Summary of Work Item 1: Hull Plating, U/W Body, Divers Clean and Inspect
This is a Performance Work Statement for underwater hull inspection and cleaning services for the USCGC Diligence (WMEC 616), a U.S. Coast Guard vessel. The contractor must provide certified diving personnel and equipment to clean and inspect the vessel's underwater body while moored pier side between September 8-11, 2026, at the vessel's location in Pensacola, Florida. The work encompasses cleaning and inspection of hull plating, underwater body coating systems, transducers, shafts, propellers, rudders, sea chests, strainers, appendages (bilge keels, rope guards, fairwater), and cathodic protection zinc anodes. No government-furnished property is provided; the contractor supplies all protective measures and diving equipment compliant with 29 CFR 1910.401-440 (Commercial Diving Operations). Mixed gas diving and live boating operations are prohibited.
The contractor must provide 24 hours advance notice of diving operations and coordinate with the Coast Guard Inspector and Contracting Officer's Representative (COR) regarding diving safety requirements and machinery shutdown procedures. All cleaning must preserve existing coating systems and non-coated surfaces without damage, while transducer surfaces are explicitly excluded from cleaning. Comprehensive inspection documentation is required, including fouling ratings (FR) and paint deterioration ratings (PDR) recorded on standardized forms (Pre-Clean Bio-fouling Inspection Data, Diver Hull Inspection Data, Running Gear Inspection Data, Propeller Inspection Data, and Port and Starboard Rudder Inspection Data). Additionally, the contractor must produce narrated audio-video documentation on two DVDs with underwater camera equipment meeting specified technical standards, submitted to the COR within 24 hours of inspection completion. The contact point is LT William Mulvey, Engineer Officer, at William.S.Mulvey@uscg.mil or 774-504-9420.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA-52000QR260027285.docx | DOCX document | |
| 27285 FAR CLAUSES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11000_CDG_0925_210
WORK ITEM 1: Hull Plating, U/W Body, Divers Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and conduct inspection of the vessel’s U/W body, while the vessel is moored pier side. Affected surfaces or components include, but are not limited to the following:
• U/W hull plating.
• U/W body coating system.
• Transducer(s)/sonar dome.
• Shaft(s).
• Propellers.
• Rudder(s).
• Sea chest(s) and strainer(s).
• Miscellaneous appendages (examples: bilge keels, rope guards, and fairwater)
• Hull and sea chest zinc anodes.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
DILIGENCE (WMEC 616): Coast Guard Drawing 618 WMEC 085-162, Rev G, Docking Plan
Coast Guard Drawing 618 WMEC 111-001, Rev G, Shell Expansion Framing & C.V.K.
Coast Guard Drawing 627 WMEC 562-003, Rev A, Rudder Construction NSN 2040-01-336-
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1910, Subpart T, 2024, Commercial Diving
Operations
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not Applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, (Interferences).
3.1.5 The Contractor must provide the Coast Guard Inspector 24 hours advance notice of when the diver inspection will occur. Before diving procedures commence, meet with the COR and the Coast Guard
Inspector, to discuss diving safety requirements and the securing of cutter machinery, as applicable.
NOTE
At Contractor’s request, Ship’s force will secure and tag out the cathodic protection system, main engines, steering gear, generator set, A/C unit, fire pumps, and all other machinery which may cause a hazard while a diver is in the water.
3.2 Pre-diving clearance. The Contractor must ensure that the diving team obtains clearance from the
Officer-of-the-Deck before beginning diving operations. Ensure the Coast Guard Inspector has the capability for maintaining continuous two-way communication with diving personnel at all times, during the performance of this work item.
3.2.1 The Contractor must, in accordance with 29 CFR 1910.401-440, provide a certified diver and a tender team, as well as necessary support personnel and equipment, to accomplish the tasks specified herein.
WARNING
Mixed gas diving and live boating are not permitted.
3.3 Cleaning requirements. Using the drawings listed in Section 2 (References), the Contractor must employ suitable means to clean the entire U/W body surfaces free of all marine growth, debris, and all other surface contaminants. The Contractor must ensure the following:
3.3.1 Do not clean transducer surfaces.
3.3.2 Ensure that existing U/W body coating system or non-coated surfaces do not incur any damage during cleaning process.
3.4 Inspection requirements - general. The Contractor must survey the entire U/W body of the vessel, to inspect for abnormal conditions or situations, which may include, but not be limited to the below-listed.
