SOW Perimeter Fence 3-24-23 Final.docx
DOCX document 9 MB Posted
- Solicitation number
- 36C10D23R0006
- Issued by
-
Department of Veterans Affairs
About this file
This pre-solicitation notice provides details for an upcoming solicitation seeking a contractor to install a perimeter fence at the St. Petersburg VA Regional Office. The project scope involves removing and constructing a fence around Buildings 46 and 47 to secure the area underneath. The solicitation is expected to be issued on June 15, 2023 for offers due within 30 days. The estimated value is between $500,000 and $1,000,000. The government will award a single firm-fixed price contract and consider price and past performance in determining best value. The acquisition has been set aside for SDVOSBs registered in VetCert. The NAICS code is 236220 and small business size standard is $39.5M. The period of performance is anticipated to be 180 days from notice to proceed. Offerors must have an active SAM registration. The point of contact is provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10D23R0006.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ST PETERSBURG VA REGIONAL OFFICE
9500 BAY PINES BLVD
ST PETERSBURG, FL
STATEMENT OF WORK (SOW)
Installation of Perimeter Fence St Petersburg VA Regional Office 03/15/2023
1 Introduction This project involves the construction of a perimeter fence around the St Petersburg VA Regional Office (VARO), 9500 Bay Pines BLVD, Bay Pines, FL 33744. Purpose of the project is to secure the underside of BLD 46 to BLD 47 of the VA Regional Office
1.1 Scope
The perimeter fence and pedestrian gates shall be installed around buildings 46 & 47, enclosing parking spaces underneath the north and south side of building 46 and the entirety of building 47. The redesigned fence shall include pedestrian gates for through traffic. The height of the perimeter fence shall be floor to ceiling in height. Fence shall be installed in accordance with Miami Dade and federal guidelines to withstand hurricane force winds.
2 General Requirements This section describes the general requirements for this effort. The following sub-sections provide details of various considerations.
2.1 Non-Personal Services
The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to or prepare work schedules for individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Contracting Officer (CO) immediately.
2.2 Business Relations
The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction, professional, and ethical behavior of all contractor personnel. Contractor will ensure daily/weekly communication with the COR.
2.3 Contract Administration and Management
The following subsections specify requirements for contract, management, and personnel administration.
2.4 Subcontract Management
The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the Contracting Officer (CO) or Contracting Officer Representative (COR). The Prime General Contractor, whom this contract is awarded to is responsible for coordinating all training and badging requirements of the subcontractor to include subcontractor employees.
2.5 Location and Hours of Work
Accomplishment of the results contained in this SOW requires work at the St Petersburg VA Regional Office, 9500 Bay Pines Blvd., Bay Pines, FL 33744. Normal workdays for the contractor will be Monday through Friday except US Federal Holidays from 6:00pm until 6:00 am. The contractor may work on Saturday and/or Sundays with prior coordination with the Contracting Officer Representative (COR). The contractor will provide the COR a Work Breakdown Structure showing the work schedule. The preferred format for the WBS is MS Project.
3 Requirements The following section specifies the Performance Objectives and Performance Elements for the contract.
3.1 Construction Activities.
Contractor will perform the following activities Standard:
Addresses all errors and inadequacies AQL: All issues are resolved with the COR within 48hrs
3.1.2 Remove existing vinyl fencing.
Contractor will remove approximately 500 linear feet of existing vinyl fence to include all mountings fixtures and poles.
Standard:
Remove existing vinyl fence along with all mounting fixtures, poles, and patch screw holes in columns and concrete to match existing color.
AQL: 100% of all holes patched.
3.1.3 Shop Drawings
A. Prior to submitting shop drawings for approval, Contractor shall certify in writing that manufacturers of all major items of equipment have each reviewed contract documents and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installation.
B. Submittals and shop drawings for interdependent items, containing applicable descriptive information, shall be furnished together. Coordinate and properly integrate materials and equipment to provide a completely compatible and efficient installation.
G. Samples will not be required, except for where materials offered differ from specification requirements. Samples shall be accompanied by full description of characteristics different from specification. The Government, at the Governments expense, will perform evaluation and testing if necessary. The Contractor may submit samples of additional material at the Contractor's option; however, if additional samples of materials are submitted later, pursuant to Government request, adjustment in contract price and time will be made.
Repair damaged equipment in first class, new operating condition and appearance; or, replace same as determined and directed by the COR. Such repair or replacement shall be at no additional cost or time to the Government.
AS-BUILT DOCUMENTATION
A. Submit manufacturers literature and data updated to include submittal review comments and any equipment substitutions.
B. Submit operation and maintenance data updated to include submittal review comments, VA approved substitutions and construction revisions shall be in electronic version on CD or DVD. The operations and maintenance manual shall include troubleshooting techniques and procedures for emergency situations. Notes on all special systems or devices shall be included. A List of recommended spare parts (manufacturer, model number, and quantity) shall be furnished. Information explaining any special knowledge or tools the owner will be required to employ shall be inserted into the As-Built documentation.
C. The installing Contractor shall maintain as-built drawings of each completed phase for verification; and shall provide the complete set at the time of final systems certification testing. Should the installing Contractor engage the testing company/contractor to provide as built or any portion thereof, it shall not be deemed a conflict of interest or breach of the third party testing company requirement. Provide record drawings as follows:
D. As-built drawings are to be provided, with a copy of them on AutoCAD version as well as provided on CD or DVD. The CAD drawings shall use multiple line layers with a separate individual layer for each system.
DELIVERY, STORAGE AND HANDLING
A. Protection of Equipment:
1. Equipment and material placed on the job site shall remain in the custody of the Contractor, whether or not the Government has reimbursed the Contractor for the equipment and material. The Contractor is solely responsible for the protection of such equipment and material against any damage or theft.
2. Large equipment such as fencing material and post if shipped on open trailer trucks shall be covered with shrink on plastics or waterproof tarpaulins that provide protection from exposure to rain, road salts and other transit hazards. Protection shall be kept in place until equipment is installed as designed.
FACTORY-ASSEMBLED PRODUCTS
A. Provide maximum standardization of components to reduce spare part requirements.
B. Performance and warranty of all components that make up an assembled unit shall be the responsibility of the manufacturer of the completed assembly.
