SOW_ Protective Coatings Material - Draft.pdf

PDF 1 MB Posted

Attached to
Protective Coating Maintenance (PCM) IDIQ
Solicitation number
FA302026R0004
Issued by

About this file

This is a Statement of Work for Protective Coating Maintenance services at Sheppard Air Force Base in Wichita Falls, Texas.

The contractor must provide comprehensive painting and coating services including interior and exterior surface painting, pavement markings, floor refinishing, and a signage program. Work must be performed at three locations: the main Sheppard AFB facility, Lake Texoma Recreational Annex (approximately 2 hours away in Grayson County, Texas), and Frederick Auxiliary Airfield (approximately 1 hour away in Tillman County, Oklahoma). The contractor is required to have a minimum of three years of experience in similar work and must furnish all management, labor, tools, transportation, equipment, materials, and applicable licenses and permits. Normal job orders must begin within 7 business days of issuance and be completed within 30 calendar days unless otherwise agreed upon in writing. Priority job orders must start within 24 hours and be completed within 7 business days. The contractor must maintain the capability to handle 15 percent of total uncompleted job orders as priority work. A contract manager and Quality Control Contract Manager must be designated and available during normal duty hours (within 30 minutes) and after hours by telephone within 2 hours for emergency situations.

Specific services include interior painting using Federal Standard colors with semi-gloss or flat finishes; exterior painting of facility surfaces, sign backs, curbs, posts, railings, HVAC equipment, fuel tanks, generators, and other equipment using specified Federal Standard colors; swimming pool depth markings and warnings in compliance with Air Force and Texas regulations; fire hydrant painting with reflective granules and numbering; pavement markings on roads, parking lots, and airfields using traffic white and yellow colors with reflective media; wall covering removal; floor finishing; wood surface preparation and finishing; caulking and sealants; and sign fabrication using aluminum sheeting with pressure-sensitive vinyl lettering and reflective sheeting. The contractor must submit monthly hazardous material inventories and usage reports, comply with environmental management system requirements including completion of Environmental Awareness Course Hub training modules by supervisory personnel, and adhere to all local, state, and federal environmental regulations. The SOW includes detailed measurement and invoicing procedures across multiple Contract Line Item Numbers (CLINs) ranging from X001AA (Exterior Surfaces under 25 feet) through X015 (Multi-Ceramic Roof Paint), with measurements in square footage, linear footage, or each as applicable. The contractor is responsible for all surface preparation, cleanup, traffic control for pavement work, and proper disposal of hazardous waste materials in compliance with environmental regulations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

PROTECTIVE COATING

MAINTENANCE

Sheppard AFB, Texas

Statement of Work Protective Coating Maintenance

SOW 2 of 33

SOW 3 of 33

1 SCOPE OF WORK:

Except as specified, the contractor shall provide all management, plant, labor, tools, transportation, travel, equipment, materials, and applicable licenses, permits, and/or certificates, and any other items necessary to perform all work within the Protective Coating Maintenance (PCM) contract. The contractor shall have a minimum of 3 years experience in similar work as specified in this Statement of Work (SOW). The contractor shall consistently provide quality services to include painting of interior and exterior surfaces, pavement markings, floor refinishing, and signage program in accordance with contract documents and standards of the industry. The contractor shall not substitute paint systems (enamel, latex, etc.) that do not match the existing paint system without the COR’s approval. Work will normally be done with the facility occupied. This contract does not give the contractor exclusive right to perform work that falls within the scope of the contracts on Sheppard Air Force Base (SAFB) or satellite facilities; government personnel or other contractors may be solicited to perform the same type of work that may be included in major projects.

1.1 Location:

Sheppard AFB is located in Wichita County in the northern part of Wichita Falls, Texas. Contractor and contract employees shall enter Sheppard AFB through the Missile Road gate, located at the intersection of Burkburnett Road and Missile Road. Due to Air Force Protection Conditions (FPCON) measures, vehicles may be inspected and delays entering and exiting through the gates is not uncommon. Any cost of delays will be at no cost to the government. The main gate may be used only in the event that the Missile Road gate is closed. The contractor will be required to maintain facilities outside Sheppard AFB boundaries.

These include Lake Texoma Recreational Annex, which is located in Grayson County, Texas (approximately a 2-hour drive from Sheppard AFB), and Frederick Auxiliary Airfield, located in Tillman County, Oklahoma (approximately a 1-hour drive from Sheppard AFB). The contractor will be paid for vehicular mileage on a per vehicle basis under CLIN X0013, Travel Mileage.

2 SCHEDULES:

2.1 Normal Job Orders:

Work orders shall be submitted to the contractor by the COR using the Job Order Form (Appendix 1).

Work shall start on a normal job order within 7 business days of issuance, and shall be completed no later than 30 calendar days from issuance unless otherwise agreed upon in writing with the COR and annotated on the Job Order form. All governmental delays and/or weather delays must be provided in writing from the contractor if to be considered toward recalculating completion date. Government delays include but not limited to base closure, denied access to working area, or request to re-prioritize a different job causing contractor to pull off issued job currently working. The contractor shall have available, during normal duty hours, a point of contact for receiving all requests for work. It is the contractor’s responsible to check on a daily basis for job orders from the COR (currently located in building 1402/Civil Engineering). Estimated workload and material quantities shall be agreed upon between the contractor and the COR before the work starts. If the contractor subsequently becomes aware that the actual workload and material requirements are different from those previously agreed upon, the contractor must notify the COR before proceeding further with the project.