The Contractor must use the drawings listed in Section (References) for guidance and accomplish the following tasks.
• Hull plating and appendage damages.
• Coating system defects or failures.
• Welding corrosion and erosion.
• Deformation in appendages.
3.4.1 Hull plating. The Contractor must inspect the exterior condition of the hull for presence of marine growth, deformation, and any evidence of major corrosion or electrolytic action. Inspect for deformation along the stem and keel areas, condition of butt-welded seams, doubler plates, lap seams, and any signs of damaged plating or unusual waviness in the plating.
3.4.2 Coating system inspection. The Contractor must inspect the condition of the U/W body coating system, for signs of the following:
• Peeling.
• Blistering.
• Abrasion.
3.4.2.1 Use the guidelines provided in Table I (Paint Deterioration Ratings (PDR) for
Antifouling/Anticorrosion (AF/AC) Paint System) and Table 2 (Fouling Ratings (FR) In Order of
Increasing Severity) to assist in proper documentation of the coating system degradation and fouling rate, respectively.
TABLE 1 - PAINT DETERIORATION RATINGS (PDR)
FORANTIFOULING/ANTICORROSION (AF/AC) PAINT SYSTEM
PAINT
DETERIORATION
RATING (PDR)
DESCRIPTION
10 AF paint intact, red in color or with mottled pattern of light green and red.
20 AF paint missing from edges, corners, seams welds, river or boll head to expose AC paint.
30 AF paint missing from slightly curved or flat areas to expose AC paint.
40 AF paint missing from intact blisters to expose AC paint.
50 AF blisters ruptured to expose intact AC paint.
60 AF/AC paint missing or peeling to expose steel substrate, no corrosion present.
70 AF/AC paint removed from edges, corners, seams, welds, river or bolt heads to expose steel substrate with corrosion present.
80 Ruptured AF/AC blisters on slightly curved or flat surfaces with corrosion stains present.
90 Area corrosion of steel substrate with no AF/AC paint cover due to peeling or abrasion damage.
100 Area corrosion showing visible surface evidence of pitting, scaling, and roughening or steel substrate.
TABLE 2 - FOULING RATINGS (FR) IN ORDER OF INCREASING SEVERITY
TYPE FOULING
RATING
(FR)
DESCRIPTION
Soft 0 A clean, foul-free surface; red and/or black AF paint or a bare metal surface.
Soft 10 Light shades of red and green (incipient slime). Bare metal and painted surfaces are visible beneath the fouling.
Soft 20 Slime as dark green patches with yellow or brown colored areas (advanced slime).
Bare metal and painted surfaces may be obscured by the fouling.
Soft 30 Grass as filaments up to 3 inches (76 mm) in length, projections up to 1/4 inch (6.4
mm) in height; or a flat network of filaments, green, yellow, or brown in color; or soft non calcareous fouling such as sea cucumbers, sea grapes, or sea squirts projecting up to 1/4 inch (6.4 mm) in height. The fouling cannot be easily wiped off by hand.
Hard 40 Calcareous fouling in the form of tubeworms I less than ¼ inch in diameter or height.
Hard 50 Calcareous fouling in the form of barnacles less than ¼ inch in diameter or height.
Hard 60 Combination of tubeworms barnacles, less I than ¼ inch (6.4 mm) in diameter or height.
Hard 70 Combination of tubeworms and barnacles, greater than ¼ inch in diameter or height.
Hard 80 Tubeworms closely packed together and growing upright away from surface.
Barnacles growing one on top of another, ¼ inch or less in height. Calcareous shells appear clean or white in color.
Hard 90 Dense growth of tubeworms with barnacles, ¼ inch or greater in height; Calcareous shells brown in color (oysters and mussels); or with slime or grass overlay.
Composite 100 All forms of fouling present, Soft and Hard, particularly soft sedentary animals without calcareous covering (tunicates) growing over various forms of hard growth.
3.4.3 Sea chests and other hull penetrations. The Contractor must accomplish the following:
• Inspect all sea chests and other hull penetrations for signs of any obstructions/marine growth in the openings that might prevent proper suction and discharge of water.
• Inspect for bare metal areas (surrounding penetrations) and for bare metal pitting.
• Inspect for general appearance, loose, damaged, or missing grates, loose or missing fasteners, condition of sea strainers and lockwire on bolt.
