This sources sought notice requests information from manufacturers capable of designing, manufacturing, testing, and delivering two 90-inch diameter jet-flow gates and associated equipment for replacement of existing hollow-jet valves at Palisades Dam. Responses are due by May 12, 2021 and should include the contractor's name, size classification, description of relevant capabilities and experience on similar past projects within the last 20 years. Capabilities of interest include experience manufacturing jet-flow gate designs that have been successfully installed and remain in service. The government intends to issue this work as an acquisition of commercial products and services under FAR Parts 12 and 15, which may include an economic price adjustment clause and interim payments. The NAICS code for this opportunity is 332911 for industrial valve manufacturing.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Palisades Dam Jet-Flow Gate Supply Palisades Project, Idaho
Statement of Work
SOW- 1
DESCRIPTION / SPECIFICATIONS
STATEMENT OF WORK (SOW)
1.01 DEFINITIONS
A. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.
B. CO: Contracting Officer
C. COR: Contracting Officer Representative
D. Days: Calendar days.
E. HJV: Hollow-Jet Valve
F. JFG: Jet-Flow Gate
G. OGR: On-site Government Representative
H. Reclamation: Bureau of Reclamation.
I. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.
1.02 BACKGROUND AND EXISTING SITE CONDITIONS
A. Reclamation constructed Palisades Dam and Powerplant from 1951 through 1957 on the South Fork of the Snake River in southeast Idaho. The dam is located on the Snake River, about 7-1/2 miles southeast of Irwin, Idaho, and about 11 miles west of the Idaho- Wyoming border in Bonneville County, Idaho.
Two separate 26-foot diameter tunnels feed the powerplant and outlet works through the left abutment. The outlet works includes six pairs of 7.5-foot x 9-foot regulating slide gates: four pairs that are connected to the outlet works tunnel and two pairs that are connected to the powerplant tunnel. The four pairs that are connected to the outlet works tunnel are used to regulate flows through the dam. The outlet works also includes a pair of 96-inch diameter ring follower gates in tandem with 96-inch diameter hollow-jet valves. The two (2) hollow-jet valves are the primary valves used to regulate flows through the dam during the summer operating months and are not used and winterized during the winter months. The two (2) hollow-jet valves serve as the dedicated primary make-up valves for the generator units. The hollow-jet valves are tied into the SCADA system and are often remotely operated.
The two hollow-jet valves have reached the end of their life and will be replaced with two
(2) 90-inch diameter jet-flow gates furnished under this contract.
SOW- 2
B. The existing 96-inch diameter hollow-jet valves, valve controls, adaptors, and appurtenances will be removed under a separate contract.
C. The jet-flow gates and appurtenances furnished under this contract will be installed under a separate contract.
D. The existing floor hatch panels above the 96-inch hollow-jet valves will be removed and modified or replaced under a separate contract to suit the jet-flow gates.
E. Existing concrete valve supports used to support the weight of the 96-inch hollow-jet valves will be removed under a separate contract.
F. The 96-inch hollow-jet valves, valve controls, adaptors, and appurtenances will stay in place for the post-award on-site survey performed as part of this contract.
G. Reference photographs can be found in Section 51 00 30 – Photographs.
1.03 SCOPE
A. The Contractor shall design, manufacturer, test, and deliver Palisades Dam two 90-inch diameter jet-flow gates with motor operators and appurtenances. The Contractor shall be responsible for collecting and field verifying measurements. The Contractor shall provide all labor, materials, equipment and permits necessary to complete the requirements outlined in this statement of work and in the Reclamation-approved submittals. The Contractor shall comply with all applicable Federal, State and Local laws and regulations.
1. 90-inch Diameter jet-flow gates with motor operators and appurtenances in accordance with Section 09 96 20 – Coatings and Section 35 22 25 – Jet-Flow Gate.
1.04 TASK
A. Conduct post-award on-site survey.
B. Prepare and transmit submittals in accordance with this SOW.
C. Host a monthly call with the COR. Provide status update and adjustments to project schedule.
D. Manufacture, test, and perform source quality control for two 90-inch diameter jet-flow gates with motor operators and appurtenances.
E. Deliver to Palisades Dam two 90-inch diameter jet-flow gates with motor operators and appurtenances.
F. Supervise installing contractor during reassembly and installation of the jet-flow gates, Motor Operators, and appurtenances at Palisades Dam.
SOW- 3
G. Set the Motor Operator torque settings and open and close limits after installation by installing contractor and witness dry and wet operating testing of the jet-flow gates and Motor Operator
1.05 DELIVERABLES
A. Project Schedule:
1. Develop and track the status of the project using a project management schedule with the following elements:
a. Cover the full scope of work.
b. Include all tasks, milestones, and durations in tabular form as well as Gantt Chart.
c. Calculate and identify the critical path.
2. If a schedule variance is identified, provide the COR an update at the monthly project call.
3. Cost: Include in prices offered in the Price Schedule for other items of work.
B. Submittals in accordance with this SOW.
1. Cost: Include in prices offered in the Price Schedule for other items of work.
C. Two jet-flow gates with motor operators and appurtenances to Palisades Dam.
1.06 PERIOD OF PERFORMANCE
A. Period of performance to include preparatory work, approval of submittals, all post-award on-site work, manufacturing and procuring for jet-flow gates and appurtenances, delivery of jet-flow gate and appurtenances, supervision of assembly and installation by others, and Motor Operator setup and witnessing of jet-flow gate operational testing by others.
B. Recognized Holidays: Federal Holidays, post-award on-site survey not permitted on holidays.
C. Post-award on-site Survey: Perform post-award on-site survey between September 1 and April 1. Access is restricted from April 1 to September 1 due to facility required seasonal releases. Minimum 14-day notice required for scheduling post-award on-site survey.
D. Hours of Operations for post-award on-site survey: Monday through Thursday, except holidays, between 8:00 am and 4:00 pm
E. Required Delivery of jet-flow gates and appurtenances: The Contractor Shall deliver both jet-flow gates and appurtenances between the hours of 8:00 am and 4:00 pm, Monday through Thursday at Palisades Dam, Bureau of Reclamation, 3933 SW Hwy 26, Irwin, SOW- 4
Idaho 83428. Delivery of all items to Palisades Dam shall be between May 1, 2023 and August 31, 2023.
