SOW Nr. 3 SSDG Exhaust Piping Renew JAm.pdf

PDF 240 KB Posted

Attached to
USCGC James Exhaust Piping Renew
Solicitation number
70Z08525Q0020182
Issued by

About this file

This Statement of Work (SOW) details requirements for renewing exhaust piping on the USCGC James, a US Coast Guard vessel. The work involves replacing two segments of the Nr. 3 Ships Service Diesel Generator (SSDG) exhaust trunk piping and installing new lagging (insulation) at the Federal Law Enforcement Training Center in Charleston, SC. The contract period is from 15 July 2025 through 30 July 2025, with the contractor performing repairs while the vessel is docked at the pier.

Key technical requirements include conducting welding repairs in accordance with Surface Forces Logistics Center Standard Specifications, performing non-destructive evaluation (NDE), preventing seawater intrusion during repairs, and installing high-temperature insulation. The contractor must coordinate with the Engineering Officer, LTCDR Andrew Moeller, and take protective measures to ensure safety. Points of contact include CWO Matthew Temple (Asset Manager) and LTCDR Andrew Moeller (Engineer Officer). Base access requires a valid US driver's license, no felony convictions, and will be sponsored by a Coast Guard representative.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs for

Coast Guard vessels performed by commercial contractors at USCG Facilities.

2. REFERENCES

COAST GUARD DRAWINGS

None.

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire

Prevention and Response

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and

NDE in accordance with SFLC Std Spec 0740.

3.3 Fire Prevention. The Contractor must submit a Fire Prevention Plan in accordance with paragraph 3.1 of SFLC Standard Spec 5550. Coordinate with Port Engineer and submit to upon contract award.

3.3.1 Fire Watch. The Coast Guard will provide fire watch personnel and equipment.

3.4 Period of Performance. The period of performance for this work is 15 July 2025 through 30 July

2025.

3.5 Location. The Contractor must perform the work while the USCGC JAMES is alongside the pier at the Federal Law Enforcement Training Center (corner of S. Hobson Ave and Chaffe St), Charleston, SC

29405.

3.6 FLETC Base access is required. Vendor must have a valid US driver’s license and show identification. Contractors working on this project must not have felony convictions. Forms will be provided for base access. A CG representative from the cutter will sponsor and escort vendor to the cutter.

S25_000_23410_BJA_0625_754

WORK ITEM 1: Nr. 3 SSDG Exhaust Piping, Renew

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to renew a section of the exhaust trunk piping and install lagging for the Nr.3 Ships Service Diesel Generator. See Figure 1 for a picture of the exterior of this trunk.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements

Coast Guard Drawing 750-WMSL-100-041, Rev H, Unit 3220 Structure 1st Platform to 2nd Deck

– FR 76 to 88

Coast Guard Drawing 750-WMSL-508-001, Rev C, Piping and Machinery Insulation Schedule and L/M

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec

0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

• Deck plating/grating

• Piping

• Piping Supports

3.1.5 Gas Free. The Contractor must certify and maintain work area to a condition ‘Safe for Hotwork’ in accordance with Surface Forces Logistics Center Standard Specification 0000 paragraph 3.3.

3.1.5.1 The affected piping is in the Central Storeroom, 1st Platform, Frame 77.

3.1.6 Fluid handling. The Contractor must remove and dispose of removed fluids from the affected piping system and any cleaning fluids, in accordance with all applicable Federal, state, and local regulations and

SFLC Std Spec 0000.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition.

3.3 Piping Repair. The Contractor must renew damaged sections of the exhaust trunk shown in Detail

13B-4A of CG Drawing 750-WMSL-100-041.

3.3.1. All welding repairs must be conducted in accordance with SFLC Std Spec 0740. NDE must be in accordance with SFLC Standard Spec 0740 Appendix C, and a form of NDE in addition to visual inspection must be used. If a build-up weld is used to repair this elbow, then Paragraph C2.4.3 must be followed.

3.3.2. For bidding purposes, assume that two segments of this exhaust trunk will need to be renewed.

3.3.3. The Contractor must notify the Engineering Officer (LTCDR Andrew Moeller, Andrew.W.Moeller@uscg.mil) when all surface preparation is complete and they are ready to start the repair PRIOR to conducting any of the repairs.

3.3.4. This elbow is only about a foot off the waterline, so wave action can cause seawater to enter the elbow. The Contractor must take whatever measures are necessary to prevent this inflow of water from causing a safety hazard and/or damaging the weld.

3.4 Insulation. The Contractor must install new lagging over the entire elbow shown in Detail 13B-4A of

CG Drawing 750-WMSL-100-041 in accordance with CG Drawing 750-WMSL-508-001 Sheet 25. Any of the insulation options rated for 400 degrees F or above may be used at the Contractor’s discretion.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.5 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.

3.6 Touch-up preservation. The Contractor must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, (Touch-ups and minor coating repairs.)

3.6 Release of References. For any listed references to be distributed, the Contractor must request the document from the listed point of contact (POC) for this work.

3.7 Points of Contact. The USCG Technical POCs for this requirement include but are not limited to the following:

3.7.1 SFLC-LREPL Asset Manager, (CWO Matthew Temple, matthew.temple@uscg.mil),

3.7.2 SFLC-LREPL Engineer Officer, (LTCDR Andrew Moeller, Andrew.W.Moeller@uscg.mil)

4. NOTES

FIGURE 1 – ELBOW WITH ISSUES

File details come from the government source that posted it. Updated .