SOW Pier Waterline Shore Connection.pdf
PDF 209 KB Posted
- Solicitation number
- 31090PR260000365
About this file
This is a Statement of Work (SOW) for the replacement of pier waterline shore connections for Berths 1, 2, and 3 on Coast Guard Island, Alameda, California. The project involves the complete removal and replacement of six potable water shore connections (two double connection systems at each of three cutter berths) that have reached the end of their serviceable life due to severe corrosion, leakage, or mechanical failure. The contractor must provide all labor, materials, equipment, supervision, and quality control necessary to execute this work.
The scope encompasses demolition and removal of existing infrastructure downstream of designated tie-in connection points, installation of new piping, fittings, isolation valves, a marine-grade reduced pressure zone (RPZ) backflow prevention assembly, potable water meter, and final shore connection point compatible with vessel intake fittings. All materials must be certified for potable water use, with preferred options including High-Density Polyethylene, Type 316 Stainless Steel, or marine-grade ductile iron; all hardware must be Type 316 Stainless Steel. The contractor must perform hydrostatic pressure testing at 150 percent of maximum operating pressure for a minimum two hours, flush and disinfect the system per AWWA standards, conduct bacteriological testing, and certify all backflow preventers. Work shall be completed within 120 days of award with only one berth operational at any time. Required deliverables include a written schedule before notice to proceed, hydrostatic test reports, bacteriological water test results, backflow preventer certification, and as-built drawings. Work hours are 0700 to 1600 Monday through Friday, excluding Federal Holidays, unless written approval is obtained. Contractor personnel must comply with base security requirements, including Real ID-compliant identification, access request submission 72 hours in advance, and adherence to vehicle regulations. All operations must comply with U.S. Coast Guard Safety and Environmental Health Manual COMDTINST M5100.47, OSHA regulations, and AWWA standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW Appendix Waterline Shore Connection Photos.pdf | ||
| BASE ACCESS FORM.xlsx | XLSX spreadsheet | |
| Waterline Shore-tie Solicitation.pdf | ||
| Coast Guard Island Map_Waterline Shore-tie Connection Repair Site Visit.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Replacement of Pier Waterline Shore Connection for Berths 1, 2 and 3 on Coast Guard Island, Alameda, CA
1. Introduction/Background
The existing potable water shore connection assembly at the pier has reached the end of its serviceable life, exhibiting signs of severe corrosion, leakage, or mechanical failure. A complete replacement is required to ensure a safe, reliable, and sanitary water supply for Coast Guard operations.
2. Objective
The objective of this project is to remove the existing, degraded waterline shore connection on the pier and install a new, fully operational, and compliant potable water shore connection. This infrastructure supports direct water transfer to moored vessels and must withstand the marine environment.
3. Scope of Work
The Contractor shall provide all labor, materials, equipment, supervision, and quality control necessary to execute the replacement of six (6) potable water shore connections. There are two double connection systems at each of the three cutter berths at the pier (see attached photo). Contractor is responsible for removing and replacing everything downstream of the designated tie in connection, conducting appropriate sanitation and testing per industry standards and certifying all new backflow preventers. Contractor is responsible for verifying all measurements and dimensions onsite.
3.1. Demolition and Removal
3.1.1. Isolate and secure the existing water supply line at the nearest upstream shut-off valve. Ensure Coast Guard POC is notified.
3.1.2. Disconnect and remove the existing shore connection assembly, including valves, flanges, meters, backflow preventers, and associated piping up to the pipe flanges supplying the service vaults which will be the designated tie-in points (see attached photo).
3.1.3. Properly dispose of all removed materials off-site in accordance with local and environmental regulations.
3.2. Installation of New Shore Connection
3.2.1. Inspect the existing tie-in point for integrity and prepare the surface/flange for the new connection.
3.2.2. Install new piping, fittings, and isolation valves from the tie-in point to the new shore connection.
3.2.3. Install a new marine-grade, reduced pressure zone (RPZ) backflow prevention assembly.
3.2.4. Install a new potable water meter (if present to facility specifications).
3.2.5. Install the final shore connection point (e.g., cam-lock fitting, flanged connection, or standard threaded fire hose connection as specified by the facility), ensuring it is compatible with vessel intake fittings.
3.2.6. Apply marine-grade protective coatings to all exposed, non-stainless metal surfaces to prevent corrosion.
3.2.7. Install appropriate pipe supports, hangers, or brackets to secure the new assembly to the pier structure, accounting for vibration and tidal movements if applicable.
3.3. Testing and Commissioning
3.3.1. Perform hydrostatic pressure testing of the newly installed assembly to 150% of the maximum operating pressure for a minimum of two hours to ensure zero leakage.
3.3.2. Flush the new system with potable water to remove any debris or contaminants.
3.3.3. Disinfect the new assembly in accordance with AWWA (American
Water Works Association) standards for potable water systems.