3.4.4 Propeller and shaft associated components. The Contractor must inspect the condition of the propeller shafts, struts, fairwaters, and rope guards. Note any loose or missing fairwater or rope guard fasteners.
3.4.4.1 Inspect propellers for corrosion, pitting, erosion, fouling, cracks, dings, curls, and nicks by side and blade.
3.4.4.2 Inspect the condition of the struts, keel drain plugs, rudders, rudder stocks, and rudder bearings, including any damage, pitting on leading and trailing edges of the rudder, and the presence of drain plugs.
3.4.5 Transducers. The Contractor must inspect the general condition of the fathometer transducer.
Record condition of rubber coating and amount of marine growth present. Note in the inspection report any cuts, gouges, or other surface defects found.
3.4.6 Cathodic protection system. The Contractor must visually inspect all zinc anodes, check the soundness of mounting strap and stud welds, missing fasteners, and percentage of remaining material.
3.5 Inspection documentation. The Contractor must document the hull survey as follows:
3.5.1 Written report. The Contractor must record the U/W body coating system fouling rating on the attached “Pre-Clean Bio-fouling Inspection Data” Form.
3.5.1.1 Note all inspection findings and observations, as applicable, on attached observations on the following attached inspection data forms, as applicable, on the attached: “Diver Hull Inspection Data”
Form.
3.5.1.2 In addition to completing the ”Diver Hull Inspection Data” Form, do the following, as applicable:
• Document condition of running gear on attached “Running Gear Inspection Data” Form for each shaft.
• Document propeller condition on attached “Propeller Inspection Data” Form for each propeller.
• Document condition of rudders on attached “Port and Starboard Rudder Inspection Data”
Form.
3.5.2 Audio-video report. In addition to the written documentation specified above, The Contractor must produce an audio-video report, with narration, of all inspected surfaces. Place linear measuring devices, as applicable, in the field of view when videotaping hull damages, to provide scale for these damages.
3.5.3 Documentation submission. Within 24 hours after the completion of the diver inspection, The
Contractor must do the following:
3.5.3.1 Submit both the written and audio-video reports to the COR. Submit the audio-video report on two digital video discs (DVD) formatted to USCG requirements.
3.5.3.1.1 Ensure that all video equipment have the following characteristics/functions:
• Remote video/sound recorder.
• Suitability for underwater use.
• Auto-focus and auto-exposure.
• Color pictures.
• Two-way communication devices, to allow for communication and recording of communications between the diver operating the video camera and the Person-in-Charge, COR, and Coast Guard Inspector.
• Audio/visual cables long enough to transmit the video picture and two-way communications to the recorder and monitor.
• Online video monitor large enough, to allow the Person-in-Charge, the COR, and the Coast
Guard Inspector to observe the video picture.
• Sufficient lighting to ensure a quality color video picture and depth of field.
• A yardstick or other suitable linear measuring device with clear measurement marks which can be read from the monitor.
3.5.3.1.2 Closely monitor the video and sound quality during the survey, to ensure that the pictures on the monitor and the communication sounds remain of high quality. When either video or audio quality deteriorates, ensure that the survey is temporarily halted, until all problems have been corrected.
4. NOTES
4.1 Unit responsibilities. The ship's force will tag-out and secure the following:
• All propulsion machinery and shafting, including auxiliary propulsion machinery such as the bow thruster, and all steering machinery whenever the diver is in the water.
• All underwater body transducers, including the sonar equipment, for the duration of the underwater inspection operation.
• All active cathodic protection equipment for the duration of the underwater inspection operation.
• Each sea suction while the diver is inspecting the sea suction's sea chest strainer.
4.2 Mailing of video record. Upon receipt, the COR will forward the second copy of the underwater video inspection record to the Engineering Section of the Product Line Division to which the vessel is assigned.
4.3 Period of Performance. 08SEP26-11SEP26
4.4 Place of Performance. The primary place of performance will be CGC DILIGENCE located at below address:
USCGC Diligence
211 South Ave, Suite F
Pensacola, FL, 32508
4.5 Point of Contact. LT William Mulvey, Engineer Officer (EO). William.S.Mulvey@uscg.mil
774-504-9420.