2.1.1 Filing System:

A copy of the all completed job order forms shall be submitted to the COR no later than by 1500 hours on Fridays or as completed. In the event of a holiday, the completed forms will be submitted the duty day prior to the holiday. A copy of the contractor's invoice shall be submitted to the COR by the Tenth business day the following month. Contractor’s portion of the job order forms will be filled out completely including the date quality control (QC) was accomplished and a signature of the Quality Control Contract Manager (QCCM). (See Appendix 1 – Job Order Form)

2.1.2 Rescheduling:

All work shall normally be started and completed on a first in, first out basis, except when directed by the COR. However, should the needs of the government change, the COR reserves the right to reprioritize projects at any time after they have been issued to the contractor at no additional cost to the government.

2.1.3 Priority Job Order:

A Priority Job Order is a job order which must be started within 24 hours of issuance to the contractor unless a later start date has been coordinated in advance. For example, the Priority Job Order is issued Aug 1 but the government does not want the contractor to start within 24 hours but rather start on Aug 15, the contractor must work it immediately on Aug 15 since it was issued as a priority with advance start date. Once a priority job is started, it shall be worked continuously during normal duty hours by a work force that is reasonable for the scope of work outlined in the job order. The contractor has 7 business days from issuance to complete a Priority Job Order unless a different date is agreed upon by the contractor and the COR and based on the reasonable timeframe a larger job would require to complete. The contractor shall have the manning and resources sufficient to be able to successfully accomplish 15 percent of the total uncompleted job orders issued under the constraints of a Priority Job Order. For example, if a total of 105 open job orders have been issued to the contractor, the COR has the authority to designate up to 15 of those open job orders as a Priority Job Order. This may be done at any time and is not limited to the initial issuance of the job order. The issuance of a Priority Job Order shall not prevent the contractor from finishing Normal Job Orders on schedule.

3 PAINTING:

3.1 Interior:

Interior paint price shall include the price for surface preparation (see Section 3.8), finish painting of all surfaces assigned, moving furniture before the job and replacing furniture after the job and all cleanup work. The contractor shall provide all materials, labor, and equipment for surface preparation, priming where priming is required and the finish coat. Generally, interior painting shall conform to Federal Standard 595b colors X7780, X7056, X6622, X6306, X6251, and X0099. Semi-gloss or flat paints (designated by "2" or "3", respectively, in place of the "X") may be used. The COR may request new colors that vary from existing color schemes. These new colors shall be applied at no additional cost to the government based on color alone. When existing color schemes vary from those colors listed above, the contractor may have to provide a primer application sufficient to ensure hiding is achieved as directed by the COR. The contractor will invoice for this primer under CLIN X003AB, Interior Primer. Contractor shall display professional (not hand written) wet paint signs in sufficient numbers and shall be posted at all entrances and exits around the job site, and other locations throughout the job. Once the paint is dry, the contractor must remove all signage.

3.1.1 Controlled Entry Facilities:

Painting of facilities with controlled entry requires prior coordination between the building’s facility manager and possibly the installation information security Non Commissioned Officer (NCO) before painting can be started in these facilities. It is likely that Controlled Entry facilities will require a full time escort for the contractor at all times, this too will need to be closely coordinated. Occasionally, controlled area have mandatory rules that must be followed such as but not limited no cell phone usage while in the

SOW 4 of 33 controlled area; the contractor will comply with all rules and regulations for the controlled area. The contractor is encouraged to contact the COR if coordinating access to these areas is difficult to accomplish and the COR will provide assistance.

3.2 Exterior:

The work to be performed includes painting of exterior of facilities and the following exterior surfaces:

sign backs, curbs, posts, railings, handrails, road guards, transformers, Heating Ventilation Air Conditioning (HVAC) equipment, fuel tanks, tanks, generators, steps, and stairwells. Generally, exterior painting shall conform to Federal Standard 595b colors 23578 (Beige), 20099 (Dark Brown), and 405 (Bronze Tone). The COR may request new colors that vary from existing color schemes.

These new colors shall be applied at no additional cost to the government. With prior approval from the COR, the Primer for new color schemes (if needed) shall be invoiced under CLINX001AD, Exterior Primer. The contractor shall provide all materials, labor, and equipment for surface preparation, priming where priming is required, and the finish coat. The contractor shall ensure hiding is complete; and except for new color schemes, it shall be done at no additional cost to the government. Each exterior painting job shall be marked with professional warning signs to inform vehicle operators and pedestrians of wet paint and painting operations taking place. Vegetation shall be protected to include irrigation system if lifts are used. These informational signs shall be of a quality commensurate to the quality of existing base-wide signs, and each job shall be marked with a number of signs that is appropriate for the size of the job.

3.2.1 Miscellaneous Exterior:

All exterior surfaces not specifically mentioned in the above paragraph or elsewhere in the SOW shall be invoiced under CLINX001AC, Miscellaneous Exterior.

3.3 Windows and Doors:

The square footage for interior and exterior windows, doors, and doorframes shall be treated as additional square footage if the government is requesting them to be painted. The contractor shall invoice the painted square footage of windows and doors to be painted under the appropriate CLINS (X001AA, Exterior; X003AA, Interior). However, if the government is not requesting them to be painted, the square footage is not deducted from the square footage of that surface unless the windows and doors are the majority of the wall surface in which case only the square footage of painted surface will be invoiced.