3.3.4. Conduct bacteriological testing; the system shall not be placed into service until a negative/passing test result is achieved.
3.3.5. Certify each newly installed backflow preventer.
3.3.6. Function-test all valves and backflow preventer.
4. Material Requirements
4.1. Piping and Fittings: All materials must be certified for potable water use.
High-Density Polyethylene (HOPE), Type 316 Stainless Steel, or approved marine-grade ductile iron are preferred to resist saltwater corrosion.
4.2. Valves: Bronze or stainless-steel body, suited for marine environments.
4.3. Backflow Preventer: ASSE-approved, marine-environment suitable Reduced
Pressure Zone (RPZ) assembly.
4.4. Hardware: All bolts, nuts, and mounting hardware shall be Type 316
Stainless Steel.
5. Safety and Environmental Compliance
5.1. Environmental: The Contractor shall ensure no construction debris, tools, or hazardous materials (e.g., pipe joint compound, paint) are dropped into the water. A spill containment kit shall always be on-site.
5.2. Hot Work: If welding or cutting is required, a Hot Work permit must be obtained from the Facility Safety Officer or Fire Marshal.
5.3. Water outages: Prior to taking any water source offline contractor is requested to get permission via the Coast Guard POC at least 72 hours in advance.
6. Deliverables
6.1. Schedule: Contractor shall provide the Coast Guard a written schedule before being granted notice to proceed. The work shall be phased so that only one berth is taken down at a time. Work shall be phased to minimize down time of each cutter berth. The contractor shall work with the Coast Guard POC to determine best phase of work to least interrupt cutter schedule.
6.2. Closeout: Hydrostatic test reports, bacteriological water test results, backflow preventer certification, and as-built drawings or updated schematics of the new connection.
7. Period of Performance
7.1. All work shall be completed within 120 days of award.
7.2. Contractor may only take one berth down at a time.
8. Laydown and Material Storage
The Coast Guard POC will coordinate an appropriate amount of storage space as necessary for equipment and material storage during the project. The contractor is responsible for maintaining the security of this space and their equipment. This space shall be always kept tidy.
9. Codes and Standards
9.1. All work shall comply with the most current editions of all applicable federal, state, and local codes, all applicable industry standards, and the following USCG-specific standards:
9.1.1. U.S. Coast Guard Safety and Environmental Health Manual, COMDTINST M5100.47 (series).
9.1.2. OSHA Regulations
9.1.3. American Water Works Association (AWWA) Standards for potable water connections.
10. Personnel Security and Base Access
10.1. Access Request: For access to the USCG facility, the contractor is required to submit the name and birthdate for each employee on the approved access request form at least 72 hours before their first day on site (this form will be provided after awarded). Personnel not listed may be denied access to the Coast Guard facility.
10.2. Identification: A Real ID-compliant driver's license, or other federally approved identification is required for base access. Acceptable forms of ID include US Government Dependent ID, Federal PIV Card, TWIC Card, Veterans Health Identification Card, US Passport or Permanent Resident Card. Driver's licenses from states that are not Real ID compliant will not be accepted.
10.3. Vehicle Requirements: All contractor vehicles must have valid registration and insurance, and all vehicle operators must have a valid driver's license.
Vehicles shall always stay on marked and paved roads -vehicles are not permitted to drive or park on the grass at any point in this project performance without written approval from the Coast Guard. Any damage from driving or parking on the grass, to include the sprinkler system, shall be the responsibility of the contractor to repair.
10.4. Conduct: Contractor personnel shall adhere to all base regulations, traffic laws, and security protocols. Contractors must wear company identifying clothing/badging/safety gear, and all contractor vehicles must display company or subcontractor decals.
11. Work Hours
Work shall be performed between the hours of 0700 to 1600, Monday through Friday, excluding Federal Holidays, unless otherwise approved in writing by the
Contracting Officer or USCG POC.
12. Safety and Environmental Protection
All operations must comply with the USCG Safety and Environmental Health Manual, COMDTINST M5100.47 (series). The contractor is responsible for proper handling and disposal of any hazardous materials and for immediately reporting and containing any spills.
13. Government Furnished Services
The Government may provide potable water and electrical power at no cost to the contractor where available. All electrical connections shall be in accordance with the National Electric Code. The contractor shall provide and use ground fault circuit interrupter (GFCI) devises when connecting to Government power sources.
14. Acceptance Criteria
Final acceptance of the work will be granted by the USCG COR after final inspection confirms that all tasks in this WOE have been completed, the installation meets all technical and safety standards, and the sire has been fully restored. Final payment will not be released until all deficient items have been corrected.
15. Coast Guard Technical Point of Contact
15.1. Primary POC for this task is: CWO Dave Mann
15.2. Secondary POC for this task is: DCCS Eric Allen