SOW New Deck Crane.pdf

PDF 107 KB Posted

Attached to
REPLACEMENT OF CRANE ON RESEARCH VESSEL AUK
Solicitation number
1305M2-23-Q-01372
Issued by

About this file

This statement of work outlines requirements for a new deck crane for a NOAA research vessel. The contractor must provide a knuckle-boom crane with a 660 pound safe working load at 17 feet, three hydraulic and one manual extension, powered hydraulic rotation, a 3,000 pound planetary winch with 75 feet of line, a four-function hydraulic control valve, and black marine grade paint. The crane must be delivered assembled to NOAA SBNMS in Scituate, MA between September 20, 2023 and August 30, 2024. The related federal contract opportunity is solicitation number 1305M2-23-Q-01372 for replacement of the crane on the NOAA research vessel AUK, issued by the Department of Commerce National Oceanic and Atmospheric Administration.

View the file

Other files

File Type Posted
DOL WD No. 2015-4047 Rev No. 24 dated 06-30-23.pdf PDF
CONTRACT CLAUSES.pdf PDF
Past Performance Reference Sheet.pdf PDF
Combined-Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work – New Deck Crane NOAA Research Vessel AUK

REVISION B 6-26-23

A] GENERAL INFORMATION:

1] This Statement of Work contains the requirements for a new deck crane on the NOAA Research Vessel AUK, hull number R5001.

2] The general characteristics of the vessel are as follows:

Length: 50 feet Beam: 19 feet Draft: ~5.1 feet Displacement: ~25 long tons

3] The crane will be assembled at the contractor’s facility, and delivered to NOAA SBNMS in Scituate MA. The period of performance is:

September 20, 2023 through August 30, 2024

4] All work performed under this SOW shall meet or exceed all current requirements of ABYC and USCG (Subchapter T) as applicable to this size and type of vessel, in addition to any specific requirements stated below.

5] All work performed on the vessel shall be accomplished as described below unless alternatives are presented in writing BEFORE the work commences, and are agreed to by NOAA. Any work that does not adhere to the descriptions shall be redone at the contractor’s expense within the defined period of performance.

B] SPECIFIC WORK TASKS

1] Provide deck crane Provide one (1) each new and unused crane (Morgan 200.3 or equal) meeting the following minimum requirements:

a) Safe working load and maximum reach; 660# @ 17-1” (with one manual extension)

b) Knuckle-boom design with three hydraulic and one manual extension.

c) Powered hydraulic rotation, 360 degrees, non-continuous.

d) Planetary winch, 3,000 lbs pull, 75' of 3/8” Spectra line, safety hook.

e) Four-function hydraulic control valve with hoses to crane.

f) Paint, marine grade, black.

g) Weight not to exceed 595 pounds.

h) Safe working loads clearly labeled on the equipment.

i) Stowage cover, Sunbrella weather and UV resistant fabric (or equal), black.

j) Crane delivery within Scituate MA 02066 at the direction of NOAA staff.

C] OTHER INFORMATION

1] IT Security Requirements The Certification and Accreditation (C&A) requirements of 48 CFR 1352.239-73 do not apply, and a Security Accreditation Package is not required. The Contractor will not be accessing US government computers or IT systems for this effort. The Contractor will not be accessing any information that is not within the public domain for this effort. The contractor will not be processing, transmitting or storing privileged access information (i.e., non-public) in carrying out the tasks of this contract.

Statement of Work – New Deck Crane
NOAA Research Vessel AUK
REVISION B 6-26-23
A] GENERAL INFORMATION:
1] This Statement of Work contains the requirements for a new deck crane on the NOAA Research Vessel AUK, hull number R5001.
2] The general characteristics of the vessel are as follows:
Length: 50 feet Beam: 19 feet
Draft: ~5.1 feet Displacement: ~25 long tons
3] The crane will be assembled at the contractor’s facility, and delivered to NOAA SBNMS in Scituate MA. The period of performance is:
September 20, 2023 through August 30, 2024
4] All work performed under this SOW shall meet or exceed all current requirements of ABYC and USCG (Subchapter T) as applicable to this size and type of vessel, in addition to any specific requirements stated below.
5] All work performed on the vessel shall be accomplished as described below unless alternatives are presented in writing BEFORE the work commences, and are agreed to by NOAA. Any work that does not adhere to the descriptions shall be redone at the c...

File details come from the government source that posted it. Updated .