3.4 Materials:

Paints shall be in sealed containers that legibly show the contents and displays manufacturer's directions including any warnings and special precautions, and name of manufacturer. Paint and paint supplies shall not be stored at the jobsite unless coordinated with COR and facility manager. Paint shall be stored as required by the manufacturer and on top of contractor provided spill pallets.

3.5 Moving Objects:

Areas and items not to be painted shall be protected during painting operations. This includes, but is not limited to furniture, venetian blinds, light shades, drapes, drapery rods, roller shades, wall hangings, and pictures. All items moved for painting shall be replaced upon completion of the job. Movable partitions, light switch covers, and outlet covers shall be removed before painting. Contractor does not have the option to paint around these items. Systems furniture (cubicles) may remain in place but shall be protected during painting. Contractor shall only be responsible for the removal and replacement of items hanging on surfaces that do not require a tool to remove. Other items such as mirrors and pictures, which are bolted or otherwise affixed to the walls, shall be removed by the facility occupants or painted around. The contractor shall protect all items not to be painted from paint and any other materials used when painting.

SOW 5 of 33

Occupants are responsible for emptying closets and cabinets only when those areas are to be painted.

Contractor shall be responsible for the protection of all existing wall graphics if they are to remain. The contractor shall coordinate and cooperate with facility manager prior to moving any equipment. The contractor shall be responsible for any loss or damage to equipment, furniture and other items during handling and storage during the temporary relocation.

3.6 Fire Detection/Suppression Equipment /Exterior Grounding Equipment:

Fire detection/suppression equipment labeled as such shall be protected from painting. The contractor shall identify previously painted fire detection/suppression equipment, and the COR shall be notified prior to commencement of work. This equipment shall be protected from additional painting. The contractor shall be responsible for replacing fire detection/suppression equipment damaged by paint when the equipment is identified as being undamaged prior to the commencement of work as verified by the COR. Types of fire detection/suppression equipment are identified in the following sections.

3.6.1 Alarm Initiating Devices:

Alarm initiating devices such as heat detectors (fixed-temperature, rate-of-rise, or combination), flame detectors (ultraviolet or infrared) or smoke detectors (photoelectric or ionization), manual pull stations, and fire alarm audio/visual devices shall be protected from painting.

3.6.2 Fire Suppression Devices:

Portable fire extinguishers, sprinkler system heads, and initiating devices for installed fire suppression systems shall be protected from painting. No component of the operating device of an installed fire suppression system shall be painted unless directed by the COR. This includes sprinkler branch lines, feeder mains, valves, risers, gauges, compressors, and inspector test valves. Extinguisher brackets and cabinets shall be painted as required by the COR.

3.6.3 Emergency Devices:

Fire exit signs or fire exit directional signs shall be protected from painting. Fire rating levels affixed to doors, windows, or other components, shall not be painted or removed. Emergency light units or components shall not be painted unless directed by the COR.

3.6.4 Heating Ventilation Air Conditioning (HVAC):

The contractor shall ensure that the coils on HVAC systems do not get painted as this interferes with the performance of HVAC systems. It is the contractor’s responsibility to notify the COR if the coils have been previously painted. The contractor shall be responsible for the cost of replacing HVAC coils damaged by paint when the equipment is identified as being undamaged prior to the commencement of work as verified by the COR.

3.6.5 Exterior Grounding Equipment:

The contractor shall ensure that the exterior grounding equipment system does not get painted as this interferes with the performance of grounding systems. It is the contractor’s responsibility to notify the COR if the grounding equipment items have been previously painted. The contractor shall be responsible for the cost of replacing grounding equipment if painted or damaged by PCM contractor after being undamaged prior to the commencement of work as verified by the COR.

3.7 Paint Additive:

Paint additive is a uniquely treated fine powdered ceramic material specifically engineered to improve the effective insulation of the surfaces to which it has been applied. Once applied, it acts as a radiant heat

SOW 6 of 33

SOW 7 of 33

Protective Coating Maintenance reflecting barrier that improves comfort, reduces heating and cooling requirements and dampens ambient noise. The contractor shall provide and mix the paint additive into the appropriate paint color and type when requested on the job order. The contractor shall adhere to manufacturer’s directions for use, application, and mixing. The manufacture may recommend multiple coats be applied, however the government will indicate on job order if one coat or two coats are requested; if two coats are request, both coats shall contain the paint additive. The additive comes in one gallon pouches or five gallon pouches; one gallon pouch is to be used per one gallon of paint and five gallon pouch is to be used for five gallons of paint. The additive does cause slight thickening of the paint, therefore the contractor must use a larger container to mix therefore the contractor will not be able to add one gallon pouch directly to one gallon paint container, the mixing container must be slightly larger. The pouches must be added gradually to the paint while stirring to ensure even distribution of the additive. Contractor shall stir paint prior to commencing application if the paint has been sitting for more than 2 hours since last used as the additive may not be evenly distributed and sink toward bottom. The paint additive shall be nontoxic and Energy Star® product such as Insuladd manufactured by Tech Traders or equal.

All paint additives must be submitted to government for approval prior to use.

3.7.1 Applying Paint Additive:

Paint with additive added can be applied to interior or exterior surfaces with brush, roller or with a sprayer. Surface preparation is the same as referenced in Section 3.8, Preparation of Surfaces. If spraying painting with paint additive it is recommended a paint spray gun tip in the size range of .617 to .621 works well for most applications however thicker coating additives may required larger tip. When using the spraying application, if needed, the contractor can add ½ to 1 cup of water per gallon of paint to help the paint flow. It is important to remove the small cartridge filter from the spray gun prior to painting with additive since the filter will try and strain all of the additive granules from the paint.