1. All components of an assembled unit need not be products of same manufacturer.
2. Constituent parts that are alike shall be products of a single manufacturer.
3. Components shall be compatible with each other and with the total assembly for intended service.
4. Contractor shall guarantee performance of assemblies of components and shall repair or replace elements of the assemblies as required to deliver specified performance of the complete assembly.
C. Equipment and components of equipment shall bear manufacturer's name and trademark, model number, serial number and performance data on a nameplate securely affixed in a conspicuous place, or cast integral with, stamped or otherwise permanently marked upon the components of the equipment.
WARRANTY
A. All work performed, and all equipment and material furnished under this Division shall be free from defects and shall remain so for a period of one year from the date of acceptance of the entire installation by the Contracting Officer for the Government.
4 Special Requirements This section describes the special requirements for this contract. The following sub-sections provide details of various considerations on this effort.
4.1 Security
SECURITY - The Contractor is required to enter and exit the St Petersburg VARO through the front entrance. Entering or exiting the building through any other door will require VARO approval and an escort will be required. Upon entering the building, the contractor and/or contractor employees will be required to show proof of identity (must have a valid photo ID) as well as pass through a security screening.
4.1.1 Badging and Identification
Homeland Security Presidential Directive (HSPD) -12 directs all federal agencies and departments to issue identity credentials to provide government workers, contractors, and affiliates with a credential that provides the attributes of security, authentication, trust, and privacy and can be used to verify identities to enter federal buildings or gain access to federal computer networks.
4.2 Safety
SAFETY - The Contractor shall comply with all applicable Federal, State and local legal requirements regarding workers health and safety. The requirements include but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities and shall ensure safe and healthful working conditions for its employees. Contractor shall comply with all applicable codes, laws, rules, regulations, and safety requirements. Erect safety barriers, signs, flagging, and devices as appropriate to warn and protect the workmen and the public. Protect the existing site and other property. Remove all demolished materials, debris, waste and scraps. The waste materials will be disposed of in accordance with the environmental guidelines and standards of Florida. No construction materials to include packaging materials will be left on site.
RISK ASSESSMENT - The Contractor will ensure an overall risk assessment for this project is completed and submitted to the COR within 10 days of the NTP. Whenever there is an additional trade or change of function, i.e., use of a crane or sky lift an additional risk assessment will be performed for that event.
Equipment - The Contractor shall provide all safety equipment/devices, MSDS, personal protective equipment and clothing as required for its employees. Copies of all MSDS shall be provided to the COR.
OSHA - Prior to commencing work the Contractor shall provide proof that an OSHA designated "competent person (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are not present. The Contractor as well as the on-site supervisor will have completed no less than 30 hours of OSHA approved safety training. All other Contractor employees will have no less than 10 hours of OSHA approved safety training.
Safety Plan Contractor will provide a site specific safety plan as well as an Activity Hazards Analysis. An example of a VA approved AHA can be found at https://ors.od.nih.gov/sr/dohs/Documents/Activity%20Hazard%20Analysis.pdf
4.2.1 Mishaps
Mishap Notification and Investigation: The contractor and its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government personnel and to cooperate in any resulting safety investigation. The contractor shall notify (via telephone) the contracting officer’s representative, and/or contracting officer within four (4) hours of all mishaps or incidents If the Government investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the Government personnel until the investigation is completed.
4.3 Government Furnished Materials
The government shall provide at no cost parking space and access to the VARO loading docks as necessary. Government will also provide outside staging area near the loading dock. Government will provide a location for the contractor to position a construction waste receptacle.
4.4 Environmental Requirements
Non-Hazardous waste disposal Demolition - The Construction Contractor shall provide all demolition, removal and legal disposal of materials. The Construction Contractor shall ensure that facilities used for recycling, reuse and disposal shall be permitted for the intended use to the extent required by local, state, federal regulations.
Disposal vendors - The Whole Building Design Guide website http://www.cwm.wbdg.org provides a Construction Waste Management Database that contains information on companies that haul, collect, and process recyclable debris from construction projects.
Hazardous waste disposal Abatement - In order to provide for abatement and control of all environmentally hazardous materials arising from demolition and/or construction activities, the Construction Contractor shall comply with all applicable environmentally hazardous material control and abatement and all applicable provisions of the Corps of Engineers Manual EM 385-1-1, "General Safety Requirements as well as the specific requirements stated elsewhere in the Contract Documents. EM 385-1-1 can be found at https://www.usace.army.mil/Missions/Safety-and-Occupational-Health/Safety-and-Health-Requirements-Manual/ Manifesto - The Construction Contractor shall provide a waste manifesto for all hazardous waste disposals.
The contractor shall comply with all documents listed below as mandatory and referenced under paragraph 3.0, Performance Requirements. Compliance with documents listed as non mandatory is the contractors' option.
Mandatory compliance
29 CFR 1926
Corps of Engineers Manual EM 385-1-1, "General Safety Requirements as well as the specific requirements stated elsewhere in the Contract Documents. EM 385-1-1 can be found at https://www.usace.army.mil/Missions/Safety-and-Occupational-Health/Safety-and-Health-Requirements-Manual/
29 CFR 1926.20
4.5 Applicable Directives
The contractor shall comply with all documents listed below as mandatory and referenced under paragraph 3.0, Performance Requirements. Compliance with documents listed as non-mandatory is the contractors' option.
Mandatory compliance (list) Corps of Engineers Manual EM 385-1-1, "General Safety Requirements as well as the specific requirements stated elsewhere in the Contract Documents. EM 385-1-1 can be found at http://federalconstruction.phslegal.com/uploads/file/EM-385-1-1_2008.pdf.
29 CFR 1926.20
Activity Hazards Analysis - AHA example found at https://ors.od.nih.gov/sr/dohs/Documents/Activity%20Hazard%20Analysis.pdf
4.6.1 COR Quality Assurance Plan
The Government shall monitor the Contractors performance under this Project in accordance with the COR’s Quality Assurance Plan.
100% Drawings provided by A&E Firm image1.emf
QASP - Perimeter Fence.doc
Contracting Officers Representative (COR) Quality Assurance Plan
3/14/2023
Contracting Officers Representative (COR) Quality Assurance Plan
1 Purpose
This Contracting Officers Representative (COR) Quality Assurance Plan is a government-developed document used to determine if the contractor's performance meets the performance standards contained in the contract. This QA Plan establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:
What will be monitored
How monitoring will take place
Who will be conduct the monitoring
How monitoring efforts and results will be documented
The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QA Plan provides the structure for the government's surveillance of the contractor's performance to assure that it meets contract standards. It is the government's responsibility to be objective, fair and consistent in evaluating contractor performance.