1.07 SITE CONDITIONS
A. Place of Performance:
1. Post-award on-site survey, delivery, supervision of assembly and installation, and Motor Operator setup and witnessing of jet-flow gate operational testing:
Palisades Dam, 3933 SW Hwy 26, Irwin, Idaho 83428.
2. All other work shall be performed at a location not on Reclamation property.
B. Site Access: Adverse weather conditions may make site access difficult periodically though the year and shall be considered when scheduling post-award on-site survey.
C. Disassembly of existing equipment for the post-award on-site survey will be limited to removal by Reclamation up to two flange bolts on each of the 96-inch diameter flanges.
D. Measurement tools, equipment, and/or reference templates used for site survey shall be furnished by Contractor.
1.08 SUBMITTALS
A. SUBMITTAL REQUIREMENTS
1. General:
a. Prepare in English.
b. Label with contract number and title and RSN.
c. Measurement Units: US Customary Units.
2. Drawings:
a. Minimum Identification in Title Block:
1) Government contract number and title.
2) Contractor’s or supplier’s title, drawing number, and sheet number if more than one sheet per drawing number.
3) Drawing prepared by name and date.
4) Drawing checked by name and date. Drawing checker shall not be same as preparer.
b. Print Size: ANSI D size (22 inches by 34 inches), ANSI B size (11 inches by 17 inches), or ANSI A size (8 ½ inches by 11 inches).
c. Draw to scale using computer drafting or drafting equipment, unless otherwise specified.
SOW- 5
d. Show revision changes, including revision dates. Indicate changes by clouding.
3. Samples Submittals:
a. Label with complete manufacturer's product and color identification.
b. Include type and quantity of materials specified in the referenced section in each “set” of samples.
c. Samples: Representative of product to be installed.
d. Label each sample, sample kit with contract number and title.
4. Product Data:
a. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets.
1) Identify manufacturer's name, type, model, size, and characteristics.
2) Illustrate that product or equipment meets requirements of specifications.
3) Strike through items that do not apply.
5. Certifications:
a. Certifications by a registered professional: Signed and sealed by registered professional.
b. Manufacturer’s certifications: Signed by authorized representative of manufacturer.
c. Test certification: Signed by authorized representative of organization or manufacturer performing the test.
B. SUBMITTALS PROCEDURES
1. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.
2. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table A - List of Submittals. A complete set includes all listed items for RSNs with multiple parts.
3. Submit sets specified in “Sets to be sent:” columns in Table A - List of Submittals.
a. Electronic submittals:
1) In Portable Document Format (PDF).
a) Optical Character Recognition (OCR).
b) 508 compliant.
SOW- 6
c) RSNs having more than one requirement shall be bookmarked.
d) RSNs with requirements for files other than PDF (e.g.
.XER, .PLF, .DWGs, etc.) shall be combined using WINZip.
2) Include RSN transmittal letter.
3) Personally Identifiable Information (PII) shall be encrypted using WINZip or Adobe Acrobat before transmitting electronically.
4) Submittals received after 5:00 p.m. Mountain Time, shall be documented as received the next business day.
4. Include the following information in transmittal letters:
a. Contract number and title.
b. RSN for each attached submittal.
c. Responsible code.
d. Number of sets for each RSN.
e. Identify submittal as initial or resubmittal.
5. Resubmittal of revised submittals:
a. Mark changes such that they are readily identifiable and show revision date.
b. Describe reasons for significant changes in transmittal letter.
c. Resubmit returned not approved submittals within 28 days after receiving comments, unless otherwise directed.
d. Requirements for initial submittals apply to resubmittals.
e. Resubmittals shall be complete submittals without reference to the original submittal.
6. Submit each RSN under a separate transmittal letter. Multiple RSNs submitted under a single letter will be returned for resubmittal.
C. REVIEW OF SUBMITTALS
1. Time Required:
a. Submittal review will require 28 days for review of each submittal or resubmittal, unless otherwise specified.
b. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return email postmark date.
2. Time in Excess of Specified:
SOW- 7
a. CO may extend contract completion date to allow additional time for completing work affected by excess review time.
1) Time extension will be to extent that excess review time caused delay to contract completion date and will not exceed time used in excess of specified number of days for review of submittals or resubmittals.
2) Concurrent days of excess review time resulting from review of 2 or more separate submittals or resubmittals will be counted only once in extending contract completion date.
b. No time extension will be allowed if Contractor fails to make complete action submittals in sequence and within time periods specified.
c. Adjustment for delay will be made only to extent that:
1) Approval was required under contract.
2) Requests for approval were properly and timely submitted and were approved.
d. Adjustments will be subject to the terms of FAR clause 52.212-4, Contract Terms and Conditions - Commercial Products and Commercial Services.
3. Submittal response:
a. Response letter will indicate whether submittal is approved, not approved, or acknowledged receipt.
1) Revise and resubmit submittals not approved.
2) Do not change designs without approval of CO after drawings, documentation, and technical data have been approved.
D. TRANSMITTAL
1. Addresses for codes receiving paper copy submittals listed in Table A - List of Submittals:
a. Contracting Officer (CO), Bureau of Reclamation Contracting Officer:
Address will be provided after award.
b. Representative (COR) Bureau of Reclamation: Address will be provided after award.
2. E-mail address for electronic submittals listed in Table A - List of Submittals:
email addresses will be provided after award.
a. Submit electronic submittals that are too large for e-mail to the physical address above.
3. Submittals required by specifications, but not listed in Table A - List of Submittals:
a. Submit in accordance with this section.
SOW- 8
b. Submit to COR unless otherwise specified.
