SOW_North_Unit_White_River_NWR.pdf

PDF 181 KB Posted

Attached to
GAOA - White River NWR North Unit Gravel Delivery
Solicitation number
140F0822Q0011
Issued by

About this file

This request for proposal outlines requirements for a gravel delivery contract to support infrastructure projects at the Dale Bumpers White River National Wildlife Refuge in Arkansas. The U.S. Fish and Wildlife Service seeks approximately 690 tons per day of granite base SB-2 gravel between July and October 2022 for delivery to multiple locations within the refuge's North Unit area. Bidders must provide weight tickets with each load and spread materials tailgate at the designated sites. The contract will be awarded using lowest price technically acceptable criteria. Interested parties should direct any questions to the listed project coordinator at the phone number and email provided.

View the file

Other files

File Type Posted
Sol_140F0822Q0011_Amd_0002.pdf PDF
Questions_and_Answers_Amendment_2_0002.pdf PDF
Sol_140F0822Q0011_Amd_0001.pdf PDF
Revised_Price_Schedule_0001.pdf PDF
Drawings-Specs_North_Unit.pdf PDF
Price_Schedule.pdf PDF
Sol_140F0822Q0011.pdf PDF
Notice_to_Offerors.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

for

Granite Base SB 2 GRAVEL At The

Dale Bumpers White River National Wildlife Refuge South Atlantic-Gulf & Mississippi Basin Region

January 24, 2022

1. BACKGROUND

a. The U.S. Fish & Wildlife Service would like to procure SB 2 gravel for the of the North Unit Area at Dale Dumpers White River National Wildlife Refuge to support the Great American outdoors act (GAOA).

2. GENERAL INFORMATION

a. All Material must be delivered to the Dale Bumpers White River Refuge at various locations on the southeast side of the refuge. The North Unit area. (See Map).

b. Method of Documentation of Acceptance:

- Weight tickets for each load.

c. See attached Map for Levee Loop Delivery Location.

d. Period of Performance: July 11, 2022 – October 30, 2022

e. Contract requirement: 690 tons of gravel per day to the site.

f. Each load will be delivered to the location specified in the map and tailgate spread by the Contractor.

g. This is a very remote site and how long it will take to deliver 690 tons per day needs to be taken into careful consideration.

h. Lowest Price Technically Acceptable will be used for this contract.

i. Spec for Materials:

j. granite Base (SB-2) 1 ½” minus with fines.

k. materials samples must be approved before delivery.

The FWS Project Manager for this project is David McCaghren. Any questions regarding the scope of work and technical matters shall be directed to:

David McCaghren, MAT Project Coordinator U.S. Fish and Wildlife Service Infrastructure Management Branch Telephone: (256) 642-5417 Email: David_mcCaghren@fws.gov

****END STATEMENT OF WORK****