The QA Plan is not part of the contract, nor is it intended to duplicate the contractor's quality control plan. This QA Plan is a living document. Flexibility in the QA Plan is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
The government may provide a copy of the QA Plan to the contractor to facilitate open communication. In addition, the QA Plan should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor.
Bottom line, the QA Plan should ensure early identification and resolution of performance issues to minimize impact on mission performance.
2 Authority
Authority for issuance of this QA Plan is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provide for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative.
3 Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
3.1 Project Manager
The Project Manager (PM) provides primary program oversight for the government for this project. While the PM may serve as a direct conduit to provide Government guidance and feedback to the Contractor on technical matters, they are not empowered to make any contractual commitments or any contract changes on the government's behalf.
Assigned PM: Danny Wert
Organization or Agency: St Petersburg VA Regional Office
9500 Bay Pines Blvd
Bay Pines, FL 337448
Telephone: (727) 319-5800 x 77988
Email: danny.wert@va.gov
3.2 Contracting Office (CO)
The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine and document the final assessment of the contractor's performance in the governments past performance tracking system.
Assigned CO:
Organization or Agency:
Telephone:
Email:
3.3 Contracting Officer's Representative (COR)
The COR is responsible for providing continuous technical oversight of the contractor's performance. The COR uses the QA Plan to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor's actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the CO. The COR is required to provide an annual performance assessment to the CO which will be used in documenting past performance. The QA Plan is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government's behalf.
COR: Danny Wert
Organization or Agency: St Petersburg VA Regional Office
Bay Pines, FL 33744
Telephone: (727) 319-5800 x 77988
Email: danny.wert@va.gov
3.4 Other Key Government Personnel
This may include performance monitors, inspectors, technical experts, or others who provide information that helps the COR monitor contractor performance.
Name: William Perry
Organization or Agency: St Petersburg Va Regional Office
Bay Pines, FL 33744
Telephone: (727) 319-5800 ext 76596
3.5 Contractor Representatives
The following employees of the contractor serve as the contractor's Site Supervisor for this contract. (Complete this section after the contract award)
Site Supervisor - <upon award, enter name>
Telephone: <enter number>
Email: <enter address>
Task Manager - <upon award, enter name>
Other Key Contract Personnel - <upon award, enter name or delete these lines if not applicable>
Title: <enter title>
4 Performance Requirements and Method of Surveillance
This section describes the special requirements for this effort. The following sub-sections provide details of various considerations on this effort.
4.1 Contract Surveillance
The goal of the QA Plan is to ensure that contractor performance is effectively monitored and documented. The COR's contribution is their professional, non-adversarial relationships with the CO, PM and the contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QA Plan to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor's performance. Additionally, this QA Plan is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.
4.2 Surveillance Matrix
The Surveillance Matrix (Attachment 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QA Plan, to determine the quality of the contractor's performance as it relates to the performance element standards. The PRS should be used to form the foundation of the COR's inspection checklist.
In evaluating the quality of contractor’s performance, the following performance ratings may be used.
Performance
Rating
Criteria
Excellent / Outstanding
Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
Very Good
Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective.
Satisfactory
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Appendix 1 - Surveillance Matrix
Statements
Standards/AQLs
Inspections
Ratings
3.1 Pre-construction activities.
Deliverables:
A001 Privacy and VA Information Assurance Training A002 OSHA training A003 VA Forms OE 344 and 0711 A004 Schedule / Work Breakdown Structure
a) Compliant with federal, state, and local laws and regulations AQL: 100% of employees have completed VA Privacy and Information Assurance training; submit VA Form 20-0344 (attached) and VA Form 0711 (attached); and have acquired a Non-PIV badge prior performance of this SOW / Contract.
What: Training certificates, and completed VA Forms 0334 and
VA Form 0711.
How: Physical inspection
Frequency: Once - prior beginning of work
Who: COR
Incentive: There are no incentives offered to complete this job early.
Deficiencies will be identified and remedied by the Corrective Action Plan (CAP). See the QA Plan
Failure to comply with the CAP may constitute filing a Customer Complaint Record or performance Assessment
Report (PAR in the CO performance file
Standard(s): Inspection applies to all standards
Statements
Standards/AQLs
Inspections
Ratings
3.2 Post Construction Activities.
a) Addresses all errors and inadequacies AQL: All issues are resolved with the COR within 48hrs
What: All construction activities
Frequency: Randomly
Who: COR
Standard(s): Inspection applies to all standards
3.2.1 Conduct punch list activities.
Deliverables:
A002 Punch list
a) Identifies and corrects deficiencies AQL: 100% of all deficiencies corrected by the contractor
What: Deficiencies identified as result of joint inspection by the Contractor and COR
Frequency: After completion of project
Who: COR, Contractor, Industrial Hygienist
Incentive: There are no incentives offered to complete this job early.
Deficiencies will be identified and remedied by the
Corrective Action Plan (CAP).