3.7.2 Unused Paint with Additive:

Any unused paint can be stored back in its original container. Upon use it must be stirred to evenly distribute the granules throughout the paint. Contractor must clearly mark ALL paint cans which have the paint additive to distinguish it from other paints without the paint additive.

3.7.3 Payment of Additive:

The contractor will be issued a job order that will be clearly marked “PAINT ADDITIVE” to be added to one coat or two coats, if two coats are requested both coats shall have the paint additive unless otherwise annotated on job order. Contractor will be paid through the appropriate Contract Line Item (CLIN) such as CLIN001AA for exterior, surfaces under 25’; CLIN001AB for exterior, surfaces over 25’;

CLIN003AA for interior surfaces) at the bid price per square foot and the government will add CLIN 014, Paint Additive to the Job Order at the bid price per square foot. CLIN014 will only include the additional cost for the paint additive as a supplement to the other CLINS and will not include surface preparation or paint as that is already factored into the appropriate paint CLIN (001AA, 001AB, and 003AA). CLIN 014 will always be issued with an Exterior or Interior CLIN, but not all interior or exterior jobs will include CLIN014 only those facilities the government determines to be a candidate for the paint additive.

For example:

Square Footage X contractor’s bid price $ for CLIN001AA, Exterior Surfaces under 25’

PLUS

Square Footage X contractor’s bid price $ for CLIN014, Paint Additive ONLY

3.7.4 Payment of Multi Ceramic Roofing Paint:

The contractor will be issued a job order that will be clearly marked “Multi Ceramic” to be used for the roofs. Contractor will be paid through the appropriate Contract Line Item X015;

PREPARATION OF SURFACES:

3.8 General:

Items not to be painted which are in contact with or adjacent to painted surfaces shall be removed or protected prior to surface preparation and painting operations. The contractor shall remove all rust, dirt, dust, chalk, grease stains, existing paint runs or drips, loose, scaling, or otherwise defective paint, mildew, efflorescence, and other deposits from existing surfaces prior to painting. The contractor shall remove all masking tape, self-sticking plastic sheets, paper or other materials used to protect surfaces being painted. All loose and defective paint must be removed and edges feathered, and appropriate fill must be used as required. Surface must be smooth with no noticeable edges to the touch. All cracks, nail holes and depression shall be filled with appropriate filler. Surfaces to be painted shall be clean and dry before applying paint or surface treatments. Oil and grease shall be removed with clean cloths and cleaning solvents. Cleaning solvents shall be of low toxicity with a flash point of 100 degrees Fahrenheit or above. Cleaning shall be programmed so that dust and other contaminants will not fall on wet, newly painted surfaces. Surface chalking shall be removed by chemical, mechanical, and water blast (exterior only) techniques at no additional cost to the government. No sandblasting will be allowed. Surfaces sanded by the contractor should have no sanding marks remaining. Patching should be done with like materials to match adjacent surfaces. After painting is completed, removed items shall be put back in original location from which it was removed. All damages shall be immediately reported to the COR. Surfaces contaminated by coating materials shall be restored to their original condition and any damaged items shall be replaced before Job Order closeout or before the contractor can invoice the government.

Existing coatings, which are blistered, peeling or are in any other unsound condition shall be removed using scrapers, wire brushes, sanders or other appropriate methods. Unless otherwise specified, unsound coatings shall be removed to a point where the new coating is firmly adhering to any previous coatings and to the substrate. Firm adherence will be such that a strip of masking tape fixed to the painted area will not draw any paint with it when abruptly removed. All rough edges shall be feathered by sanding to the extent that the appearance of the finish coat is smooth and uniform.

Storm enclosures, storm window inserts, storm window frames and enclosures, screen inserts, screens, shutters, window air conditioners and other items adjacent to the wall or floor surfaces being painted shall be removed, masked, or otherwise protected prior to surface preparation and painting operations. Hardware, hardware accessories, lighting fixtures and similar items in contact with painted surfaces and not to be painted shall be removed, masked, or otherwise protected prior to surface preparation and painting operations. The contractor shall coordinate with the COR prior to painting if any ivy, trees or shrubs need to be cut away from surfaces and gutters. Surfaces not to be painted shall remain in the condition at which they existed prior to surface preparation and painting operations or they shall be restored to an equal or better condition.

Dirt, dust, heavy deposits of caulk and any other similar contaminants shall be removed from the surface by scrubbing with a solution of detergent, soap and water, or water blasting (exterior only) at no additional cost to the government; it should be factored into the price of painting. If surface is still chalky, the COR’s approval is required before priming.

SOW 8 of 33

Surface glaze remaining on existing coatings shall be removed either by lightly sanding the surface or through the use of a chemical de-glosser.

Water blasting is part of general surface preparation and shall be included in the price.

3.9 Cement-Asbestos Surfaces:

Surfaces shall be dry and clean prior to the application of primer and finish coat material. Stains shall be removed with solvents. Wire brushing will not be permitted. High pressure exterior water blasting shall be used to remove all loose paint and included in the price.

3.10 Concrete, Stucco, and Masonry Surfaces:

Surfaces shall be dry and clean before painting. Glaze, efflorescence, laitance, dirt, grease, oil, asphalt, and other foreign matter shall be removed prior to painting. Remove and patch all abandoned nonstructural nails and fasteners. Backfill all unpainted concrete block. Walls and floors of swimming pools shall be water blasted.