Table A - List of Submittals
** CO indicates Contracting Officer, COR indicates Contracting Officer’s Representative.
RSN
Clause or
Section Title
Submittals required Due date or delivery time
Respon-sible code
Sets to be sent: **
CO COR
1 Deliverables Project Schedule Within 21 days after receipt of Notice of Award/Post award conference
COR 1 electronic 1 electronic
09 96 20‐1 Coatings Approval Data Submitted and approved at least 28 days before beginning application
COR
1 electronic 1 electronic
09 96 20‐2 Coatings Final Approval Data Submitted and approved at least 28 days before beginning
09 96 20‐3 Coatings Qualifications Submitted and approved at least 28 days before beginning encrypted
09 96 20‐4 Coatings Quality Control Plan Submitted and approved at least 28 days before beginning
09 96 20‐5 Coatings Contractor Quality Testing Report
Monthly COR
35 22 25‐1 Jet‐Flow Gate
Approval Data and Drawings
Submitted and approved before fabrication or procurement
35 22 25‐2 Jet‐Flow Gate Shop Drawings and Qualifications
Submitted and approved before fabrication or procurement encrypted
35 22 25‐3 Jet‐Flow Gate Weld and Material Test Reports
Within 14 days after completing fabrication
35 22 25‐4 Jet‐Flow Gate JFG Installation Procedure
Submitted and approved at least 28 days before delivery
35 22 25‐5 Jet‐Flow Gate Shop Test Data Within 14 days of completing shop tests
35 22 25‐6 Jet‐Flow Gate Final Data Within 28 days after delivery
SOW- 9
1.09 APPLICABLE PUBLICATIONS/STANDARDS/CODES
Table B - Addresses for Specifications, Standards, and Codes
Acronym Name and Address Telephone
ACI American Concrete Institute 38800 Country Club Drive Farmington Hills, MI 48331-3439 https://www.concrete.org/home.aspx”
248-848-3700
AISC American Institute of Steel Construction One East Wacker Drive, Suite 3100 Chicago, IL 60601-2001 www.aisc.org
312-670-2400
AMPP Association for Materials Protection and Performance (Formerly The Society for Protective Coatings (SSPC) and NACE International (NACE)) 15835 Park Ten Place Houston, Texas 77084, USA www.ampp.org
800-797-6223
ANSI American National Standards Institute 1819 L. Street, NW.
Washington, DC 20036 www.ansi.org
202-293-8020
ASCE American Society of Civil Engineers 1801 Alexander Bell Drive Reston, VA 20191 www.asce.org
800-548-2723
ASME American Society of Mechanical Engineers 3 Park Avenue New York, NY 10016-5990 www.asme.org
800-843-2763
ASNT American Society of Nondestructive Testing P.O. Box 28518 1711 Arlington Lane Columbus, OH 43228-0518 www.asnt.org
800-222-2768 Fax 614-274-6899
ASTM ASTM International P.O. Box C700 100 Barr Harbor Drive West Conshohocken, PA 19428-2959 www.astm.org
610-832-9585
SOW- 10
Table B - Addresses for Specifications, Standards, and Codes
Acronym Name and Address Telephone
AWS American Welding Society 550 NW LeJeune Road Miami, FL 33126 www.amweld.org
800-443-9353 305-443-9353
AWWA American Water Works Association 6666 W. Quincy Avenue Denver, CO 80235 www.awwa.org
303-794-7711
ISO International Organization for Standardization 1, ch. De la Voie-Creuse, Case postale 56 CH-1211 Geneva 20, Switzerland www.iso.org
+41 22 749 01 11
ICC International Code Council 500 New Jersey Avenue, NW 6th Floor, Washington, DC 20001 www.iccsafe.org
202-370-1800
MSS Manufacturers Standardization Society of the Valve and Fittings Industry 127 Park Street, NE Vienna, VA 22180-4602 www.mss-hq.com
703-281-6613
NEMA National Electrical Manufacturers Association 1300 N 17th Street, Suite 1847 Rosslyn, VA 22209 www.nema.org
703-841-3200
UL Underwriters Laboratories, Inc.
333 Pfingsten Road Northbrook, IL 60062-2096 www.ul.com
847-272-8800
1.10 CONTRACTOR PERFORMANCE ASSESSMENT
A. The COR will be the primary individual to monitor and/or assess the Contractor’s work, and will report any deficiencies to the CO as appropriate. The COR is responsible to ensure that all technical requirements of the contract and this SOW are met. As such, the COR may be asked to provide input to the CO regarding the Contractor’s performance
SOW- 11
during the course of the contract, and during the close-out phase in which the Contractor may receive a final evaluation of their work.
1.11 APPENDICES
A. Section 09 96 20 – Coatings
B. Section 35 22 25 – Jet-Flow Gate
C. Section 51 00 30 – Photographs
1.12 DRAWINGS:
A. DISCREPANCIES, ERRORS, OR OMISSIONS
1. Inform the CO of discrepancies discovered on drawings.
2. In case of discrepancies, written specifications take precedence over drawings unless otherwise specified.
B. PROJECT CONDITIONS
1. Where there are differences as determined by the CO between details and dimensions shown on drawings and details and dimensions of existing features at jobsite, use details and dimensions of existing features at jobsite.
C. INFORMATION DRAWINGS
1. Drawings marked "For Information Only" in the drawing list are included to show existing features about which knowledge is required to perform work under this contract. These drawings do not show work to be performed under this contract.
2. If there are differences as determined by the CO between details and dimensions shown on these drawings and those of existing features at jobsite, use details and dimensions of existing features at jobsite.
D. LIST OF DRAWINGS
1. Drawings listed in Table C – List of Drawings, are made a part of Description/Specifications, Statement of Work.
Table C - List of Drawings
Sheet No.
Drawing No. Title
General:
1 456-D-60030 Hollow Jet Valve Replacement – 90” Jet-Flow Gate Installation
SOW- 12
Table C - List of Drawings
Sheet No.
Drawing No. Title
2 456-D-60031 Hollow Jet Valve Replacement – 90” Jet-Flow Gate Installation Details
For Information Only:
3 456-D-37 Penstock and Outlet Pipes, Sta. 17+48.00 to Downstream End Manifolds
4 456-D-205 Diversion Channel Lining Sta. 17+44 to 19+00.25 For Outlet Pipe
5 456-D-392 96” Ring Follower and 7’-6” x 9’-0” Outlet Gates Installation – List of Drawings
6 456-D-772 96” Hollow Jet Valve Installation
7 456-D-783 96” Hollow Jet Valve Adaptor, Conduit – Adaptor
8 456-D-978 Outlet Works – Control House Plan and Sections
9 456-D-979 Outlet Works – Control House Sections and Details
10 456-D-1139 Outlet Works – Control House Outlets No. 1 to 6 Substructure – Reinforcement, Sheet 1 of 2
11 456-D-1140 Outlet Works – Control House Outlets No. 1 to 6 Substructure – Reinforcement, Sheet 2 of 2
12 456-D-1141 Outlet Works Reinforcement List
13 456-D-1164 Outlet Works – Control House Stop Log Slot and Hatch Metalwork Installation – List of Parts
14 456-D-1167 Outlet Works – Control House Stop Log Slot and Hatch Metalwork Covers
END OF SECTION
Coatings
09 96 20 - 1
SECTION 09 96 20
COATINGS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. General:
1. Payment for various items to be coated includes the following costs:
a. Containment, safety, and health activities for coatings work.
b. Surface preparation, such as abrasive blasting, cleaning, and grinding.
c. Coating application and remedial work.