See the QA Plan
Failure to comply with the
CAP may constitute filing a Customer Complaint Record
Standard(s): Inspection applies to all standards
Appendix 2 - Corrective Action Report (CAR)
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY FORMCHECKBOX
MAJOR FORMCHECKBOX
MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
FORMCHECKBOX
ACCEPTED FORMCHECKBOX
REJECTED
12. CLOSE DATE
Appendix 3 - Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Appendix 4 - Performance Assessment Report (PAR)
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACT/TASK ORDER NUMBER
2. CONTRACTOR
3. TYPE OF SERVICES
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
5. COR PHONE
6. SUSPENSE DATE
I. PERFORMANCE
7. FORMCHECKBOX
DEFICIENCY (CHECK ALL BOXES THAT APPLY)
NEW
REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE FORMCHECKBOX
CONCUR FORMCHECKBOX
NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. FORMCHECKBOX
CONCUR FORMCHECKBOX
NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
image2.emf
St. Petersburg Security Fence 100 combined drawings 4.9.21 final set.pdf
DRAWING LIST
X
1i
0 GRID / COLUMN LINE
DESIGNATOR
EQUIPMENT NUMBER
DOOR TAG
Ga5xFB1
WALL TYPE
WINDOW TYPE
ROOM NAME
101 ROOM NAME /
NUMBER
REVISION TAG
PLAN NORTH
NORTH ARROW WITH
TRUE NORTH INDICATION
EGRESS ROUTE ID
AND SECTION
LENGTH
ROOM
ROOM OCCUPANCY
150 SF
EGRESS : EGRESS ID
Egress Length
ROOM OCCUPANCY &
AREA
ELEVATION NUMBER
SECTION
INTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
Name Elevation FLOOR LEVEL &
NAME
PLATE NUMBER WHERE
SECTION/DETAIL IS
DRAWN
SHEET KEYNOTE
A101
SIM
EXTERIOR ELEVATION
A-101
INDEX OF DRAWINGS
DISCIPLINE:
G - GENERAL
C - CIVIL
L - LANDSCAPE
S - STRUCTURAL
A - ARCHITECTURE
P - PLUMBING
M - MECHANICAL
E - ELECTRICAL
T - TELECOM
Q - FOOD SERVICE
SHEET TYPE
DESIGNATOR
VICINITY MAP
PROJECT TEAMBUILDING SUMMARY
PROJECT INFORMATION
ANNOTATION DRAWING SYMBOLSGENERAL NOTES
PROJECT NAME: A&E DESIGN FOR SECURITY FENCE AT THE ST PETERSBURG VARO
PROJECT NUMBER: VB3237
PROJECT LOCATION: ST. PETERSBURG REGIONAL OFFICES
9500 BAY PINES BOULEVARD
ST. PETERSBURG, FL 33708
PROJECT PURPOSE/USE: DESIGN FOR SECURITY FENCE
1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION. THESE DRAWINGS ARE A COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE SEPARATED FOR DISTRIBUTION. THE GC SHALL REVIEW ALL DRAWINGS AND PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.
2. THE GC SHALL VISIT THE SITE TO INSPECT EXISTING CONDITIONS AND VERIFY WORK BEING PERFORMED
BEFORE SUBMITTING COST QUOTATIONS FOR WORK.
3. NOTIFY THE ARCHITECT PROMPTLY OF ANY ERRORS, OMISSIONS, INCONSISTENCIES, DISCREPANCIES AND CONFLICTS WITHIN THE CONTRACT DOCUMENTS AND ITS ASSOCIATED FIELD/PROJECT CONDITIONS SO THAT
A RESOLUTION CAN BE PROVIDED PRIOR TO CONTINUING WITH WORK.
4. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE ARCHITECT
5. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL, STATE AND LOCAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS AS MANDATED BY THE OWNER, THE ARCHITECT, AND THE AUTHORITIES HAVING JURISDICTION. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS AND CERTIFICATES AND SHALL FURNISH COPIES OF
PERMITS, INSPECTIONS, AND CERTIFICATES TO THE OWNER.
6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO EXISTING-TO-REMAIN CONSTRUCTION OR EQUIPMENT SHALL BE RESTORED TO
ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
7. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE ON A DAILY BASIS.
8. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE ARCHITECT IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS PROVEN TO BE ADVANTAGEOUS
TO THE OWNER WITH RESPECT TO DELIVERY DATE, QUALITY, OR COST.
9. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE ARCHITECT DOES NOT ASSUME ANY RESPONSIBILITY
FOR THE CONTRACTOR'S MEANS AND METHODS OR FOR TEMPORARY STRUCTURES.
10. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE
CONTRACTOR SHALL EMPLOY ENGINEERING EXPERTISE AS NEEDED TO ASSIST IN DEMOLITION.
11. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH LOCAL FIRE AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY
RESPONSIBLE FOR MEETING OSHA REGULATIONS DURING CONSTRUCTION.
12. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT
THE GENERAL CONTRACTOR'S EXPENSE.
SHEET NUMBER
WITHIN SERIES
AE101
PURPOSE
NOT USED
NUMBER
Romanyk Consulting Focusing on what matters
0' 1'
6" 3"
Gr ap hi c S ca le
: 1 /2"
1'-
0"
4"
8"
2'
: 3 /32
-0
8' Gr
/16
8'
4' Gr
/8"
4'
/4"
1' Gr
VA FORM 08 - 6231
F
E
D
C
B
A
910 7 6 5 4 3 2 1
8910 7 6 5 4 3 2 1
U.S. Department of Veterans Affairs
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Spinklered
Office of Construction and Facilities Management FULLY SPRINKLERED
BI
M
VB
- S t.
