Scope:
TITLE: SSN 688 Class submarine Ship’s Service H.P. Air Compressors
1. Location of work: Norfolk Naval Shipyard (NNSY) Inside NNSY waterfront Controlled Industrial Area; DRY DOCK 3.
2. Reference:
2.1 OPNAVINST 5100.23G
2.2 Federal Specification RR-C-271D
2.3 Tech Manual: S6220-CQ-MMO-A10
2.4 DR Engr Std 99,053-26
2.5 A&I N3581 Approval for MIL-DTL-32353A Synthetic Oil use in High Pressure Air
Compressors (HPAC’s) in SSN-688 Class Submarines
2.6 SSN 688 CLASS SUBMARINE Availability Work Package SWLIN 513A01 – Line
Item: 39.0040.2222; Line Item 40.1080.2222
2.7 Gov’t Services Quote # N4215822QS056
2.8 UIPI: 0730-902 Revision B, Release 2
2.9 FY-22 STANDARD ITEMS
2.10 042-05-001 General Requirements for Work on Submarines for Norfolk Naval
Shipyard (NNSY) Depot Level Availabilities; accomplish
2.11 042-11-001 General Occupational Safety, Health and Environment (OSHE)
Requirements for Work within Norfolk Naval Shipyard; accomplish
2.12 042-22-001 General Requirements for Work Within Norfolk Naval Shipyard (NNSY);
accomplish
2.13 042-26-001 Security Requirements for Work Within Norfolk Naval Shipyard (NNSY);
accomplish
2.14 042-28-001 Special Requirements for Non-SUBSAFE Work On Submarines;
accomplish
2.15 042-89-001 General Radiological Requirements for Nuclear Powered Submarines
Within Norfolk Naval Shipyard (NNSY); accomplish
2.16 DWG 200134AE, REV. B, H.P. Air Compressor Class AA
3. General Specifications:
3.1 Accomplish the requirements of 009-90 of reference 3.9.
3.2 Technical Representative is to perform removal of the #1 and 2 HPAC’s, Class AA of reference 3.16 onboard the SSN 688 Class submarine SSN 765.
3.3 Technical Rep. is to perform a replacement of the #1 and 2 HPACs, Class AA of
3.16 onboard the SSN 688 Class submarine SSN 765. To be accomplished after the HPAC units have been removed.
3.4 Accomplish the requirements of 009-09 of reference 3.9 for removal and replenishment of system fluids.
3.5 Perform operational testing/troubleshooting of the installed units to verify satisfactory operation.
4. Contractor Requirements:
4.1 Travel to jobsite and meet with Point Of Contact: TBD and Project Manager: TBD
4.2 Contractor to perform replacement of the #1 & #2 HPACs onboard the SSN 688
Class submarine SSN 765.
4.2.1 Contractor to perform removal of SSN-HPAC onboard the SSN 688 Class submarine SSN 765.
4.2.2 Unit(s) to be removed will be loosely reassembled and boxed in existing crate.
4.3 Contractor to perform installation, test and synthetic oil replacement of the #1 & #2 HPAC’s onboard the SSN 688 Class submarine SSN 765.
4.3.1 Contractor to install Advanced Equipment Repair Program (AERP) assets provided as GFM. To be accomplished after the HPAC units have been removed.
4.3.2 NNSY will perform A&I N3581 Approval for MIL-DTL-32353A Synthetic Oil use in High Pressure Air Compressors (HPACs) in SSN-688 Class Submarines, including stowage of spare parts and posting of warning signs per reference 3.5.
Per reference 3.5, NNSY will provide the Contractor with synthetic oil for #1 and #2 HPACs.
4.3.3 Debug and conduct a shipboard operational test of the units installed to verify tightness of all disturbed joints.
4.3.4 Provide and install calibrated relief valves, gauges, and switches as necessary.
4.3.5 Fabricate and install the DIM pads/mounts IAW reference 3.8.
4.4 All work to be performed IAW OEM specifications (DR Engr Std 99,053-26).
4.5 Contractor to perform all mechanical services within the compressor envelope and will assist with rigging and electrical services required to perform change out of unit.
All work to be performed IAW OEM specifications (DR Engr Std 99,053-26).
5. Government Responsibility:
5.1 Provide pier access for company vehicles to drop off and load tools and equipment at NNSY, on the SSN 688 Class submarine Project.
5.2 Provide crane/rigging/forklift services as required to load/unload tools and equipment from vehicles pier side to boat.
5.3 Provide services to remove, dispose, and replenishment of systems fluids.
5.4 Provide services to isolate and operate equipment when requested by the contractor.
5.5 Provide assistance to meet requirements for any required MOA/WAF required.
5.6 All electrical connections and disconnections aboard the submarine are the responsibility of NNSY or Ship’s Force.
5.7 Provide necessary security requirements, see Points of Contact below.
6. Points Of Contact:
6.1 WIM (Work Integration Manager): TBD
6.2 Certifying Official (PEPM): TBD
6.3 Technical Point of Contact: TBD
7. Safety/Security Requirements:
8.1. "Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements OSHE OSHECM Chapter Hazardous Energy Control (HEC) requirements or safety requirements for site specific location of the contract.
a. Contractor must enroll and acquire RAPIDGate access. The RAPIDGate Program credential conforms to NIST and FIPS requirements and offers a variety of read/verification options that include a magnetic strip, barcode, biometric fingerprint, PIN code, and program participant photo.
b. Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard (NNSY) cognizance must adhere to Federal OSHA requirements for hazardous energy control IAW 29 CFR
1915.89 and must follow Hazardous Energy Control (HEC) procedures as identified in NAVSEA’s Occupational Safety, Health, and Environment Corporate Manual (OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract. All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Point of Contact be informed of the change/deviation. Appendix 250.B-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags-Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number. HEC lock name labels and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out.
OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.
c. Contractors and NNGAs may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the OSHA 1915.89 web site by using the following link to NNSY’s public access web site:
http://www.navsea.navy.mil/shipyards/norfolk/default.aspx
d. Names and contact information for NNSY LOTCs and/or the Building Monitor will be provided by NNSY TPOC and/or CORs set forth elsewhere in this award document.
8.2 Security, Badging, and Access Requirements
a. For this task order, all ELINs require yellow badging.
b. All yellow badge contractor personnel shall have a Final Confidential security clearance. Yellow badge personnel will require access to Nuclear Areas, Nuclear information, Nuclear equipment, Naval Nuclear Propulsion Information (NNPI), Restricted Data (RD), and Not Releasable to Foreign Nationals (NOFORN) data due to the nature of the work being performed on Naval Nuclear propulsion systems. Systems include but are not limited to Main Steam, Main Feed, Main Engine, Reactor Plant, and High Pressure Air. Yellow badge is necessary for the execution of non-nuclear work; inclusive of the propulsion plant and inclusive of nuclear primary and secondary spaces and systems. Inspection and Required Conditions of Propulsion Plant Systems (Non-