B. Cost:
1. Include cost of coating interior surfaces of new 90-inch jet-flow gates, motor operator and appurtenant equipment, and interior and exterior surfaces of pipe spool in applicable lump sum prices offered in the Price Schedule for Jet-Flow Gate for Outlet 3 and Jet-Flow Gate for Outlet 4.
2. Include cost of passivating exterior surfaces of 90-inch jet-flow gate in applicable lump sum prices offered in the Price Schedule for Jet-Flow Gate for Outlet 3 and Jet-Flow Gate for Outlet 4.
1.02 REFERENCE STANDARDS
A. ASTM International (ASTM)
1. ASTM A380-17 Cleaning, Descaling, and Passivation of Stainless Steel Parts, Equipment, and Systems
2. ASTM D870-15 Testing Water Resistance of Coatings Using Water Immersion
3. ASTM D2794-93(2010) Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
4. ASTM D4060-14 Abrasion Resistance of Organic Coatings by the Taber Abraser
5. ASTM D4285-83(2012) Indicating Oil or Water in Compressed Air
6. ASTM D4541-09 Pull-Off Strength of Coatings Using Portable Adhesion Testers
09 96 20 - 2
7. ASTM D5894-10 Cyclic Salt Fog/UV Exposure of painted Metal, (Alternating Exposures in a Fog/Dry Cabinet and a UV/Condensation Cabinet)
8. ASTM G8-96(2019) Cathodic Disbonding of Pipeline Coatings
B. International Organization for Standardization (ISO)
1. ISO 8502-3:2017 Assessment of dust on Steel Surface Prepared for Painting (Pressure-Sensitive Tape Method)
C. Association for Materials Protection and Performance (AMPP), formerly The Society for Protective Coatings (SSPC) and NACE International (NACE)
1. SSPC-AB1-15 Mineral and Slag Abrasives
2. SSPC-AB2-15 Cleanliness of Recycled Ferrous Metallic Abrasives
3. SSPC-AB3-04 Newly Manufactured or Re-Manufactured Steel Abrasives
4. SSPC-Guide 15-13 Field Methods for Retrieval and Analysis of Soluble Salts on Substrates and Other Nonporous Substrates
5. SSPC-PA1-04 Shop, Field, and Maintenance Painting of Steel
6. SSPC-PA2-15 Measurement of Dry Paint Thickness with Magnetic Gages
7. SSPC-SP1-15 Solvent Cleaning
8. SSPC-SP5/NACE 1-07 White Metal Blast Cleaning
9. SSPC-SP10/NACE 2-07 Near-White Blast Cleaning
10. SSPC-SP11-13 Power Tool Cleaning to Bare Metal
11. SSPC SP17-19 Thorough Abrasive Blast Cleaning of Non- Ferrous Metals
12. SSPC-TR2/NACE 6G198-04 Wet Abrasive Blast Cleaning
13. SSPC-VIS1-02 Guide and Reference Photographs for Steel Surfaces Prepared by Abrasive Blast Cleaning
14. SSPC-VIS3-04 Visual Standard for Power- and Hand-Tool Cleaned Steel
15. NACE RP 0287-02 Field Measurement of Surface Profile of Abrasive Blast Cleaned Steel Surfaces Using a Replica Tape
09 96 20 - 3
16. NACE SP 0188-06 Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals.
B. RSN 09 96 20-1, Approval Data:
1. For each coating material:
a. Manufacturer’s product data, application, and MSDS sheets.
b. Supplier’s name, address, and phone number.
c. Identification of “Items to be coated” including sub-letter and sub-number listed in Coating Tabulations.
2. For each substituted coating material “equal” to specified product in Coating Tabulation:
a. List of not less than 3 similar successful material applications:
1) Project name, location, type of structure, and application dates.
2) Owner’s name, address, and telephone number.
b. Certification that material meets or exceeds specified requirements:
1) Manufacturer’s certification including technical representative’s signature and date of signature.
2) Independent laboratory’s certified test reports.
C. RSN 09 96 20-2, Final Approval Data:
1. For each coating material:
a. Purchase orders including order number, date, manufacturer’s designated product name, batch number(s), and quantity purchased.
D. RSN 09 96 20-3, Qualifications:
1. Coating Contractor:
a. List not less than five comparable completed jobs for each coating type including owner’s name, address, and telephone numbers completed within the last five years.
2. Coating Applicators:
a. List of not less than five comparable jobs for each coating type including owner’s name, address, and telephone number.
3. Coating Contractor Inspectors:
09 96 20 - 4
a. Qualified to inspect specified coating materials by coating experience or certifications. Provide the following:
1) Successfully completed training in the inspection of coating materials similar too materials and conditions specified. Provide documentation.
2) Letter from contractor listing the personnel performing QC inspections, certified at a minimum as NACE Coating Inspector Level 1 (CIP) or as a SSPC Protective Coatings Inspector (PCI).
E. RSN 09 96 20-4, Quality Control Plan:
1. Quality Control Manager:
a. Name and title.
2. Quality Control Procedure:
a. Quality control plan.
b. Procedure for addressing identified non-conformities.
F. RSN 09 96 20-5, Contractor Quality Testing Final Report:
1. Comprehensive report of daily quality control test reports.
1.04 DELIVERY, STORAGE, HANDLING
A. Deliver materials to jobsite in original, undamaged, unopened containers labeled with manufacturer’s name, designated product name, batch number, date of manufacture, and any special instructions.
B. Deliver materials in containers not larger than 5 gallons as packaged by manufacturer unless suitable equipment is provided at jobsite to handle and thoroughly mix materials in larger containers.
C. Store coating materials and thinners in accordance with the manufacturer's recommendations, and as a minimum, store off the ground, under cover, and at 50 to 95 degrees F.
D. Do not use coating material which has exceeded manufacturer’s specified storage stability period (shelf life).
1.05 AMBIENT CONDITIONS
A. Maintain environmental conditions to meet coating manufacturer’s requirements during surface preparation, coating application, and curing period. Provide heating or cooling, and dehumidification as needed. Complete curing before placing the coating systems into service.
09 96 20 - 5
B. Coatings shall be applied when the substrate surface temperature is 5 degrees F or more above the dew point temperature and for at least 8 hours after application.
PART 2 PRODUCTS
2.01 EQUIPMENT
A. Surface preparation and spray application equipment:
1. Sized in accordance with coating manufacturer’s recommendations.
2. Provide:
a. Pressure gauges and pressure regulators.
b. Air supply lines free from oil and moisture.
2.02 ABRASIVES
A. Mineral and slag abrasives: Meets SSPC-AB1, type I (natural minerals) and type II (slags), class A.
B. SSPC-AB2 for recycled cleanliness.
C. SSPC-AB3 Class I (steel) or II (iron) for angular shaped grit. Shot abrasives are not acceptable.
D. Do not use carbon steel grit as an abrasive for stainless steel surfaces. See SSPC SP17.
E. Commercially available products or processes to render the hazardous waste stream non-hazardous and not exceeding toxicity threshold limits.
1. Additive stabilizers for leachable toxic metal wastes are allowed, except elemental iron is not permitted.
2.03 COATINGS
A. Specified in Coating Tabulations:
1. Apply only one coating system per option in Coating Tabulations.
2. Apply compatible products of same manufacturer for coating system components.
B. Volatile Organic Compounds (VOC): Do not exceed maximum permitted by Federal, State, and local air pollution control regulations as supplied in container or by addition of thinner material.
C. Factory color or tint only. Do not color or tint at jobsite.
D. Use manufacturer’s recommended thinners for coating materials.
09 96 20 - 6
E. Do not use accelerator products unless approved by COR.
PART 3 EXECUTION
3.01 PROTECTION OF ADJACENT SURFACES
A. Remove, mask, or otherwise protect items or surfaces not coated from contamination and damage during cleaning and coating operations.
1. Examples include protecting mating and machined surfaces, mechanical and electrical equipment (open or enclosed), instruction and similar plates, and wet and newly coated surfaces.
3.02 SURFACE PREPARATION
A. Remove or repair surface irregularities and impart profile as specified:
1. Welds:
a. Welds: Smooth and continuous.
b. Weld spatter, slag, buckshot, laminations, and slivers: remove and grind smooth.
c. Undercuts and porosity: Fill with weld material and grind smooth.
d. Projections, sharp edges, high points, fillets, and corners: Grind smooth to a radius of at least 1/16-inch.
2. Substrate defects:
a. Pitting, gouges, scratches, porosity, and similar:
1) Grind smooth.
3. Grind full length of edges and corners smooth to a radius of at least 1/16-inch.
B. Surface preparation method:
1. See Coating Tabulations.
a. Method A: SSPC-SP1.
b. Method C: SSPC-SP10/NACE 2.
c. Method C-1: Repair of defective or damaged coated areas.
1) For metal substrate:
a) SSPC-SP10/NACE 2.
b) SSPC-SP11 where abrasive blasting is impractical.
i. Level 3 shall be required with no amount of residue permitted in pit bottoms and surface a profile of 1-mil minimum unless a high value is specified.
09 96 20 - 7
2) For surrounding intact coating (nominal 2 to 4-inch margin):
a) SSPC-SP1.
b) Feather abrupt edges and around repair area by hand or power tool with non-woven pad into adjacent tightly bonded coatings.
c) Roughen or abrade surface in accordance with manufacturer’s recommendations to achieve matted or lusterless finish.
d. Method G (stainless steel): ASTM A 380.
e. Method H: SSPC-SP5/NACE 1.
f. Method I: SSPC SP17.
2. Compare prepared steel surfaces to following visual reference photographs for allowable visible contaminants and stains:
a. SSPC-VIS1 for abrasive blast cleaning.
b. SSPC-VIS3 for power and hand tool cleaning.
3. Assessment of dust contaminants:
a. Perform clear tape test method in accordance with ISO 8502-3.
b. Perform three tests per shift.
c. Acceptance Criteria: Degree of cleanliness shall meet Class 3.
C. Surface profile:
1. Prepare as specified in Coating Tabulations.
2. Where not specified, prepare in accordance with manufacturer’s instructions for metallic substrates or existing coating surfaces and service environment.
3. Where manufacturer’s instructions do not specify a surface profile, prepare blasted surfaces to following profile:
a. Atmospheric Service Environments: 1 mil or greater angular profile and less than specified millage of first applied coat.
b. Burial and Immersion Service Environments: Angular profile 2 mil or greater and less than specified millage of first applied coat.
4. Inspect surface profile in accordance with NACE SP 0287:
a. Use replica tape suitable for surface profile depth range.
b. Perform at least two tests per 1,000 square feet.
D. Soluble salts:
09 96 20 - 8
1. Measure concentration of chlorides, nitrates, and sulfates in accordance with SSPC Guide 15.
2. Perform at least two tests per 1,000 square feet of surface area.
3. Acceptance criteria: Do not exceed 3 micrograms per square centimeter for chlorides and 5 micrograms per square centimeter for nitrates and sulfates.
E. Re-clean or perform additional surface preparation of contaminated surfaces before coating application.
3.03 COMPRESSED AIR EQUIPMENT
A. Keep air compressor and spray application equipment lines free of oil and moisture during work.
B. Compressed air quality:
1. Perform tests in accordance with ASTM D4285.
2. Perform test at the beginning of every shift.
3.04 COATING APPLICATION
A. Stripe coat:
1. Brush apply stripe coat to each coat applied.
2. Apply stripe coat prior to spray application of the primer, when practical.
3. Apply to edges, corners, interior angles, pits, plate seams, crevices, rivets, nuts, threads, bolts, washers, welds, and similar features.
B. Apply number of coats and coating thickness specified in Coating Tabulations.
1. Alternate coat colors to differentiate between coats.
2. Apply in accordance with manufacturer’s instructions.
3. Apply in accordance with SSPC PA1.
C. Prevent overspray or dry spray. When such conditions occur, clean surfaces prior to application of subsequent coats.
D. Re-clean contaminated surfaces between coats.
E. Dry Film Thickness (DFT):
1. After each coat, inspect hardened coating system for DFT compliance in accordance with SSPC PA2.
2. Acceptance Criteria: no single spot measurement less than 80 percent minimum or in excess of 120 percent maximum specified.
09 96 20 - 9
F. Discontinuity (Holiday) Testing:
1. Inspect in accordance with NACE SP 0188:
a. Use maximum test voltage for DFT as recommended by coating manufacturer to prevent coating damage.
G. Coating Adhesion:
1. Test in accordance with ASTM D4541 at the direction of the COR.
3.05 CONTRACTOR QUALITY TESTING
A. Inspection Equipment:
1. Calibrate inspection devices and equipment in accordance with the manufacturer’s instructions.
2. Verify calibration prior to every use.
B. Qualified personnel shall conduct tests and sign reports.
1. Contractor shall allow factory inspections.
2. Perform tests in presence of the COR:
a. Provide COR minimum of 14 days’ notice before a witnessed testing date at locations in the United States of America and 56 days’ notice before a witnessed testing date at locations outside of the United States of America.
Include in notification letter a description of the testing that will be performed, date and time of testing, personal protective equipment required, and physical address of the testing facility.
b. At the option of the Government, in lieu of in-person Government witnessing, Contractor shall host the Government through a live video and audio-conferencing service to allow virtual witnessing of testing.
c. Provide rigging for COR to observe inspections.
C. Make daily reports, including:
1. Date of work.
2. Description of areas and work performed.
3. Environmental conditions.
4. Results from the following quality control tests:
a. Soluble salt.
b. Surface profile.
c. Visual comparison of prepared surfaces.
d. Assessment of dust contaminants.
09 96 20 - 10
e. Compressed air quality.
f. Dry film thickness (DFT).
g. Discontinuity (Holiday) testing.
h. Coating adhesion testing (when directed by the COR).
D. Final inspection will take place after completion, but before placing into service.
3.06 REPAIR AND REMEDIAL WORK
A. Repair defective or damaged areas of coatings in accordance with coating manufacturer’s recommendations.
09 96 20 - 11
3.07 COATING TABULATIONS
Tabulation No. 1
Items not to be coated and to receive a uniform passivation layer:
a. Exterior surfaces of new stainless steel 90-inch jet-flow gates
b. Stainless steel jet-flow gate supports and anchors
c. Stainless steel jet-flow gate stems, track, wheels, axles
d. Stainless steel insulation protective jacket
e. Stainless steel piping, valves, and fittings
f. Stainless steel fasteners and hardware
Note:
1. Do not coat stainless steel items listed above. Stainless steel surfaces to receive uniform passivation. Clean and restore uniform passivation layer on damaged, contaminated, or depassivated stainless steel surfaces by methods listed below.
Degree of surface contamination
ASTM A 380* Surface preparation method**
ASTM A 380* Surface preparation test**
Local heavily contaminated surface areas:
Contaminated by free iron, oxide scale, or rust related contaminates caused by welding, cutting, or heat treatment
Method 5. - "Descaling," General
Method 5.3 - "Mechanical Descaling" by grinding and/or
Method 6.3 - "Cleaning of Welds and Weld-Joint Areas"
Method 7.2 - "Gross Inspection"
Methods 7.2.5 - "Tests for Free Iron: Gross Indications"
09 96 20 - 12
Tabulation No. 1
General contaminated surface areas:
Contaminated by free iron, oxide scale, or rust related contaminates
Method 5. - "Descaling," General
Method 5.2 - "Chemical Descaling"
Method 5.2.2.(1) - "Chemical Descaling" by swab or spray wetting the surfaces and/or
Method 5.3 - "Mechanical Descaling" by grinding
Method 7.2 – “Gross Inspection”
Method 7.2.5 – “Tests for Free Iron: Gross Indication”
General contaminated surface areas:
Contaminated by grease, oil, residual chemical films, or other non-free iron related contaminates
Method 6.2.10 - "Water Jetting" and/or
Method 6.4 - "Final Cleaning, or Passivation, or Both," wiping with a clean, solvent-moistened cloth
Method 7.2 - "Gross Inspection"
Method 7.2.2 - "Wipe Tests"
Where films are not detectable under white light conditions, use:
Method 7.3 - "Precision Inspection"
Method 7.3.2 - "Black Light Inspection"
* Other ASTM A380 methods may be used instead of above specified surface preparation methods and inspection procedures.
** Do not damage attached parts, adjacent parts, or materials by field cleaning and passivation methods of stainless steel.
09 96 20 - 13
Tabulation No. 2
Items to be coated:
a. Interior surfaces of new 90-inch jet-flow gates
b. Interior and exterior surfaces of the new pipe spools upstream of new jet flow gates
c. Seal ring and seal ring clamp
Notes:
1. Do not paint aluminum-brass, bronze, and stainless steel metalwork unless specified.
2. Do not coat seals, mating surfaces, and machined surfaces where paint could interfere with proper operation or fit. Coat exposed machined surfaces after installation.
3. Coat miscellaneous metal work not otherwise tabulated.
4. Coat all associated fasteners to include nuts, bolts, washers, and exposed anchors.
Coating materials – Option 1 Epoxy
Number and thickness of coats
Surface preparation method
Carboline:
Carboguard 891
PPG:
Amerlock 2 or 400 or Amercoat 235
Sherwin Williams:
Duraplate 235 or Macropoxy 646
Tnemec:
Epoxoline Series N69 or V69
Color and gloss: see color schedule
3 or more base coats, apply at 6 to 8 mils DFT per coat, plus stripe coats.
Total base coat system excluding stripe coats:
18-mil DFT, minimum 24-mil DFT, maximum
SSPC-SP1 followed by:
for stainless steel:
SSPC-SP17
for steel:
SSPC-SP5/NACE 1 or
SP10/NACE 2
for wet abrasive blast cleaning with soluble salt remover:
SSPC-TR2/NACE 6G198
2-4 mil surface profile
Follow manufacturer’s surface preparation and application instructions to apply subsequent coats
Coating materials – Option 2 Moisture-cured urethane
Number and thickness of coats
Surface preparation method
Sherwin Williams:
Corrothane I Miozinc Corrothane I Coal Tar
1 or more prime coats, apply at 3 to 5 mils DFT per coat, plus stripe coats.
for stainless steel:
SSPC-SP17
for steel:
09 96 20 - 14
Tabulation No. 2
Wasser:
MC Miozinc 2.8 or 100 MC Tar 2.8 or 100
2 or more coats of tar, apply at 5 to 7 mils DFT per coat.