Pe te rs bu rg
S ec ur ity en ce /S t P et er sb g
Se cu rit y
Fe nc e
- V
.rv t 4/
6/
:5 4:
PROJECT NUMBER - VB3237
RCC OBLIGATION NUMBER - 36C10E18D019
RCC TASK ORDER NUMBER - 36C10E20N0198
A&E Design for Security Fence at the St. Petersburg VARO
100% CD
APRIL 09, 2021
BW TG
VB3237
46, 47
GI100ST. PETERSBURG, FL
SHEET INDEX & GENERAL INFORMATION 100% CD A&E Design for Security Fence at the St. Petersburg VARO
STRUCTURAL ENGINEER:
IMEG - St. Louis Branch 15 Sunnen Drive, Suite 104 St. Louis, MO 63143
Kurtis Minton kurtis.w.minton@imegcorp.com
314-279-9917
OWNER:
Department of Veterans Affairs St. Petersburg Regional Office 9500 Bay Pines Boulevard St. Petersburg, FL 33708
Danny Wert, VBASPT Danny.Wert@va.gov
727-319-7988
SHEET # SHEET TITLE
GENERAL
GI100 SHEET INDEX & GENERAL INFORMATION
GI101 LIFE SAFETY PLAN
STRUCTURAL
S-100 GENERAL NOTES AND DETAILS
S-101 SITE PLAN AND TYPICAL DETAILS
S-102 DETAILS
S-103 DETAILS
ARCHITECTURAL
AS100 SITE ORIENTATION PLAN
AD100 DEMOLITION PLAN - SECTION A
AD101 DEMOLITION PLAN - SECTION B
AD102 DEMOLITION PLAN - SECTION C
AD103 DEMOLITION PLAN - SECTION D
AE100 SECURITY FENCE PLANS - SECTION A
AE101 SECURITY FENCE PLANS - SECTION B
AE102 SECURITY FENCE PLANS - SECTION C
AE103 SECURITY FENCE PLANS - SECTION D
AE200 SECURITY FENCE ELEVATIONS
AE201 SECURITY FENCE ELEVATIONS
AE400 GATE DETAILS
AE401 GATE DETAILS
AE402 GATE DETAILS
AE403 SECURITY FENCE DETAILS
ELECTRICAL
E100 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ED100 LIGHTING & POWER DEMOLITION - SECTION A
ED101 LIGHTING & POWER DEMOLITION - SECTION C
ED102 LIGHTING & POWER DEMOLITION - SECTION D
ES100 ELECTRICAL SITE PLAN -DEMO
ES101 ELECTRICAL SITE PLAN
EL100 LIGHTING PLAN - SECTION A
EL101 LIGHTING PLAN - SECTION B
EL102 LIGHTING PLAN - SECTION C
EL103 LIGHTING PLAN - SECTION D
EP100 POWER AND SYSTEMS PLAN - SECTION A
EP101 POWER AND SYSTEMS PLAN - SECTION B
EP102 POWER AND SYSTEMS PLAN - SECTION C
EP103 POWER AND SYSTEMS PLAN - SECTION D
E-401 ENLARGED ELECTRICAL POWER PLANS
E-402 ENLARGED ELECTRICAL POWER PLANS
E-403 ENLARGED ELECTRICAL POWER PLANS
E-601 ELECTRICAL DETAILS AND SCHEDULES
Grand total: 39
ARCHITECT:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas
Barrett Webb barrett.webb@romanykconsulting.com
855-424-3838 ext 318
ELECTRICAL ENGINEER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Jonathan Foster jonathan.foster@romanykconsulting.com
855-424-3838 ext 307
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02Revisions: Date:
EA
ST
G
AT
UP
LEGEND
EAST GATE DRIVE
EXISTING
EXISTIN
G
EXISTIN
EX
IS
TI
N
EX
TI
TRAVEL DISTANCE= 145'-9"
TRAVEL
DISTANCE= 80
'-6
TRAVEL DISTANCE= 207'-5"
TRAVEL D
ISTANCE= 1
'-5
TRAVEL DISTANCE= 153'-6"
TRAVEL DISTANCE= 115'-0"
TRAVEL DISTANCE= 125'- 6"
TRAVEL D
ISTANCE= 1
'- 6"
MAXIMUM TRAVEL DISTANCEX'-X"
EGRESS DIRECTIONAL ARROW
TRAVEL DISTANCE START CIRCLE
TRAVEL PATH
ILLUMINATED EXIT SIGN
Management
NORTH
FULLY SPRINKLERED
4:
GI101ST. PETERSBURG, FL
LIFE SAFETY PLAN 100% CD A&E Design for Security Fence at the
1" = 30'-0"1 LIFE SAFETY PLAN
www.imegcorp.com # 17002665.02
0' 15' 30' 60'
Graphic Scale : 1" = 30'-0"
Revisions: Date:
1. NEITHER THE PROFESSIONAL ACTIVITIES OF THE ENGINEER, NOR THE PRESENCE OF THE
ENGINEER OR THEIR EMPLOYEES AND SUBCONSULTANTS AT THE CONSTRUCTION SITE,
SHALL RELIEVE THE CONTRACTOR AND ANY OTHER ENTITY OF THEIR OBLIGATIONS,
DUTIES AND RESPONSIBILITIES INCLUDING BUT NOT LIMITED TO, CONSTRUCTION MEANS,
METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES NECESSARY FOR PERFORMING,
SUPERINTENDING OR COORDINATING ALL PORTIONS OF THE CONSTRUCTION WORK IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS AND ANY HEALTH OR SAFETY
PRECAUTIONS REQUIRED BY ANY REGULATORY AGENCIES. THE ENGINEER AND THEIR
PERSONNEL HAVE NO AUTHORITY TO EXERCISE ANY CONTROL OVER ANY
CONSTRUCTION CONTRACTOR OR OTHER ENTITY OR THEIR EMPLOYEES IN CONNECTION
WITH THEIR WORK OR ANY HEALTH OR SAFETY PRECAUTIONS. THE CONTRACTOR IS
SOLELY RESPONSIBLE FOR THE JOBSITE SAFETY. THE ENGINEER AND THE ENGINEER’S
CONSULTANTS SHALL BE MADE ADDITIONAL INSUREDS UNDER THE CONTRACTOR’S
GENERAL LIABILITY INSURANCE POLICY.
2. ALL DRAWINGS ARE CONSIDERED TO BE A PART OF THE CONTRACT DOCUMENTS. THE
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND COORDINATION
OF ALL DRAWINGS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES SHALL
BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO THE START OF
CONSTRUCTION SO A CLARIFICATION CAN BE ISSUED. ANY WORK PERFORMED IN
CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY CODE REQUIREMENTS SHALL BE
CORRECTED BY THE CONTRACTOR AT THEIR OWN EXPENSE AND AT NO EXPENSE TO THE
OWNER OR ARCHITECT.
3. ALL DIMENSIONS AND SITE CONDITIONS SHALL BE VERIFIED BY THE CONTRACTOR AT THE
JOBSITE PRIOR TO CONSTRUCTION, START OF SHOP DRAWINGS, START OF
CONSTRUCTION, AND/OR FABRICATION OF MATERIALS. IF DISCREPANCIES ARE
ENCOUNTERED, OR CONDITIONS DEVELOP THAT ARE NOT COVERED BY THE CONTRACT
DOCUMENTS, THE ARCHITECT SHALL BE NOTIFIED FOR CLARIFICATION.
4. CONTRACTOR SHALL PROVIDE AND BE RESPONSIBLE FOR THE PROTECTION AND REPAIR
OF ADJACENT EXISTING SURFACES AND AREAS WHICH MAY BE DAMAGED AS A RESULT
OF NEW WORK.
5. STRUCTURAL DRAWINGS INCLUDE DESIGN REQUIREMENTS AND DIMENSIONS FOR
STRUCTURAL INTEGRITY BUT DO NOT SHOW ALL DETAIL DIMENSIONS TO FIT INTRICATE
ARCHITECTURAL AND MECHANICAL DETAILS. CONTRACTOR SHALL SO CONSTRUCT THE
WORK SO IT WILL CONFORM TO THE CLEARANCES REQUIRED BY ARCHITECTURAL,
MECHANICAL AND ELECTRICAL DESIGN.
6. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED TO BE
CONSTRUCTION STANDARDS. IF CLARIFICATION IS REQUIRED, THE CONTRACTOR SHALL
NOTIFY THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE DRAWINGS. PRINTED DIMENSIONS HAVE PRECEDENCE OVER SCALED
DRAWINGS AND LARGE-SCALE OVER SMALL-SCALE DRAWINGS. CONTRACTOR TO
DETERMINE FINAL DIMENSION WITH ARCHITECT.
8. TYPICAL DETAILS SHALL APPLY TO SITUATIONS OCCURRING ON THE PROJECT THAT ARE
THE SAME OR SIMILAR TO THOSE SPECIFICALLY REFERENCED. WHERE NO DETAILS ARE
GIVEN, CONSTRUCTION SHALL BE AS SHOWN FOR SIMILAR WORK.
9. THE CONTRACT DOCUMENTS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT
INDICATE THE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL
MEASURES NECESSARY TO PROTECT THE STRUCTURE AND SAFETY OF WORKMEN
DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO,
BRACING AND SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC.
OBSERVATION VISITS TO THE SITE BY THE ARCHITECT OR STRUCTURAL ENGINEER SHALL
NOT INCLUDE INSPECTION OR APPROVAL OF THE ABOVE ITEMS AND DOES NOT IN ANY
WAY RELIEVE THE CONTRACTOR OF THEIR RESPONSIBILITIES FOR THE ABOVE.
10. SEE ARCHITECTURAL, ELECTRICAL AND MECHANICAL DRAWINGS FOR DETAILS,
CONDITIONS, PITS, TRENCHES, PADS, DEPRESSIONS, ROOF/FLOOR OPENINGS, STAIRS,
SLEEVES, ITEMS TO BE EMBEDDED OR ATTACHED TO STRUCTURAL ELEMENTS, ETC., NOT
SHOWN ON THE STRUCTURAL DRAWINGS.
11. ESTABLISH AND VERIFY ALL OPENINGS AND INSERTS FOR MECHANICAL, ELECTRICAL AND
PLUMBING WITH APPROPRIATE TRADE CONTRACTORS. OPENING SIZES AND LOCATIONS
SHOWN FOR DUCTS, PIPE, INSERTS AND OTHER PENETRATIONS WHEN SHOWN ARE FOR
GENERAL INFORMATION ONLY AND SHALL BE VERIFIED PRIOR TO FORMING.
12. NO HOLES, NOTCHES, BLOCKOUTS, ETC. ARE ALLOWED IN STRUCTURAL ELEMENTS
UNLESS SPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS OR APPROVED BY THE
STRUCTURAL ENGINEER.
13. BEFORE SUBMITTING A PROPOSAL FOR THIS WORK, EACH BIDDER SHALL VISIT THE
PREMISES AND BECOME FULLY ACQUAINTED WITH THE EXISTING CONDITIONS,
TEMPORARY CONSTRUCTION REQUIRED, QUANTITIES AND TYPE OF EQUIPMENT, ETC. THE
BID SHALL INCLUDE ALL SUMS REQUIRED TO DO THE WORK WITHIN THE EXISTING
CONDITIONS.
14. SHOP DRAWINGS SHALL BE REVIEWED AND COORDINATED PRIOR TO SUBMITTING TO THE
ARCHITECT. EACH SHOP DRAWING SUBMITTED SHALL BE STAMPED INDICATING REVIEW
BY THE CONSTRUCTION MANAGER/GENERAL CONTRACTOR AND REVIEW BY THE
ARCHITECT SHALL NOT BEGIN UNTIL THIS IS COMPLETE. WORK SHALL NOT BEGIN
WITHOUT REVIEW BY THE ARCHITECT/STRUCTURAL ENGINEER.
15. SHOP DRAWINGS SHALL BE REVIEWED BY THE ARCHITECT/STRUCTURAL ENGINEER FOR
GENERAL CONFORMANCE WITH DESIGN CONCEPT ONLY. NOTATIONS MADE BY THE
ARCHITECT/STRUCTURAL ENGINEER ON THE SHOP DRAWINGS DO NOT RELIEVE THE
CONTRACTOR FROM COMPLYING WITH THE REQUIREMENTS OF THE DRAWINGS.
16. ELEVATIONS ARE BASED ON THE TOP OF SLAB ON GRADE ELEVATION OF (+0' - 0").
17. EXISTING CONDITIONS:
A. EXISTING STRUCTURAL INFORMATION SHOWN WAS OBTAINED FROM EXISTING
BUILDING 46 DRAWINGS DATED SEPTEMBER 15, 1994 BY TILDEN, LOBNITZ, & COOPER,
INC. EXISTING BUILDING 47 DRAWINGS DATED MAY 19, 2006 BY MASTER CONSULTING
ENGINEERS, INC.
B. EXISTING STRUCTURAL INFORMATION SHOWN WAS OBTAINED FROM FIELD TAKE-OFF
BY IMEG AS PERMITTED BY ACCESS RESTRICTIONS DURING DESIGN.
C. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS
GIVEN AS THE BEST PRESENT KNOWLEDGE. CONTRACTOR TO VERIFY EXISTING
INFORMATION, DIMENSIONS AND SIZES AS REQUIRED TO COMPLETE THEIR WORK.
WHERE ACTUAL CONDITIONS CONFLICT WITH THE DRAWINGS, THEY SHALL BE
REPORTED TO THE ARCHITECT OR STRUCTURAL ENGINEER SO PROPER
CLARIFICATION MAY BE MADE. MODIFICATION OF CONSTRUCTION DETAILS SHALL NOT
BE MADE WITHOUT WRITTEN APPROVAL OF THE ARCHITECT OR STRUCTURAL
ENGINEER.
GENERAL
DEMOLITION
1. ALL DEMOLITION SHALL BE CARRIED OUT IN SUCH A WAY AS TO NOT DAMAGE
EXISTING ELEMENTS WHICH ARE TO REMAIN.