3.11 Ferrous Metal Surfaces:

Ferrous surfaces that have not been shop-coated shall be solvent-cleaned. Surfaces that contain loose rust, loose mill scale, and other foreign substances shall be mechanically cleaned by power wire brushing, high pressure water blasting. Minor amounts of residual rust that cannot be removed except through blast cleaning, and tight mill scale that cannot be removed by applying a sharp knife to any edge, will be allowed to remain but contractor must notify the COR. After cleaning, one coat of ferrous-metal primer shall be applied to all ferrous surfaces to receive paint other than asphalt varnish and vinyl paint. The semitransparent film applied to some pipes and tubing at the mill shall not be considered a shop coat, but shall be over coated with the specified ferrous metal primer prior to application of finish coats.

3.12 Non-Ferrous Surfaces:

Galvanized, aluminum, aluminum alloy, lead, copper and other nonferrous surfaces to be painted shall be solvent cleaned and primed when issued on job orders. These surfaces shall only be painted when approved by the COR.

3.13 Gypsum Board Surfaces:

Gypsum board surfaces shall be dry and shall have all loose dirt and dust removed prior to the application of the first coat material. Contractor shall remove any foreign substances including but not limited to non-structural nails, hooks, scotch tape, masking tape, picture hangars, and other items not mentioned, from surfaces to be painted. All holes less than 6 inches in diameter, cracks, blisters, nail pops, and any areas where the surface is damaged, shall be repaired, filled, and sanded smooth by the contractor prior to painting. Cracks 1/8 inch and less in width shall be filled by the contractor and sanded smooth prior to painting. All cracks over 1/8 inch in width and up to 1 inch in width, shall be filled, taped, floated, and textured by the contractor to match the adjoining surface. All taping shall be feathered to a width to obtain a flat, level surface over cracks and imperfections in the wall or ceiling areas. All nonstructural nails and fasteners shall be removed and their holes filled. Contractor shall remove any loose or wrinkled tape on existing joints and repair the joints by filling and re-taping. The use of masking tape on any gypsum board repair work will not be permitted.

3.14 Repair of Large Cracks in Damaged Areas:

The government will repair all large cracks over 1 inch in width and all holes and fractured surfaces over 6 inches in diameter. The contractor shall prepare and prime government-repaired cracks. Repair of large

SOW 9 of 33 holes and fractured areas in gypsum board surfaces by the government will be limited to the replacement of the gypsum board only, properly secured in place by nailing and blocking. The contractor shall fill and tape all joints in the repaired gypsum board areas using tape and joint compound applied in strict accordance with manufacturer’s directions. Repair of large holes and fractured areas in plaster surfaces, will be accomplished by the government with the required plaster surfaces left ready for priming by the contractor. The contractor shall prime the repaired areas with an approved coating.

3.15 Plaster Surfaces:

Plaster shall be thoroughly dry, clean, and free from grit, loose matter, and grease and surface irregularities before paint is applied. One coat of sealer shall be applied prior to application of the finish coat material. Sealer will be invoiced under CLINX001AD, Exterior, or CLINX003AB, Interior, Primer.

All holes, cracks, blisters, surface imperfections, and any area where the surface is damaged, shall be repaired, filled, and finished to match and blend into the existing adjoining surface as a part of the painting bid item.

3.16 Wood Surfaces:

3.16.1 General:

Wood surfaces shall be cleaned of all loose and defective paint and foreign matter and edges feathered.

Wood surfaces shall be washed with a liquid bleach solution as required and thoroughly rinsed. If the contractor sands surfaces, no sanding marks shall remain. Surfaces shall be checked to ensure that structural nails have been driven up, finishing nails have been properly set and all holes and surface imperfections properly primed. All holes and imperfections in finish surfaces shall be filled with putty or plastic wood filler, colored to match the finish coat if natural finish is required, allowed to dry, and sanded smooth. Putty or wood filler shall be compatible with subsequent coatings. All trim shall be secured where loose. All nonstructural nails and fasteners shall be removed and voids in and between finish work shall be filled with wood filler. All protruding nails shall be driven up or set, and holes filled with wood filler. The woodwork shall be sanded to remove all existing paint runs and all new paint runs. Abrasions and holes shall be filled. The contractor shall remove excess paint from door edges to allow proper closing of doors. The contractor shall leave freshly painted doors open for a sufficient time to dry. Contractor shall water blast existing wood siding when siding does not have textured coating. Methods that damage the existing wood will not be approved. Wood siding that has been previously coated with a textured system shall be patched as required. Patching includes removal of all loose coatings, re-texturing, and preparation for new paint.

3.16.2 Wood Preparation Miscellaneous:

The contractor shall have the ability to prepare miscellaneous wood surfaces including, but not limited to, wood floors, stages, dance floors, doors, chair rails, church pews, church furnishings, and wood handrails.

3.16.3 Exterior Cedar:

If mildew is present, exterior cedar (stained and natural finish) shall be washed with a liquid bleach solution and thoroughly rinsed. Protect adjacent metal and vegetation from contact with this corrosive solution.

3.17 Treatment of Mildew and Greasy Areas Requiring Washing:

Mildew and grease on painted surfaces shall be removed with hot soapy water or a recommended solution (for example, Tri-sodium Phosphate (TSP) and bleach) to eliminate mildew and grease prior to repainting. After scrubbing, the surface shall be rinsed with clear water and painted as soon as the surface is dry.