Total base coat system excluding stripe coats:
13-mil DFT, minimum 19-mil DFT, maximum
SSPC-SP5/NACE 1 or
SP10/NACE 2
for wet abrasive blast cleaning with soluble salt remover:
SSPC-TR2/NACE 6G198
2 mil surface profile
Follow manufacturer’s surface preparation and application instructions to apply subsequent coats
PERFORMANCE REQUIREMENTS:
Testing Protocol Acceptance Criteria
Fresh/deionized water immersion test, ASTM D 870:
passes, 2 years test with water at ambient temperature, no blisters on scribed or unscribed sides.
Dilute Harrison immersion test, Modified
ASTM D 870:
passes, 2 years test with water at ambient temperature, no blisters on scribed or unscribed sides.
Abrasion resistance, ASTM D 4060, CS-17 wheel, 1,000 cycles, 1-kg load:
Epoxy: 100 milligram loss or less MC Urethane: 250 milligram loss or less
Direct impact, ASTM D 2794: 30 inch-pounds
Pulloff adhesion, ASTM D 4541, annex A2, type II tester:
1000 psi or greater
Cyclic testing salt fog/UV, ASTM D 5894: 1/4 inch or less undercutting at 3000 hrs
Cathodic disbondment, ASTM G 8: 1/4 inch or less disbondment 120 day test
09 96 20 - 15
Tabulation No. 3
Items to be coated:
a. New motor operators, gearboxes, and appurtenant equipment for the new 90-inch jet-flow gates, including unexposed surfaces that require coatings, such as interior of cabinets, enclosures, and equipment.
Coating materials Factory coating system
Number and thickness of coats
Surface preparation method
Factory's standard surface preparation and permanent coating system.
Color and gloss: Factory's standard.
END OF SECTION
09 96 20 - 16
This page intentionally left blank.
Jet-Flow Gate 35 22 25 - 1
SECTION 35 22 25
JET-FLOW GATE
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Two 90-inch Diameter Jet-Flow Gates, for Outlets 3 and 4 at Palisades Dam:
1. Payment: Lump-sum price offered in the Price Schedule.
a. Includes:
1) Design, manufacturer, test, and deliver 90-inch jet-flow gates including motor operators, and appurtenances.
B. Manufacturer’s Representative On-site Services and Post-award On-site Survey.
1. Payment: Lump-Sum price offered in the Price Schedule.
a. Includes:
1) Manufacturer’s Installation Representative(s) supervision of the installing contractor during reassembly and installation of the jet-flow gates, Motor Operators, and appurtenances on-site at Palisades Dam for 28 days, 10-hours on-site per day.
2) Set the Motor Operator torque settings and open and close limits after installation by installing contractor and two days per gate on-site at Palisades Dam for witness of dry and wet operating testing of the jet-flow gates and Motor Operator.
3) Post-award on-site survey.
1.02 NOTES
A. Where paragraphs in this Section are written in singular form it shall apply equally where more than one item is required.
1.03 REFERENCE STANDARDS
A. American Concrete Institute (ACI)
1. ACI 318-14 Building Code Requirements for Structural Concrete and Commentary
B. American Institute of Steel Construction (AISC)
1. AISC 360-16 Specification for Structural Steel Buildings
C. American National Standards Institute (ANSI)
35 22 25 - 2
1. ANSI/ASNT CP-189-20 Qualification and Certification of Nondestructive Testing Personnel
2. ANSI Y14.5-19 Dimensioning and Tolerancing
D. American Society of Civil Engineers (ASCE)
1. ASCE 7-16 Minimum Design Loads and Associated Criteria for Buildings and Other Structures
E. American Society of Mechanical Engineers (ASME)
1. ASME B1.5-97(2014) ACME Screw Threads
2. ASME B16.5-20 Pipe Flanges and Flanged Fittings: NPS 1/2 through NPS 24, Metric/Inch Standard
3. ASME B16.9-18 Factory-Made Wrought Buttwelding Fittings
4. ASME B46.1-19 Surface Texture (Surface Roughness, Waviness, and Lay)
5. ASME BPVC.VIII.1 (2019) Boiler and Pressure Vessel Code, Section VIII, Division 1: Rules for Construction of Pressure Vessels
6. ASME BPVC.VIII.2 (2019) Boiler and Pressure Vessel Code, Section VIII, Division 2: Alternative Rules
7. ASME BPVC.IX (2019) Boiler and Pressure Vessel Code, Section IX: Welding and Brazing Qualifications
8. ASME Y14.36M-18 Surface Texture Symbols
F. ASTM International (ASTM)
1. ASTM A193/A193M-20 Alloy-Steel and Stainless Steel Bolting for High Temperature or High Pressure Service and Other Special Purpose Applications
2. ASTM A194/A194M-20 Carbon Steel, Alloy Steel, and Stainless Steel Nuts for Bolts for High Pressure or High Temperature Service, or Both
3. ASTM A240/A240M-20a Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications
4. ASTM A276/A276M-17 Stainless Steel Bars and Shapes
5. ASTM A312/A312M-19 Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes
6. ASTM A564/A564M-19a Hot-Rolled and Cold-Finished Age- Hardening Stainless Steel Bars and Shapes
35 22 25 - 3
7. ASTM A693-16 Precipitation-Hardening Stainless and Heat-Resisting Steel Plate, Sheet, and Strip
8. ASTM B148-18 Aluminum-Bronze Sand Castings
9. ASTM B271/B271M-18 Copper-Base Alloy Centrifugal Castings
10. ASTM B505/B505M-18 Copper Alloy Continuous Castings
11. ASTM D149-20 Dielectric Breakdown Voltage and Dielectric Strength of Solid Electrical Insulating Materials at Commercial Power Frequencies
12. ASTM D1264-18e1 Test Methods for Determining the Water Washout Characteristics of Lubricating Greases
13. ASTM D5363-16 Anerobic Single-Component Adhesives
(AN)
14. ASTM E543-15 Agencies Performing Nondestructive Testing
15. ASTM F593-17 Stainless Steel Bolts, Hex Cap Screws, and Studs
16. ASTM F594-09(2020) Stainless Steel Nuts
G. American Welding Society (AWS)
1. AWS D1.1/D1.1M:2020 Structural Welding Code – Steel
2. AWS D1.6/D1.6M:2017 Structural Welding Code – Stainless Steel
3. AWS A2.4:2020 Standard Symbols for Welding, Brazing, Nondestructive Examination
H. American Water Works Association (AWWA)
1. AWWA C200-18 Steel Water Pipe - 6 in. (150 mm) and Larger
2. AWWA C207-18 Steel Pipe Flanges for Waterworks Service
3. AWWA C512-15 Air Release, Air/Vacuum, and Combination Air Valves for Waterwork and Wastewater Service
4. AWWA C542-16 Electric Motor Actuators for Valves and Slide Gates
I. International Code Council (ICC)
1. IBC 2018 International Building Code
35 22 25 - 4
J. Manufacturers Standardization Society (MSS)
1. MSS SP-102-1989 (R2001) Multi-Turn Valve Actuator Attachment – Flange and Driving Component Dimensions and Performance Characteristics
K. National Electrical Manufacturers Association (NEMA)
1. NEMA 250-20 Enclosures for Electrical Equipment (1000 Volts Maximum)
1.04 DEFINITIONS
A. 0 (Zero) Percent Open Position: Jet-Flow Gate Leaf position when the bottom edge of the Leaf is located at the same elevation as the invert, or bottom, elevation of the Seal Ring’s 90-inch diameter orifice.