2. ALL ELEMENTS WHICH ARE TO REMAIN AND WHICH ARE DAMAGED DURING
DEMOLITION WORK SHALL BE REPLACED AT NO ADDED COST. EXISTING
ELEMENTS ARE TO BE PROTECTED TO THE FULLEST EXTENT POSSIBLE TO
REDUCE SUCH DAMAGE TO A MINIMUM.
1. STRUCTURE HAS BEEN DESIGNED TO COMPLY WITH:
FLORIDA BUILDING CODE 2020
ASCE/SEI 7- 16
ACI 318- 14
AWS D1.1
2. WIND:
RISK CATEGORY III (BUILDING 46 & 47 ARE "LIFE SAFETY")
BASIC WIND SPEED 154 MPH
IMPORTANCE FACTOR 1.0
EXPOSURE CLASS C
DESIGN WIND PRESSURE 55 PSF
(CH. 29 - SOLID FREESTANDING
WALL PROCEDURE)
DESIGN CRITERIA AND LOADS
1. FOUNDATION DESIGN IS BASED ON THE GEOTECHNICAL REPORT DATED NOVEMBER 6, 2020 BY TERRACON
CONSULTANTS, INC. REPORT IS ON FILE WITH THE ARCHITECT.
2. SOIL PROPERTIES PER THE GEOTECHNICAL REPORT:
ALLOWABLE NET SOIL BEARING PRESSURE:
FOOTINGS 2000 PSF
DEPTH TO ALLOWABLE
SOIL BEARING 1'-6" FT BELOW EXISTING GRADE
EQUIVALENT FLUID PRESSURE 50 PCF
LATERAL BEARING PRESSURE 150 PSF/FT, SEE FLORIDA BUILDING CODE 1806.2
COEFFICIENT OF FRICTION 0.4
3. ALL EXCAVATIONS SHALL BE PROPERLY AND SAFELY BACKFILLED. DO NOT PLACE BACKFILL BEHIND RETAINING/BASEMENT WALLS BEFORE CONCRETE HAS ATTAINED SPECIFIED COMPRESSIVE STRENGTH.
CONTRACTOR SHALL BRACE OR PROTECT ALL WALLS BELOW GRADE FROM LATERAL LOADS UNTIL
SUPPORTING FLOORS ARE COMPLETELY IN PLACE AND HAVE ATTAINED 7-DAY STRENGTH MINIMUM.
BACKFILLING IS NOT PERMITTED FOR FOUNDATION WALLS UNTIL SUPPORTED SLAB TOP AND BOTTOM IS IN PLACE OR THE WALL IS ADEQUATELY BRACED TO RESIST LATERAL LOADS. CONTRACTOR SHALL PROVIDE
FOR DESIGN, PERMITS, AND INSTALLATION OR SHORING AND/OR SHEETING.
4. CONTRACTOR SHALL PROVIDE FOR DE-WATERING OF EXCAVATIONS FROM SURFACE WATER, GROUND WATER OR SEEPAGE. FREE GROUND WATER WAS NOT ENCOUNTERED IN THE BORINGS. DETAILS OF GROUND WATER INFORMATION CAN BE OBTAINED FROM THE ABOVE MENTIONED GEOTECHNICAL REPORT.
IF GROUND WATER SHOULD OCCUR DURING EXCAVATION, SPECIAL PROCEDURES SHALL BE IMPLEMENTED
AS RECOMMENDED BY THE GEOTECHNICAL ENGINEER OF RECORD.
5. CONTRACTOR SHALL INVESTIGATE SITE DURING CLEARING AND EARTHWORK OPERATIONS FOR FILL MATERIAL OR BURIED STRUCTURES SUCH AS CESSPOOLS, CISTERNS AND FOUNDATIONS. IF ANY SUCH MATERIAL OR STRUCTURES ARE FOUND, ARCHITECT SHALL BE NOTIFIED IMMEDIATELY. ALL ABANDONED FOOTINGS, UTILITIES AND OTHER STRUCTURES THAT INTERFERE WITH NEW CONSTRUCTION SHALL BE
REMOVED.
6. EXTREME CARE SHALL BE EXERCISED WHEN EXCAVATING OR GRADING ADJACENT TO EXISTING
STRUCTURES OR IMPROVEMENTS TO NOT DAMAGE OR UNDERMINE FOUNDATIONS, WALLS, SLABS,
UTILITIES, ETC.
7. ALL FOOTINGS SHALL BE PLACED ONTO FIRM UNDISTURBED SOIL OR CONTROLLED COMPACTED FILL, REMOVING ANY EXISTING FILL OR UNSUITABLE SOILS, AS RECOMMENDED BY THE GEOTECHNICAL REPORT.
EXCAVATIONS FOR FOOTINGS SHALL BE INSPECTED AND APPROVED BY THE INSPECTION AGENCY PRIOR TO PLACING CONCRETE. CONTRACTOR SHALL NOTIFY INSPECTION AGENCY WHEN EXCAVATION IS READY
FOR TESTING. INSPECTION AGENCY TO SUBMIT LETTER OF COMPLIANCE TO THE OWNER.
8. FOOTING ELEVATIONS SHOWN DESIGNATE A MINIMUM DEPTH WHERE AN ADEQUATE SOIL BEARING PRESSURE IS EXPECTED. FOOTINGS, PIERS AND/OR WALLS SHALL BE LOWERED OR EXTENDED AS
REQUIRED TO REACH SOIL MEETING THE DESIGN BEARING PRESSURE.
9. THE MOISTURE CONTENT OF ONSITE CLAYEY SOILS AT THE TIME OF COMPACTION SHALL BE BETWEEN 2-3%
ABOVE OPTIMUM MOISTURE CONTENT.
10. ANY IMPORT FILL SOIL REQUIRED SHALL HAVE A LOW POTENTIAL FOR EXPANSION AND SHALL BE
APPROVED BY THE GEOTECHNICAL ENGINEER OF RECORD PRIOR TO IMPORTING.
11. ALL UNACCEPTABLE MATERIAL AND ORGANIC MATERIAL SHALL BE REMOVED FROM BELOW ALL PROPOSED SLABS-ON-GRADE. THE EXPOSED NATURAL SOIL SHALL BE PROOF-ROLLED AND THE COMPACTION VERIFIED BY AN INSPECTION AGENCY PRIOR TO PLACING FILL. AREAS EXHIBITING WEAKNESS SHALL BE
REMOVED AND REPLACED BY ACCEPTABLE COMPACTED FILL.