SOW 10 of 33

SOW 11 of 33

Protective Coating Maintenance

4 APPLICATION:

Interior paint shall be applied by brush or roller. Request for interior spraying may be submitted to the COR for consideration for individual job orders. If approved, contractor shall ensure there is adequate ventilation. Airless spray, brush, roller, and conventional spray may be used for exterior painting. At time of application, paint must show no signs of deterioration. Uniform suspension of pigments must be maintained during application. Paint shall be applied so finished surfaces will be free from runs, drops, ridges, waves, laps, brush marks, and variations in color, texture, gloss, and finish.

Hiding shall be complete. Application shall be in accordance with contract documents, industry standards, and manufacturer's recommendations. Each coat shall be applied as a film of uniform thickness. Rollers for applying paints and enamels shall be of a type designed for the coating to be applied and the surface to be coated. Special attention shall be given to ensure that all surfaces including edges, corners, crevices, welds, and rivets receive a film thickness equivalent to that of adjacent painted surfaces. Adequate ventilation shall be provided during paint application. Adjacent areas shall be protected by the use of drop cloths or other approved precautionary measures. The first coat on gypsum board and other wall or ceiling surfaces shall include repeated touching up on suction spots or overall applications of primer or sealer to produce a uniform color and gloss. The finish coat/ stain on all exposed surfaces of wood doors shall be applied at the same time. Paints, except water-thinned types, shall be applied only to surfaces that are completely free of surface moisture as determined by sight or touch. In no case shall paint be applied to surfaces on which there is visible frost or snow. Appropriate warning signs shall be used prior to and during all exterior and interior painting to inform facility occupants, pedestrians, and/or automobile operators.

4.1 Coating Process:

Sufficient time shall elapse between successive coats to permit proper drying. This period shall be modified as necessary to suit adverse weather conditions. Dry film thickness shall be not less than manufacture's recommendation to produce complete hiding.

4.1.1 Coating Requirements:

Unless otherwise specified below, the following are minimum coating requirements for indicated surfaces. Additional finish coats may be required by the COR if necessary to hide primed areas completely, or where the color change was so great that finish coats would not cover.

Surface Surface Prep Minimum Coating Required Previously painted interior surfaces

Clean and free from holes and divots, smooth finish from mud and tape

One full finish coat

Previously painted exterior surfaces

Clean, free from changes in thickness between different coats

One full finish coat

New surfaces, previously unpainted surfaces, sandblasted surfaces, or surfaces with greater than 75% peeling and scaling

Cleaned of all debris that would otherwise show after painting process

Full prime and two full finish coats (Or as directed by COR on job order)

Interior/exterior – enamel/latex New painting or previously unpainted

Clean surface free from debris and without cracks or holes

Spot prime and one full finish coats (Or as directed by COR on job order)

SOW 12 of 33

Protective Coating Maintenance

4.1.2 Priming Interior and Exterior:

The COR shall identify on the job order issued to the contractor if a primer coat is requested. However, if in the contractor’s expert opinion a primer coat is not needed or if one is not identified and the contractor feels a primer coat is required, the contractor is obligated to notify the COR with this information prior to commencement of the job. If needed, the job order will be adjusted to reflect the deletion/addition of a primer coat. Prior to application, the COR shall approve all primer coats.

4.2 Lettering:

All existing painted or vinyl lettering or numbering on surfaces to include doors and walls that require painting shall be re-lettered or renumbered by the contractor to match previous lettering. Measurements shall be per letter. The price shall include materials and labor required to manufacture, layout and apply lettering on government-furnished surfaces. Letters will be invoiced under CLINX0010AF or X0010AG.

An example of a typical job requiring re-lettering/renumbering would include dormitory rooms or lodging.

4.2.1 Marking Swimming pool Areas:

The contractor shall ensure the below markings are completed on the pools in accordance with Air Force Instruction AFI34-101 Air Force Morale, Welfare, and Recreation (MWR) Chapter 19 Swimming & Aquatics, papa19.3- AFI 48-114, Swimming Pools, and Texas Administrative Code, Title 25, Part I, Chapter 265, Sub chapter , Public Swimming Pools.

• Mark water depths on the pool deck every 10 feet. Make similar markings on the pool gutter or deck edge so they are visible from inside the pool, as well as outside of the pool.

• Depth markers shall be in numerals of 4 inches minimum height and a color contrasting with the background (such as black).

• The warning words “NO DIVING” and the international symbol for no diving shall be clearly marked on the pool deck with an acceptable contrasting color and letters at least 4 inches in height. The warning shall be placed at least every 25 feet or faction thereof around the pool where the water depth is 6 feet or less, but at a minimum placed at the shallow end and the two sides at least once on each side.

• Warning signs/markings shall be slip resistant. The NO DIVING warning shall be within 24 inches of the water edge and positioned to be read while standing on the deck facing the water.

4.3 Fire Hydrants:

Fire hydrants shall be prepped and painted on the same day. At no time will the hydrant be permitted to stand overnight in an unpainted/unnumbered condition. Fire hydrants shall be painted to conform to the Federal Standard 595b colors: Hydrant bodies - 23578 (beige); hydrant caps - 24190 (green), 22510 (orange), 25095 (blue), 38905 (red). Fire hydrant tops are color coded to indicate flow rate; the appropriate color will be specified on the job order. Reflective granules shall be applied to the hydrant in a uniform manner. Fire hydrant caps will not be painted in a manner in which they cannot be unscrewed. Included in the price to paint hydrants shall be the process of numbering or renumbering each hydrant via stencils or vinyl letters. The job order will indicate the numbering system.

