- Replace Chain Link Fence
- Solicitation number
- 70Z03721QPQQ08900
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-1442PTREYESFENCE.pdf | ||
| Construction Clauses Provisions FAC 2021-04.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PT Reyes Microwave Repeater Site Fence Replacement Statement of Work
PR# 2121311PQQ089
Introduction: The existing chain link fence at the PT Reyes Microwave Site is rusted and beyond economical repair. This project is to remove the old fence and replace it with a new chain link fence.
1. Remove the old fence and posts and any associated hardware and dispose of the old fencing material at an appropriate offsite facility.
2. Remediate the landscaping overgrowth and level the ground if necessary before installing the new fence.
3. Contractor to provide all material and new hardware to complete the project.
4. Set new fence posts in concrete.
5. Install a new chain link fence with all new hardware approximately 230 feet long by 7.5 feet high in the same footprint as the old fence. (See attached photo).
6. Install an entry gate in two sections each 5.5 Foot long by 7.5 Foot high that opens outward.
7. Install barbed security wire approximately 3 feet high extending the entire length of the fence, and each section of the gate.
8. Ground the fence at each section of the gate, drive ground rods if necessary. Use mechanical connections from the rods to the fence.
9. Site is located on the PT Reyes Lighthouse property at 27000 Sir Francis Drake Blvd, Inverness, CA 94937; it is located on the left just after the gate about 400 feet from the public parking area. Coordinates 37.997.126, -123.01325 (see attachments)
10. This is an unstaffed microwave communications site, there are no specific security requirements to access the site and the gate on the access road is not locked.
11. It is the sole responsibility for the contractor to have all packaging material, excess material and any other items that generated by the project that is waste must be removed from the site. The contractor must ensure that all items that need disposal will be properly dispose of in accordance with state and federal requirements.
12. The installation and repairs must not damage any existing portion of the property. Contractor must repair any damage incurred during the course of the performed work to include cleanup of the residing portion of the property such as dust and debris removal.
13. Contractor is to perform all work during normal business hours and complete all work within five working days of the same week between the hours of 0800 -1600.
14. Site inspection can be arranged by contacting the POC: Mike Walter 510-437-3190, michael.j.walter@uscg.mil