12. ALL SITE WORK SHALL BE PERFORMED UNDER THE INSPECTION OF THE SPECIAL INSPECTION AGENCY.
VARIATIONS IN SITE CONDITIONS AND THE GEOTECHNICAL REPORT SHALL BE REPORTED TO THE
ARCHITECT/STRUCTURAL ENGINEER FOR CLARIFICATIONS PRIOR TO PROCEEDING.
EARTHWORK
REINFORCING STEEL
1. ALL REINFORCING STEEL SHALL BE DETAILED AND PLACED IN CONFORMANCE WITH THE AMERICAN CONCRETE INSTITUTE “ACI DETAILING MANUAL” (SP-066) EXCEPT AS OTHERWISE SHOWN, NOTED OR
SPECIFIED.
2. CONCRETE REINFORCING STEEL SHALL BE HIGH STRENGTH NEW BILLET STEEL CONFORMING TO THE
FOLLOWING STANDARDS:
DEFORMED BARS ASTM A615, GR60 Fy = 60 KSI EPOXY-COATED BARS ASTM A775 Fy = 60 KSI
3. MINIMUM CONCRETE COVER SHALL BE PROVIDED AS FOLLOWS TO THE OUTERMOST REINFORCING BARS:
CAST AGAINST AND PERMANENTLY IN CONTACT WITH GROUND 3"
EXPOSED TO WEATHER OR IN CONTACT WITH GROUND
#6 BARS OR LARGER 2"
#5 BARS OR SMALLER 1 1/2"
4. BAR SPLICES SHALL BE PROVIDED WHERE INDICATED ON THE DRAWINGS. ALL SPLICES SHALL BE CLASS 'B' AS DEFINED IN ACI 318. IF SPLICE LENGTH IS NOT GIVEN ON THE DRAWINGS, PROVIDE LAP LENGTH (IN
INCHES) AS FOLLOWS:
LAP LENGTHS ASSUME CLEAR SPACING BETWEEN BARS OF 2 BAR DIAMETERS, AND A MINIMUM COVER OF 1 BAR DIAMETER. FOR DEVELOPMENT LENGTHS, DIVIDE BY 1.3. TOP BARS ARE DEFINED AS HORIZONTAL BARS
WITH MORE THAN 1'-0" OF FRESH CONCRETE BELOW.
5. PROVIDE ADEQUATE TIES FOR ALL REINFORCING BARS AND STIRRUPS IN CONCRETE SLABS AND BEAMS.
ANCHOR BOLTS, DOWELS, REINFORCING STEEL, INSERTS, ETC., SHALL BE SECURELY TIED IN PLACE PRIOR TO POURING CONCRETE. CONCRETE BLOCKS SHALL ONLY BE USED TO SUPPORT REINFORCING OFF
GRADE.
6. SUPPORTS FOR REINFORCEMENT SHALL HAVE CLASS 2 PROTECTION AS DEFINED IN THE CRSI MANUAL OF
STANDARD PRACTICE, UNO.
7. CONTINUOUS REINFORCING SHALL BE LAPPED AT MIDSPAN FOR TOP BARS AND DIRECTLY OVER THE
SUPPORT FOR BOTTOM BARS.
8. DOWELS BETWEEN FOOTINGS AND WALLS OR COLUMNS SHALL BE THE SAME GRADE, SIZE AND SPACING
OR NUMBER AS THE VERTICAL REINFORCING, RESPECTIVELY, UNO.
9. REINFORCING IN CONTINUOUS FOOTINGS BETWEEN FENCE POSTS SHALL EXTEND INTO POST
FOUNDATIONS A MINIMUM OF 2 FEET.
10. REINFORCING IN FOOTINGS SHALL BE ACCURATELY PLACED, SPACED, SUPPORTED AND SECURED BEFORE
PLACING CONCRETE.
11. CUTTING OF REINFORCING WHICH CONFLICTS WITH EMBEDDED OBJECTS IS NOT ACCEPTABLE.
12. REINFORCING BARS SHALL BE BENT COLD, AND NO METHOD OF FABRICATION SHALL BE USED WHICH WOULD BE INJURIOUS TO THE MATERIAL. HEATING OF BARS FOR BENDING IS NOT PERMITTED.
13. FIELD WELDING OR BENDING OF REINFORCING IS NOT PERMITTED EXCEPT AS INDICATED ON THE
DRAWINGS OR AS APPROVED BY THE STRUCTURAL ENGINEER.
14. SUBMIT SHOP DRAWINGS FOR FABRICATION AND PLACEMENT OF REINFORCING STEEL. INCLUDE SCHEDULES AND DIAGRAMS OF BENT BARS AND SHOW ARRANGEMENT OF REINFORCEMENT. STRUCTURAL ENGINEER’S REVIEW WILL BE FOR COMPLIANCE WITH DESIGN REQUIREMENTS. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR VERIFYING DIMENSIONS AND QUANTITIES.
CAST-IN-PLACE CONCRETE
1. ALL CONCRETE WORK SHALL CONFORM TO THE AMERICAN CONCRETE INSTITUTE
PUBLICATIONS: ACI 117, ACI 301, ACI 305.1, ACI 306.1, ACI 308.1, ACI 318 AND SP-066, UNO.
2. CONCRETE MATERIALS SHALL CONFORM TO:
CEMENT ASTM C150, TYPE I OR II
FLY ASH ASTM C618, TYPE C OR F
FINE AND COARSE AGGREGATE ASTM C33
WATER POTABLE
AIR-ENTRAINING ADMIXTURE ASTM C260
WATER-REDUCING ADMIXTURE ASTM C494
3. CONCRETE STRENGTHS SHALL CONFORM TO, UNO:
4. DRYPACK SHALL BE 1:3-1/2 PORTLAND CEMENT TO SAND WITH A MINIMUM 28-DAY STRENGTH OF
7000 PSI.
5. GROUT SHALL BE 1:3:2 PORTLAND CEMENT TO SAND TO PEA GRAVEL WITH A MINIMUM 28-DAY
STRENGTH OF 7000 PSI.
6. CROSS REFERENCE ARCHITECTURAL AND STRUCTURAL DRAWINGS TO ASSURE PROPER
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .