SOW PR 26-00169.pdf

PDF 134 KB Posted

Attached to
F-16 Aircraft Ejection Seat
Solicitation number
SPRWA1-26-Q-0020
Issued by

About this file

This is a Statement of Work (SOW) for the procurement of F-16 Forward (FWD) Ejection Seats, dated May 5, 2026. The procurement is for the Advanced Concept Ejection Seat (ACES) II model, Part Number J114936-547, National Stock Number (NSN) 1680-01-473-8222MH, under Purchase Request (PR) FD2060-26-00169. The Government seeks to procure 2 units over a 1-year period.

The F-16 Ejection Seat is a third-generation, zero-zero capability system capable of ejecting pilots from zero-zero conditions up to maximum altitudes and airspeeds in the 600 KEAS range. This particular seat version is a shell configuration that does not include accessories, pyrotechnics, or certain functional components such as the shoulder reel, automatic deployment unit, and parachute pack; customers can order a Time Compliance Technical Order (TCTO) Kit to build the required configuration. The seat is classified as a Critical Safety Item (CSI) and is Military Unique.

The Contractor must manufacture each ejection seat to meet Original Equipment Manufacturer (OEM) specifications and provide the stated Key Performance Parameters (KPPs) and capabilities. The Contractor is responsible for all transportation costs for moving equipment to and from locations for testing and demonstration purposes. Quality verification shall utilize the Quality Deficiency Report (QDR) process. A Counterfeit Prevention Plan is not required as the ejection seat contains no electronic parts. The Contractor must achieve and maintain Cybersecurity Maturity Model Certification (CMMC) Level 2 and comply with NIST SP 800-171 security requirements for handling Controlled Unclassified Information (CUI) and Covered Defense Information (CDI). If awarded with a Plan of Action and Milestones (POA&M), the Contractor must achieve full compliance and obtain CMMC certification within 180 days of contract award. The prime Contractor must ensure all subcontractors and suppliers at all tiers handling Federal Contract Information or CUI achieve and maintain the requisite CMMC level prior to subcontract award and continuously monitor compliance throughout contract performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5 May 2026

STATEMENT OF WORK

for

NSN 1680-01-473-8222MH

PN: P/N J114936-547

F16 FWD Ejection Seat

PR FD2060-26-00169

1.0 SCOPE:

This Statement of Work (SOW) defines tasks, support, and technical requirements for the procurement of the F16 Ejection Seat, Part Number (P/N) J114936-547. The seat is mounted in the F16 Fighting Falcon that uses the Collins Aerospace ACES II zero-zero capability.

The current projected quantity is 2ea ejection seats over a 1-year period.

1.1 Background/Requirements:

The F-16 Ejection Seat is part of the Advanced Concept Ejection Seat (ACES) II suite used in the Fighting Falcon. This ejection seat is a third generation seat capable of ejecting a pilot from zero-zero conditions up to a maximum altitude and air speeds in the 600 KEAS range. This particular seat version is essentially a shell; meaning it does not include accessories the pyrotechnics or a number of functional components such as the shoulder reel, automatic deployment unit, parachute pack, etc. The customer is able to order a TCTO (Time Compliance Technical Order) Kit in order to "build" the configuration needed for mission support. This part is Military Unique and is classified as Critical Safety Items (CSI).

2.0 Manufacturing and Testing Requirements:

2.1 Manufacture:

The contractor shall manufacture each ejection seat to meet OEM specifications and provide Key Performance Parameters (KPPs) and capabilities of the as stated in section 1.0.

3.0 TRANSPORTATION and TRANSPORTABILITY:

The contractor shall be responsible for the transportation and costs incurred to move all equipment to/from and between locations for testing and/or demonstration purposes. Notifying the responsible transportation officer when assistance is required in arranging for Government transportation support where existing commercial transportation capability is inadequate or when delivery of system/equipment cannot be accomplished.

4.0 QUALITY ASSURANCES PROVISIONS:

This item shall be verified utilizing the Quality Deficiency Report (QDR) process.

5.0 COUNTERFEIT PREVENTION PLAN (CPP):

Counterfeit Prevention Plan is not required for this procurement effort. The ejection seat does not contain any electronic parts.

5.1 Safeguarding Information and Cybersecurity Maturity Model Certification (CMMC):

In accordance with DFARS 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, the Contractor shall implement the security requirements specified by National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171. To validate ongoing compliance, the Contractor shall achieve and maintain a Level 2 Cybersecurity Maturity Model Certification (CMMC) Self-Assessment recorded in the Supplier Performance Risk System (SPRS) for all contractor information systems processing Controlled Unclassified Information (CUI) or Covered Defense Information (CDI) in accordance with DFARS 252.204- 7021.

If the contract is awarded based on an approved Plan of Action and Milestones (POA&M), the POA&M must only include controls eligible for delayed implementation in accordance with current DoW CIO CMMC policy. The Contractor shall resolve all POA&M items, achieve full compliance, and obtain the requisite CMMC certification no later than 180 days after contract award. Failure to close out the POA&M within this 180-day period may result in contractual remedies.

5.1.1 Controlled Unclassified Information Identification and Handling:

The Government will identify all CUI provided to the Contractor or generated by the Contractor during performance. To understand the categories, subcategories, and safeguarding requirements of CUI, the Contractor shall refer to the National Archives and Records Administration CUI Registry (https://www.archives.gov/cui) and the Department's CUI Registry (https://www.dodcui.mil/). The Contractor shall ensure all CUI is explicitly marked in accordance with DoDI 5200.48, Controlled Unclassified Information. The Contractor shall not process, store, or transmit CUI on personally owned devices or unapproved public cloud environments. Upon contract completion or termination, the Contractor shall return or destroy all CUI as directed by the Contracting Officer.

5.1.2 Cyber Incident Reporting Coordination:

In addition to the mandatory cyber incident reporting requirements to the Government outlined in DFARS 252.204-7012, the Contractor shall simultaneously notify the Contracting Officer and the Contracting Officer’s Representative of any cyber incident involving covered contractor information systems or Covered Defense Information related to this contract. This notification shall occur within the same 72-hour window.

https://www.archives.gov/cui https://www.dodcui.mil/

5.1.3 Subcontractor Cybersecurity Compliance:

The prime Contractor shall ensure that all subcontractors and suppliers at all tiers handling Federal Contract Information or CUI achieve and maintain the requisite CMMC level prior to awarding the subcontract. The Contractor shall continuously monitor subcontractor NIST scores and CMMC compliance throughout the life of the contract and provide verification of subcontractor compliance to the CO or COR upon request.

Updated Services Summary Recommendation

Performance Objective

SOW Reference Performance Threshold

Method of Surveillance

CMMC Compliance 5.1 100% Compliance;

100% of non-implemented security controls from the pre-award POA&M are resolved, and the required CMMC certification is recorded in SPRS within 180 days of award.

100% Inspection via SPRS verification