SOW PALMER CONDENSATE AND SUMP PUMPS.pdf

PDF 553 KB Posted

Attached to
PALMER HALL DUPLEX CONDENSATE TANK REPLACEMENT Federal contract opportunity
Solicitation number
6923G225Q000014
Issued by
Department of Transportation Maritime Administration

About this file

This Statement of Work (SOW) details a replacement project for the U.S. Merchant Marine Academy (USMMA) located in Kings Point, New York. The project involves replacing the condensate return tank and sump pump in the mechanical room of Palmer Hall. Specific deliverables include disconnecting and removing the existing duplex condensate return tank and control panel, installing a new tank with all associated fittings, steam traps, and valves, and replacing the current sump pump with a new two-pump system capable of handling high temperatures. The contractor is responsible for providing all labor, materials, transportation, and supervision, and must complete the work within 90 calendar days after Notice to Proceed, during normal business hours (0700-1630, Monday through Friday). The work must conform to federal, state, and local regulations, and adhere to historic preservation standards since the USMMA is listed on the National Register of Historic Places.

View the file

Other files for this federal contract opportunity

Other files attached to PALMER HALL DUPLEX CONDENSATE TANK REPLACEMENT, newest first.
File Type Posted
FBO NOTICE SF 1449 6923G225Q000014 PALMER HALL TANK REPLACEMENT.pdf PDF
WAGE DETERMINATION NO. 2015-4157 Rev No. 29 dtd 7.08.25.pdf PDF
SOL NOTICE 6923G225Q000014 PALMER HALL CONDENSATE AND SUMP PUMPS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Palmer Hall condensate return tank replacement and sump pump replacement.

U.S. MERCHANT MARINE ACADEMY

KINGS POINT, NEW YORK

DATE

Prepared by

U.S. DEPARTMENT OF TRANSPORTATION

MARITIME ADMINISTRATION

U.S. MERCHANT MARINE ACADEMY

BACKGROUND

The United States Merchant Martine Academy (USMMA) is an agency of the Maritime Administration (MARAD) managed by the United States Department of Transportation.

The USMMA is listed on the National Register of Historic Places. Therefore, all work shall be consistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties (36 CFR part 68) http://www.nps.gov/tps/standards/four-treatments/treatment-guidelines.pdf.

All work shall meet or exceed the standards provided in the Secretary of the Interior’s Standards for Rehabilitation and guidelines for applying the standards published by the National Park Service, U.S. Department of the Interior 36 CFR 67.7 - Standards for rehabilitation.

SCOPE

The USMMA seeks a qualified and experienced contractor to provide labor, material, transportation, tools, equipment and supervision to perform a replacement of the steam condensate return tank and pumps inside of the mechanical room of Palmer Hall. The contractor will also replace the existing sump pump with a new two pump system and cover.

DELIVERABLES

The Contractor is responsible for the following;

Condensate return tank

1. Disconnect prewired unit control panel from duplex condensate tank.

2. Disconnect steam supply and condensate return lines from condensate tank.

3. Remove and replace duplex condensate return tank with contractor supplied new unit.

4. Replace all steam traps on condensate tank.

5. Replace all isolation valves for condensate tank.

6. Remove old discharge check valves and replace.

7. Reconnect and energize prewired unit control panel supplied with new condensate return tank.

8. All fittings, pumps, steam traps, and valves to be supplied as new from contractor.

9. Replacement of any pipe insulation and pipe hangers which require removal to complete any repairs. All insulation shall be replaced with fiberglass pipe wrap or approved equal.

10. Leak checking and ensuring all installed piping and fittings are free from leaks.

Sump Pump

11. Remove drain piping to access sump pit cover and pump.

12. Remove existing pump and cover

13. Install new sump pump with a two-pump system that can handle high temperatures.

14. Install new cover that works with new system.

15. Reconnect to all existing branches.

16. All fittings, pumps, steam traps, and valves to be supplied as new.

17. Leak test.

Figure 1 Duplex condensate return tank

GENERAL

1. The contractor shall provide all labor and material, transportation and supervision in the performance of all tasks detailed in this statement of work.

2. All work is to conform to federal, state and local regulations and codes.

3. Maintain a work area compliant with safety standards.

4. Areas worked on shall be cleaned and secured on a daily basis.

5. Any damage to existing facilities or appurtenances shall be repaired or replaced in kind, by the contractor at no cost to the Government.

6. Examine existing conditions prior to any repair activities, site visit will be scheduled to inspect the site where services are to be performed.

7. Excess material and debris shall be disposed of in accordance with local and state ordinances.

8. No vehicles shall be driven on the sidewalks or grass.

9. Make every effort to minimize the impact to the daily routine of the Academy.

CLOSE OUT:

The contractor shall provide a signed warranty of any damage, defective material and improper workmanship on any material provided in this contract.

Materials and labor to be warranted for one year after installation, and equipment to be warranted per manufacturer

SUBMITTALS

1. N/A

GOVERNMENT FURNISHED PROPERTY, MATERIAL, EQUIPMENT OR

INFORMATION.

N/A

CONSIDERATIONS

• Maintain communication with the COR (and immediately inform the COR of any unforeseen issues or problems that arise).

• Inform COR of any anticipated disruption in services for construction at least three (3) days in advance

PLACE OF PERFORMANCE

Contractor will perform the task at located at the USMMA, 300 Steamboat Road, Kings Point, N.Y. 11024

PERIOD OF PERFORMANCE

Work is to be completed within 90 calendar days after NTP is approved. Work is to be performed during normal business hours 0700 to 1630, Monday through Friday unless approval is granted by the Contracting Officer.

File details come from the government source that posted it. Updated .