SOW PICTURES.pdf

PDF 522 KB Posted

Attached to
Shipboard Habitability Work Federal contract opportunity
Solicitation number
N0040621Q0256
Issued by
Department of the Navy Naval Supply Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Shipboard Habitability Work, newest first.
File Type Posted
N0040621Q0256.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USS SAMPSON (DDG 102) Habitability Project

1. Contractor shall replace drop ceiling where required.

2. Contractor shall install wall paper for entire Wardroom.

3. Due to inability to find matching deck covering once partition is removed. Contractor shall remove current deck covering and install new deck covering for the entire space.

4. Contractor shall fabricate and install a sectional couch (J-shaped) in place of the old couches and book case. Couch shall be welded in place.

5. Contractor shall install an aluminum box to cover the installed VTC components that are located behind the partition.

6. Contractor shall provide and install brass strip after book case and partition have been removed.

7. Contractor shall remove end table that is similar to the one displayed, located AFT of the long couch, and fabricate and install new table closer to the display case.

8. Contractor shall provide and install a TV wall mount on the bulk head behind the partition.

9. Contractor shall remove items that are welded to the deck.

10. To save some money. Ship’s force will remove the partition, book case and brown couches.

1. Contractor shall fabricate a new aluminum panel that will contain boxes similar to this for our

SIPR and NIPR hard drives.

2. Arrow pointing to the deck covering that shall be removed and replace by contractor.

File details come from the government source that posted it. Updated .