance by the
Author Confirm if we are using a COR for this contract
Author CP – There will be a COR.
SOW-PWS Template 14 July 2023 version Page 5
Government. After final inspection and acceptance, the Contractor shall be required to store the equipment for up to eight (8) weeks prior to shipping. Contractor shall provide crane and rigging services to load and unload each VPT Platform and ladder kit onto the Government truck at the contractor’s facility in support of the fit-up test and at the time of acceptance for the final transportation arrangement by the government from the contractor’s facility.
3.1.7 Upon completion of manufacturing the MAC SSE Ladder Kits shall be tested in accordance with contractor’s developed Factory Acceptance Procedure and include all test requirements identified in drawing NAVSEA DWG 8217294.
a. Procedure shall be submitted to the assigned COR and cc’d to NSWCPD, Code 453 (Kenneth Pasternack), for approval. Procedure shall demonstrate satisfactory fabrication, strength, and operational use and include but not limited to:
i. Static/Load Test on Lifting Points
ii. Dimensional Verifications
iii. Fit-Up Verification
b. Contractor shall notify Government Oversight Representative of scheduled dates for load testing and inspections of each MAC SSE Ladder Kit. Notification of test/inspection dates should be made to the Government a minimum of (2) weeks prior.
3.1.8 The contractor shall provide: machining, fabrication, welding, inspection, testing, quality assurance, engineering reporting, preservation, non-destructive testing and certification for all sub, main and assembly components associated with Sail Racetrack deliveries. The racetracks shall be manufactured in accordance with the technical requirements identified in the latest revisions, including Engineering Reports of NAVSEA DWG 8283382.
a. All materials, tooling and test equipment associated with completion of the requirements are solely the contractor’s responsibility.
b. All Non-Conformances and Technical questions regarding fabrication and drawing requirements shall be formally submitted to the assigned COR and cc’d to NSWCPD, Code 453 (Kenneth Pasternack), by the contractor using Condition Reports, Engineering Reports or comparable feedback documentation.
3.1.9 Upon completion of manufacturing all racetracks shall be weight tested in accordance with test requirements identified in NAVSEA DWG. 8283382 and Design Change Notice (DCN) #451-23-002.
a. Contractor shall notify Government Oversight Representative of scheduled dates for load testing and inspections of each racetrack. Notification of test/inspection dates shall be made to the Government a minimum of (2) weeks prior.
b. The contractor is required to support a fit-up of each racetrack manufactured, unless waived by the Government. Fit-up will be performed on a submarine scheduled by the government at either the Norfolk Naval Operations Base or the Naval Submarine Base
SOW-PWS Template 14 July 2023 version Page 6
New London. Contractor is required to provide representative(s) on-site for the fit-up to ensure proper installation, mating and functionality per drawing requirements of each unit. Transportation for each racetrack shall be scheduled and funded by the Government.
Upon completion of the fit-up test, the unit will be returned to the contractor’s facility for corrective actions, if required, and for final inspection and acceptance by the Government. After final inspection and acceptance, the Contractor shall be required to store the equipment for up to eight (8) weeks prior to shipping. Contractor shall provide crane and rigging services to load and unload each VPT Platform and ladder kit onto the Government truck at the contractor’s facility in support of the fit-up test and at the time of acceptance for the final transportation arrangement by the government from the contractor’s facility. The government shall schedule the racetrack fit-up test to coincide with the VPT Platform fit-up test identified in Section 3.1.6. The racetrack and VPT Platform fit-up submarine hull, install location, and fit-up test shall be the same.
3.1.10 The contractor shall perform the inspections required by the individual procedures and deliver Condition Found Reports (CFR) (A004) to document and request disposition on deficient material.
3.1.11 Upon completion/certification of racetracks, payload tube platforms and MAC SSE ladders, Government shall arrange/fund transportation to final destinations. Contractor shall provide crane/forklift services for loading completed racetracks, platforms and ladders onto transportation flatbed.
3.1.12 Government technical guidance provided in responses to contractor Condition Report submittals shall be used in the manufacturing of VPT Platforms, racetracks, ladder kits and shipping crates.
3.1.13 The contractor shall support review meetings with the Program Sponsor, NSWCPD and NUWC representatives as necessary.
3.2 Facilities
3.2.1 The contractor shall possess or have the ability to obtain facilities and equipment (ma-chines, tooling, services, and space) to fabricate assemblies; safely and securely move and maintain materials; and process and certify material and equipment.