4.4 Mixing and Thinning of Paints:

Reduce paints to proper consistency by adding fresh paint, except when thinning is mandatory to suit surface, temperature, weather conditions, application methods, or for the type of paint being used. Mixing shall be in accordance with the paint manufacturer.

When thinning is allowed, paints shall be thinned immediately prior to application. The use of thinner does not relieve the contractor from obtaining complete hiding, full film thickness, or required gloss.

Thinning shall not cause the paint to exceed limits on volatile organic compounds.

4.5 Two-Component Systems:

Two-component systems shall be mixed in accordance with manufacturer's instructions. Any thinning of the first coat to ensure proper penetration and sealing shall be as recommended by the manufacturer for each type of substrate.

5 WALLCOVERINGS:

5.1 Removal of Wall Covering:

The contractor shall remove specified wall covering in accordance with industry standards and current practices. When issued a job order to remove a wall covering, contractor shall first inspect the location for possible sub-surface damage. If damage is suspected, the contractor shall notify the COR prior to wall covering removal. If sub-surface damage is found after job commencement, the contractor shall stop work immediately and notify the COR.

5.2 Temperature Requirements:

Minimum temperature of area to receive wall covering, before, during, and after installation, and requirements for conditioning adhesive and wall covering shall comply with the wall covering manufacturer’s printed instructions. However, in no case shall the area temperature be less than 10 degrees Celsius/50 degrees Fahrenheit, 72 hours prior to, during installation, and until the adhesive is dry.

Observe ventilation and safety procedures specified in the Material Safety Data Sheet (SDS).

Contractor shall inspect all areas and conditions under which wall coverings are to be installed. Contractor shall notify, in writing, any conditions detrimental to the proper and timely completion of the installation. Work will proceed only when conditions have been corrected and accepted by the installer.

6 PAVEMENT MARKINGS:

Contractor shall perform all tasks in connection with preparation and application of traffic marking paint and reflective media, preformed tape, and markings to roads, streets, parking lots and airfield markings and pavement areas. All pavement painting and markings shall be coordinated with the COR and security forces, hospital, and fire emergency response personnel.

Preformed tape may be used for localized task orders or as a substitute for any of the applications as approved by the COR.

The contractor shall use only materials that have been approved by the government.

The contractor shall use industry standard traffic white and traffic yellow colors. All pavement markings shall be applied in accordance with the current "Manual on Uniform Traffic Control Devices for Streets and Highways". All materials and application procedures shall conform to the current Texas Department of Transportation (TXDOT) specifications unless coordinated through the COR. Contractor shall achieve a uniform and complete coverage throughout the substrate surface.

Reflective sheeting for roads and streets shall be performed with pressure sensitive reflective pavement marking tape of type designed specifically for permanent application to new or existing traffic pavements.

SOW 13 of 33

6.1 Pavement Marking Removal:

The contractor is required to remove layers of paint, tape, or thermoplastic pavement stripping/markings.

The removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property. Disposal of waste shall be in compliance with local, state, and federal regulations.

6.2 Surface Preparation

Surfaces to be marked shall be thoroughly cleaned before application of the pavement marking material. Dust, dirt, peeling or poorly bonded paint, and other granular surface deposits shall be removed by sweeping, blowing with compressed air, rinsing with pressurized water or a combination of these methods as required. The price for this type of preparation shall be included in the price for pavement marking material application (paint or tape).

6.2.1 Cleaning:

Rubber deposits, surface laitance, existing paint markings, and other coatings adhering to the pavement shall be completely removed with scrapers, wire brushes, approved chemicals, or mechanical abrasion as directed by the COR and industry standards. Whenever grinding, scraping, or other operations are performed the work shall be conducted in such a manner that the finished pavement surface is not damaged or left in a pattern that is misleading or confusing.

6.2.1.1 Old Pavements:

Areas of old pavement affected with oil or grease shall be scrubbed with several applications of approved detergent or degreaser to clean pavement areas. Areas that may require this type of cleaning include:

intersections and parking lots, maintenance aprons, engine run-up areas, blast pads, and the threshold and rotation area of the runway. After cleaning, the area shall be thoroughly rinsed. After cleaning, oil-soaked areas shall be sealed to prevent bleeding through the new paint. Pavement surfaces shall be allowed to dry, when water is used for cleaning, prior to stripping or marking. When these operations are completed the pavement surface shall be blown off with compressed air to remove residue and debris resulting from the cleaning work. Any areas exposed to rain or traffic after cleaning shall be cleaned again before marking.

6.3 Weather Conditions:

Pavement marking will be suspended when weather conditions interfere with uniform application of pavement marking materials. All markings shall be uniform in length and width, with a clean cut-off at the ends and edges. Pavement marking shall be suspended during rain, snow, fog, ice, slush, mist, or when the pavement surface is wet. Apply paint to clean and dry surfaces.

6.4 Equipment:

All machines, tools, and equipment used in performance of the work shall be of suitable type and shall be maintained in satisfactory operating condition. Hand operated push-type machines of a type commonly used for application of paint to pavement surface shall be acceptable for marking small streets and parking areas. Markings shall be performed with an industry standard purpose-built machine that uses an automatic bead dispenser attached to the pavement marking equipment, and can provide continuous mixing and agitation of the pavement marking material. Applicator machines shall be equipped with the necessary paint tanks and spraying nozzles, and shall be capable of applying paint uniformly at coverage specified. Hand operated spray guns shall be used in areas where push-type machines cannot be used.