TABLE 3. PRE-CLEAN BIOFOULING INSPECTION DATA
PRE-CLEAN BIOFOULING INSPECTION DATA
VESSEL NAME: HULL TYPE / NUMBER LOCATION (CITY) DATE (mm/dd/yy)
PRODUCT LINE: INSPECTING ACTIVITY VISIBILITY (ft)
LOCATION OF LAST DRYDOCKING UNDOCKING DATE
LOCATION OF LAST PAINTING DATE
PAINT
TYPE: ANTIFOULING: ANTICORROSION:
DATE OF THE LAST WATERBORNE FULL HULL CLEANING DATE OF THE LAST WATERBORNE INTERIM CLEANING
UNDERWATER PHOTOGRAPHS TAKEN □ YES □ NO VIDEO TAKEN □ YES □ NO
COMPONENTS
( CHECK IF: )
N/A NOT INSPECTED
( PERCENTAGES MUST ADD UP TO 100 )
FOULING RATING FOULING RATING FOULING RATING
PROPELLER Centerline FR- % FR- % FR- %
Port Outboard FR- % FR- % FR- %
Port Inboard FR- % FR- % FR- %
Starboard Inboard FR- % FR- % FR- %
Starboard Outboard FR- % FR- % FR- %
SHAFT Centerline FR- % FR- % FR- %
Port Outboard FR- % FR- % FR- %
Port Inboard FR- % FR- % FR- %
Starboard Inboard FR- % FR- % FR- %
Starboard Outboard FR- % FR- % FR- %
RUDDER Centerline FR- % FR- % FR- %
Port FR- % FR- % FR- %
Starboard FR- % FR- % FR- %
SONAR DOME Port Side FR- % FR- % FR- %
Starboard Side FR- % FR- % FR- %
SEA CHEST Typical FR- % FR- % FR- %
BOW Port FR- % FR- % FR- %
Starboard FR- % FR- % FR- %
SIDES Port FR- % FR- % FR- %
Starboard FR- % FR- % FR- %
BOTTOM Port FR- % FR- % FR- %
Starboard FR- % FR- % FR- %
STERN Port FR- % FR- % FR- %
Starboard FR- % FR- % FR- %
TRANSOM Port FR- % FR- % FR- %
Starboard FR- % FR- % FR- %
Signature (Ship’s Engineer):_______________________________________________________
Signature (Diving Supervisor):______________________________________________________
TABLE 4. DIVER HULL INSPECTION DATA
DIVER HULL INSPECTION DATA
VESSEL NAME: HULL TYPE / NUMBER LOCATION (CITY) DATE (mm/dd/yy)
PRODUCT LINE: INSPECTING ACTIVITY VISIBILITY (ft)
LOCATION OF LAST DRYDOCKING UNDOCKING DATE
LOCATION OF LAST PAINTING DATE
PAINT
TYPE: ANTIFOULING: ANTICORROSION:
DATE OF THE LAST WATERBORNE FULL HULL CLEANING DATE OF THE LAST WATERBORNE INTERIM CLEANING
UNDERWATER PHOTOGRAPHS TAKEN □ YES □ NO UNDERWATER COLOR VIDEO TAKEN □ YES □ NO
UNDERWATER WORK ACCOMPLISHED THIS DATE
□ FULL CLEAN □POLISH □MULTI-BRUSH □INSPECT □PAINT
□INTERIM □HYDRO □HAND-HELD □REPAIR □OTHER__________________________________
1. HULL COATING SYSTEM (PDR___________)
a. ANTIFOULING PAINT
PERCENTAGE REMAINING________________ PERCENT REJUVENATION________________
IS THE A/F □ HARD □ SOFT
PERCENTAGE __________ PEELING __________ LOCALIZED or __________ GENERAL
__________ BLISTERING __________ LOCALIZED or __________ GENERAL
__________ ABRASION __________ LOCALIZED or __________ GENERAL
CONDITION SUMMARY [ IF PAINT DAMAGE IS LOCALIZED, GIVE LOCATION(s) ]
b) ANTICORROSION PAINT
PERCENTAGE REMAINING _______________
PERCENTAGE __________ PEELING __________ LOCALIZED or __________ GENERAL
__________ BLISTERING __________ LOCALIZED or __________ GENERAL
__________ ABRASION __________ LOCALIZED or __________ GENERAL
c) DOCKING BLOCK AREAS (PDR _________)
AVERAGE PERCENTAGE OF BLOCK AREAS PAINTED ____________________ %
BARE METAL PITTING ____________________ % __________________ IN. DIAMETER ____________________ IN. DEEP
TABLE 5. DIVER HULL INSPECTION DATA (CONT.)