3.2.2 The contractor shall maintain or have access to a fully outfitted machine shop capable of manufacturing or prefabricating parts and performing certification testing. The requirement for these facilities shall not be construed to mean the contractor is entitled to or the Government is obligated to reimburse the contractor for any direct costs in connection with or occasioned by these facilities. Adequate facilities shall include the following equipment:
1) Material handling equipment for racetracks, payload tube platforms and MAC SSE Ladders that weight up to 20,000 lbs when fully assembled
2) Forklift with extra-long forks (12 ft long minimum) to move racetrack when dissembled and on its side
SOW-PWS Template 14 July 2023 version Page 7
3) Welding Equipment (Welding, Solder and Brazing)
4) Fabrication fixtures needed to bend, mold and form steel, aluminum, stainless and other high strength materials into compound shapes
5) Painting, coating, electroplating equipment and designated clean area work site to apply specialized coatings to fabricated components and assemblies
6) Secure work and storage areas to maintain hardware and component integrity throughout manufacturing process
3.2.3 The contractor must possess the following test equipment/specialized services or be able to demonstrate the ability to obtain such:
1) Mechanical, optical or laser equipment suitable for obtaining straightness, point to point dimensional readings and contour validation for the required assemblies
2) Services and equipment to perform non-destructive testing of welded, brazed, soldered joints including but not limited to Visual, Magnetic Particle and Pressure Testing
3) Load testing the platforms with the use of additional weight
3.3 Material
3.3.1 The contractor shall furnish all necessary materials and equipment required for the performance of individual delivery orders. The contractor shall be responsible for providing all hand tools necessary, at no cost to the Government, in performance of this contract. Hand tools are described as standard tools of the trade such as hammers, drills, wrenches, screwdrivers, pliers, safety cable crimp tools, lock wire pliers, torque wrenches, etc. and typical tools required to perform tasks set forth. It shall be the contractor’s responsibility to maintain all Contractor furnished test equipment properly calibrated (every 12-month period) and in a ready for use condition to the extent necessary to avoid impacting the performance requirements of the delivery order. Responsibility for the provision of basic mechanical and electrical tools and test equipment shall rest with the Contractor with no cost to the Government.
3.3.2 The contractor will be responsible for storage and staging of contractor acquired materials and equipment. The contractor must possess an adequate procedure covering the acquisition, tracking, transportation and storage of all material and equipment used during performance.
4.0 DATA REQUIREMENTS
4.1 Contracting Officer’s Management Report (Contract Data Requirements List (CDRL) A001)
4.2 Integrated Production Schedule (IPS) Report, (CDRL A002)
4.3 Production Status Report (CDRL A003)
4.4 Condition Found Report (CDRL A004)
4.5 Government Furnished Information Deficiency Report (CDRL A005)
SOW-PWS Template 14 July 2023 version Page 8
4.6 Approved Welding Procedure (CDRL A006)
4.7 Welding Procedure Qualification Test Report (CDRL A007)
4.8 Certification Demonstration Procedures (CDRL A008)
4.9 Test and Inspection Reports (CDRL A009)
4.10 Request for Variance (CDRL A010)
4.11 Request for Waivers (CDRL A011)
5.0 PLACE OF PERFORMANCE
5.1 Performance will occur at contractor or sub-contractor facilities.
6.0 TRAVEL
6.1 The Contractor will be required to travel from the primary performance location when supporting this requirement. Travel will be identified at the individual delivery/task order level.
6.2 Travel in support of this requirement is estimated, but not limited to, the following locations listed in the chart below. In addition, we included the estimated amount of trips, people and days required for each trip. The below estimate is per year, however, we do not anticipate requiring all of the trips listed. Required trips will be based on ship location and needs.
Origin Destination Base Trips Ppl Days
Duty Station Norfolk, VA Norfolk Naval Operations Base 2 3 7 Duty Station New London, CT Naval Submarine Base New London 2 3 7 Duty Station Pearl Harbor, HI Naval Station Pearl Harbor 1 3 12 Duty Station Yokosuka, Japan US Navy Station Yokosuka, Japan 1 3 14 Duty Station Piti, Guam Naval Base Guam 1 3 14 Duty Station Portsmouth, NH HMNB Portsmouth 1 3 7 Duty Station San Diego, CA Naval Base San Diego 1 3 8 Duty Station Faslane, UK Royal Navy Base Faslane/Crombie 1 3 14 Duty Station Garden Island, Australia HMAS Stirling Naval Base 1 3 20
7.0 GOVERNMENT FURNISHED PROPERTY
7.1 There is no Government Furnished Property associated with this contract.
8.0 GOVERNMENT FURNISHED INFORMATION
SOW-PWS Template 14 July 2023 version Page 9
8.1 Government will furnish Technical Manuals, Maintenance Standards, Work Instructions, Drawings, and DCN to facilitate the overhauls as required.
9.0 Non-Electronic Materials
Department of the Navy contractors (and their subcontractors at all tiers) who obtain critical or high risk materiel shall implement a risk mitigation process as follows:
• If the materiel is currently in production or currently available, solicitations shall require the materiel to be obtained only from authorized suppliers.
• If the materiel is not in production or currently available from authorized suppliers, solicitations shall require the materiel to be obtained from suppliers that meet appropriate counterfeit avoidance criteria.
• Require the contractor to notify the contracting officer when critical or high risk materiel cannot be obtained from an authorized supplier.
• Require the contractor to take mitigating actions to authenticate the materiel if purchased from an unauthorized supplier.
• Require the contractor to report instances of counterfeit and suspect counterfeit materiel to the contracting officer and the GIDEP as soon as the contractor becomes aware of the issue.