SOW 14 of 33

6.4.1 Paint Applicator:

The equipment for applying the paint binder may be self-propelled, mobile drawn or propelled by hand and shall be a pneumatic spraying machine with an arrangement of atomizing nozzles capable of applying in a single pass a line 6 inches in width. However, equipment for painting street centerline and edge markers and any line type markings on airfield pavement shall be self-propelled. The machine shall be capable of applying the paint at the rates specified by the manufacturer of the paint to be applied.

Paint shall be applied at an even and uniform thickness, with clear-cut edges. The spray mechanism shall be operated by means of quick opening and closing valves conveniently located and shall include necessary pressure regulators and gauges in full view and reach of the operator at all times. Paint strainers shall be installed in the paint supply lines to ensure freedom from residue and foreign matter that may cause malfunction of the spray guns.

6.4.2 Reflective Media Dispenser:

The dispenser for drop-on of the reflective media shall be attached to the paint dispenser and operate automatically and simultaneously with the paint applicator through the same control mechanism.

The dispenser shall be designed to provide uniform flow of reflective media at the established rate of coverage as indicated above regardless of the speed of the paint applicator to which it is attached.

6.4.3 Pre-formed Marking Application Equipment:

Mechanical application equipment shall be used for the placement of preformed pavement markings. Mechanical application equipment shall be defined as a mobile pavement-markings machine specifically designed for use in applying pre-coated, pressure-sensitive pavement markings of varying widths, up to 12 inches. The inlay method, where the preformed marking is rolled into the freshly laid HMAC (hot mix asphalt cement) paving mixture using a steel-wheeled roller is the specified application method. Should circumstances preclude the use of the inlay method, or the markings be scheduled for installation on PCC (Portland concrete cement) pavements, the contractor shall follow the manufacturer's installation instructions. As a minimum, the applicator used shall be equipped with rollers, or another suitable compaction device, to provide initial adhesion of the preformed, pressure-sensitive markings to the pavement surface. Additional hand-operated rollers shall be used as required to properly seal the preformed markings. Adhesives or glues shall also be used as applicable and as recommended by the manufacturer to achieve the desired results.

6.5 Traffic Controls:

Suitable warning signs shall be placed around the work site for alerting approaching traffic from both directions. Signs shall be professional looking. Place small markers along newly painted lines to control traffic and prevent damage to newly painted surfaces. Mark painting equipment with large warning signs indicating slow-moving painting equipment in operation. It is the contractor’s responsibility to coordinate with security forces prior to placing traffic cones or blocking traffic. The contractor shall provide and place all traffic cones or barriers when stripping or marking pavements. At no time shall the cones or barriers at any work site block more than half of the street block. The cones or barriers shall be placed to avoid traffic congestion and safety hazards. Upon completion of work and when the paint is completely dry, the contractor shall remove all cones, barriers, and markers.

SOW 15 of 33

SOW 16 of 33

6.6 Application:

6.6.1 Paint:

Protection for non-painted areas is the responsibility of the contractor. Adjacent areas shall be protected by the use of drop cloths or other approved measures. All over-spray is the responsibility of the contractor and shall be removed.

Paint shall be applied with approved equipment at rate of coverage recommended by the paint manufacturer. The contractor shall provide guidelines and templates as necessary to control paint application. Special precautions shall be taken when marking numbers, letters, and symbols. Edges of markings shall be sharply outlined. The maximum drying time requirements of the paint specifications shall be strictly enforced to prevent displacement or discoloration by tires of traffic. If there is a delay in drying of the markings, painting operations shall be discontinued until cause of the slow drying is determined and corrected. Paints used with reflecting media shall be the slow drying type to promote adherence of the reflective media.

6.6.1.1 Reflective Media:

Application of reflective media shall immediately follow application of pigmented binder. Drop-on application of glass spheres shall be accomplished to insure that reflective media is evenly distributed at the specified rate of coverage. Should there be malfunction of either paint applicator or reflective media dispenser, operations shall be discontinued immediately until deficiency is corrected. Reflective media shall be applied to all pavements stripping to include parking lots, crosswalks, stop bars, center and side dividers.

6.7 Preformed Markings

Application shall be according to current industry standards and in accordance with manufacturer’s instructions. See paragraph on Pre-formed Marking Application Equipment above.

6.8 Pressure Washing:

High pressure washing will be accomplished to maintain a clean appearance of all pavement tape markings.

The contractor will not be held responsible for any damages to markings caused by the pressure wash.

Water from the routine washing of pavement must be conducted without the use of detergents or other chemicals and where spills or leaks of toxic or hazardous materials have not occurred (unless all spilled material has been removed).

7 SIGN PROGRAM:

This work consists of painting, resurfacing, procuring, storing, ordering and issuing signs, which include lettering, stenciling, and limited graphics such as arrows, handicapped symbols, recycling symbol, “no” symbol (circle with line going through), women and men restroom symbols, and flammable/flames. The sign program shall follow Sheppard AFB Operating Instruction 32-1001, Standardization of SAFB Signs and street markings; and Unified Facilities Criteria, Standard, UFC 3-120-01.

7.1 Sign Structures and Specifications:

All…