B. 100 (One Hundred) Percent Open Position: Jet-Flow Gate Leaf position when the bottom edge of the Leaf is located at the top of the Seal Ring’s 90-inch diameter orifice.
C. Certified Material Test Report: Certified document recording the test results for a particular traceable heat of material and traceable to the materials origin. Document shall contain at a minimum the material heat or lot identification, material grade and standard it was tested in accordance with, material dimensions, mechanical properties, chemical properties, heat treatment if performed, testing results after heat treating, and statement that material conforms with the specified specification.
D. Closed Position: Jet-Flow Gate Leaf position when the bottom edge of the Leaf is located below the invert, or bottom, elevation of the Seal Ring’s 90-inch diameter orifice to a position where leakage past the Seal Ring is minimized. The chamfer along the upstream bottom edge of the Leaf shall be below the sealing surface of the Seal Ring.
E. Control House Floor: Floor of the Control House shown on informational drawings as elevation 5398.0 feet.
F. Lifting Nut: Threaded collar internal to Motor Operator that translates rotation from the Motor Operator to linear actuation of the Stem.
G. Jet-flow Gate (JFG): An upstream sealing slide gate with a converging circular nozzle consisting of a floating metallic Seal Ring located in the upstream body of the gate, which seals to the upstream face of the gate Leaf. The gate body water conduit expands to a minimum of 1.4 times the inside diameter of the seal ring downstream of the gate leaf. Used for regulating discharge of high-pressure water to atmosphere or a lower pressure body of water. Also referred to as gate in these specifications.
H. Motor Operator: An electromechanical device that uses an electric motor connected to a gear train to produce rotary or linear motion. Also referred to as operator, electric actuator, electric motor operator, electric motor actuator or actuator.
35 22 25 - 5
I. Professional Engineer: An individual licensed by examination, meeting educational and experience requirements, and registered in one of the 50 States of the United States, the District of Columbia, or a United States Territory to practice engineering.
J. Total Head: The total of the static head and dynamic head at the point immediately upstream of the gate leaf at the centerline of the conduit.
1.05 SUBMITTALS
A. Submit the following in accordance with Section C – Description / Specifications Statement of Work (SOW), 1.08 Submittals.
B. RSN 35 22 25-1, Approval Data and Drawings:
1. Post-award on-site Survey Results: Measurements and data collected.
2. General arrangement drawings and assembly drawings showing the JFG, JFG Support and anchorage to existing concrete, Pipe Spool, and appurtenances specified herein and their locations within the Control House:
a. Drawings and information submitted shall incorporate field measurements taken during the site survey.
b. Include adequate details on drawings to demonstrate conformance with the requirements specified herein.
c. Drawings shall bear the stamp of a Professional Engineer.
3. Calculations and analysis:
a. Design calculations for the JFG, JFG Support, JFG Support anchors to existing concrete, and Pipe Spool demonstrating adequate strength and rigidity in accordance with these specifications:
1) Calculations shall bear the stamp of a Professional Engineer.
b. Motor Operator sizing calculations:
1) Detailed calculations.
2) Datasheet provided to Motor Operator manufacturer with information recommended to be included to actuator manufacturer in accordance with AWWA C542.
c. Electrical heat freeze protection sizing calculations.
4. Motor Operator Approval Data and Drawings:
a. Motor Operator data in accordance with the stipulations in Section 4.2 of AWWA C542 – “Data to Be Furnished by Actuator Manufacturer”, and the following:
1) Locked-rotor torque: foot-pounds.
2) Full-load torque: foot-pounds.
35 22 25 - 6
3) Time rating: minutes.
4) Diagram(s) of internal actuator circuitry and added options.
5) If not integral to actuator, diagram(s) of motor starter.
6) If not integral to the Motor Operator, starter information showing electrical characteristic as well as NEMA size per NEMA ICS 2.
b. Equipment Nameplate Drawing: Show motor and Motor Operator nameplate.
c. Motor Operator assembly, installation, operation, short term-storage, long-term storage, shipping, and handling instructions.
5. Product Data:
a. For all products, complete product data including manufacturer’s name, type, model, size, specification, and dimensions. Include technical data and procedures demonstrating conformance with the requirements specified herein.
C. RSN 35 22 25-2, Shop Drawings and Qualifications:
1. Drawings of JFG and appurtenances for manufacture indicating the size, finish, and tolerances for all features of each part, weldment, and assembly. Indicate materials of construction and calculated weight for all parts of each weldment, part, and sub-assembly that will be placed in its final installed location in a single step of the installation procedure.
2. Drawings of JFG Support and attachment to existing concrete.
3. Raw casting drawings indicating the size, finish, and tolerances for all features of each part. Indicate material of construction, and production method.
4. Shop assembly drawings with a list of all parts including hardware with materials of construction listed.
5.…