10.0 SPECIAL REQUIREMENTS
10.1 Contractor’s Quality/Inspection System:
The contractor(s) shall provide and maintain a written inspection system, which will assure that all supplies submitted to the Government for acceptance conform to contract requirements whether manufactured or processed by the contractor, or procured from subcontractors or vendors. The contractor(s) shall perform or have performed the inspections and tests required to substantiate product conformance to drawing, specifications, and contract requirements and shall also perform or have performed all inspections and tests otherwise required by the contract. The contractor(s)’ inspection system shall be documented and shall be available for review by the Naval Surface Warfare Center Philadelphia Division – Philadelphia Navy Yard Site, 5001 South Broad Street, Philadelphia, PA 19112-5083, Attn. Code 453, via the cognizant DCMA or CAO, fifteen (15) days after award of contract and throughout the life of the contract(s). The contractor(s) shall notify the Naval Surface Warfare Center Philadelphia Division in writing of any change to the inspection system(s). The inspection system shall be subject to disapproval if changes thereto would result in nonconforming product. Contractors currently operating under ANSI/ISO/ASQ 9001 or MIL-I-45208 quality system will be deemed acceptable under this provision.
10.1.1 The Quality/Inspection System shall also include the following:
1) Inspection, Measuring, and Test Equipment in accordance with the requirements of reference
2.17
SOW-PWS Template 14 July 2023 version Page 10
2) Controls to assure that requirements of this contract/delivery order are invoked on subcontractors and the contractor verifies implementation by subcontractors
10.2 Inspection and Test
10.2.1 The Contractor is responsible for performing or having performed all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers’ parts.
10.2.2 The Government reserves the right to perform any of the inspections set forth in the above requirements where such inspections are deemed necessary and in the Governments best interest to ensure that supplies conform to requirements.
10.2.3 Due to the critical nature of this material, the contractor shall notify NSWCPD when material is ready for inspection to allow NSWCPD the option to perform quality assurance surveillance. Advanced notification shall be made minimum of (14) days prior to the scheduled inspection date.
10.2.4 At the Government’s discretion a representative of the cognizant Contract Administration Office (DCMA) may perform Government Source Inspection (GSI) at the contractors or subcontractors plant. To allow for adequate planning, advanced notification for requested GSI shall be made to that office minimum of (14) days prior to the scheduled inspection date.
10.2.5 All request/ notifications to NSWCPD and the cognizant Defense Contract Management Agency (DCMA) shall be submitted via Email. Email notification shall include the contract number/ delivery order, contract line item, part number and surveillance activity for which is requested.
10.3 Procedures
10.3.1 The contractor shall be required when stated in the delivery order to submit the following types of procedures to NSWCPD:
1) Inspection plan (CDRL A008)
2) Straightness test procedure, and/or optical alignment procedure (CDRLA008)
3) Wall thickness measurement procedure (CDRL A008)
4) Weight/Holding capacity test (CDRL A008)
5) Nondestructive Test Procedures in accordance with NAVSEAT9074-AS-GIB-010/271 for:
a) Liquid Penetrant (PT) (CDRL A008)
b) Radiography (RT) (CDRL A008)
c) Ultrasonic (UT) (CDRL A008)
d) Magnetic Particle (MT) (CDRL A008)
e) Visual Weld Inspection (VT) (CDRL A008)
f) Written welding procedures, welding procedure qualification test data, and welder
Qualification data in accordance with NAVSEA S9074-AQ-GIB-010/248 and
NAVSEA S9074-AR-GIB-010/278 (CDRL A006)
Author Does this 7 day minimum conflict with direction provided in Section 3 above which states in various section that 2 weeks must be provided?
Author Updated to align with section 3 above.
Author Same as above, should this be 2 weeks rather than 7 days?
Author Updated to align with section 3 above.
SOW-PWS Template 14 July 2023 version Page 11
g) For HY-80/100/130 materials, written welding procedures, welding procedure qualification test data, and welder qualification data in accordance with NAVSEA
T9074-AD-GIB-010/1688 (CDRL A006)
h) Repair Procedures (CDRL A008)
10.4 Records
10.4.1 All records/documents to be supplied as part of the Objective Quality Evidence Data (OQED) package shall be in accordance with CDRL A009 and conform to the following:
10.4.2 Records shall have complete traceability to the hardware/component/assembly for inspection purposes. Therefore, records shall show: contract number, name of contractor, plan number, revision letter, piece/part number, heat number, serial letter/number of finished piece, item nomenclature, and material degree of control.
10.4.3 Records for each assembly, component, delivered item shall identify the inspection, measuring or test equipment, calibration dates and calibration due dates for inspection, measuring, and test equipment used during verifications, inspections, and/or tests and include the inspector's signature and date.
Possible records requested:
1) Raw Material Certifications
2) Weld Records
3) Non-Destructive Test Records
4) Copies of Heat Treatment Certifications
5) Copies of Electrical Test Reports
6) Oil Contamination Reports
7) Pressure/Performance Test Reports
8) Inspection Records
10.4.4 Records shall be available for review by the Government and remain legible, readily identifiable, and retrievable.