DIVER HULL INSPECTION DATA (CONTINUED)
2. CATHODIC PROTECTION SYSTEM
a. SACRIFICIAL ANODES (ZINCS)
AVERAGE PERCENTAGES OF ANODES REMANING ____________________ %
ANODES ARE: □ UNIFORMLY WASTED □ WASTAGE GREATEST IN FOLLOWING AREAS:
ANODES ARE : □ WELDED □ BOLTED □ BOTH
NUMBER AND LOCATION OF ANY ANODES MISSING OR INACTIVE:
MISSING___________________________________________________
INACTIVE__________________________________________________
b. IMPRESSED CURRENT
□ DAMAGE NOTED ON ATTACHED DRAWING (Port/Stbd) (FRAME ____________________ )
□ WIRES LOOSE, BROKEN, OR MISSING (Port/Stbd) (FRAME ____________________ )
□ CAPASTIC SHIELD DAMAGE (Port/Stbd) (FRAME ____________________ )
□ INSULATORS LOOSE OR DAMAGED (Port/Stbd) (FRAME ____________________ )
□ OTHER (Port/Stbd) (FRAME ____________________ )
3. GENERAL HULL DAMAGE (HULL PLATING, BILGE KEELS, etc.):
4. HULL PENETRATIONS (PDR _________)
_______________ % CLOGGED WITH MARINE GROWTH (POST CLEAN)
_______________ % BARE METAL (AREA SURROUNDING PENETRATION)
_______________ % BARE METAL PITTING
AVERAGE PIT SIZE: _______________ in. DIAMETER, _______________ in. DEPTH
CONDITION SUMMARY: ___________________________________________________
TABLE 6. DIVER HULL INSPECTION DATA (CONT.)
DIVER HULL INSPECTION DATA (CONTINUED)
5. SONAR DOME
□ NO VISIBLE DAMAGE □ DAMAGE NOTED ON ATTACHED DRAWING □ CUTS □ LAYER SEPARATION □ WIRE PILES EXPOSED
6. PROPULSION SHAFTING
VISIBLE BARE METAL □ YES □ NO RUST BLEEDING □ YES □ NO PITTING □ YES □ NO
CONDITION SUMMARY (TYPE OF DAMAGE, LOCATION AND SIZE):
7. STRUTS AND BEARING HOUSING
PERCENT BARE METAL: STARBOARD PORT
MAIN _________________________ % ___________________ %
INTERMEDIATE _________________________ % ___________________ %
PDR _________________________ ___________________
CONDITION OF STRUT LEADING AND TRAILING EDGES: ______________________________________
CONDITION OF ROPE GUARDS: __________________________________________________
CONDITION OF FAIRWATERS: ___________________________________________________
8. RUDDER
□ NO DAMAGE □ DAMAGE SHOWN ON ATTACHED DRAWINGS
STARBOARD PORT
PERCENT BARE METAL % %
PDR
ACCESS PLATES INTACT? □ YES □ NO □ YES □ NO
WAS RUDDER SOUNDED? □ YES □ NO □ YES □ NO
ANY SIGNS OF FLOODING? □ YES □ NO □ YES □ NO
ANY SIGNS OF DROPPING? □ YES □ NO □ YES □ NO
CONDITION SUMMARY:
9. PROPELLERS
□ NO DAMAGE □ DAMAGE SHOWN ON ATTACHED DRAWINGS
PROP #1: NICKS __________ CURLS __________ CRACKS – LARGEST CRACK LENGTH __________ in.
PROP #2: NICKS __________ CURLS __________ CRACKS – LARGEST CRACK LENGTH __________ in.
PROP #3: NICKS __________ CURLS __________ CRACKS – LARGEST CRACK LENGTH __________ in.
PROP #4: NICKS __________ CURLS __________ CRACKS – LARGEST CRACK LENGTH __________ in.
PROPELLERS NUMBERED STARBOARD TO PORT.
Diving Supervisor: ___________________________________________ Ship’s Engineer: _________________________________
FIGURE 1. PROPELLER INSPECTION DATA
FIGURE 2. STARBOARD RUNNING GEAR INSPECTION
FIGURE 3. PORT AND STARBOARD RUDDER INSPECTION