STATEMENT OF WORK

MXDP 10-1002 Repair Deer Fence Clear Zone Area 23 Feb 2022

Statement of Work

Project Name: Repair Deer Fence Clear Zone Area

Project Number: MXDP 10-1002

Project Location: Laughlin AFB, TX

Date: 23 February 2022

TABLE OF CONTENTS

1.0 INTRODUCTION

2.0 DESCRIPTION OF WORK

3.0 DESIGN

4.0 FENCE POSTS

5.0 EXISTING GATES

6.0 CHAIN LINK FENCE

7.0 SPEED HUMPS AND SWALE

8.0 ADDITIONAL INFORMATION

9.0 CONSTRUCTION AREA

10.0 KICK OFF/PRE-CONSTRUCTION MEETING

11.0 PERIOD OF PERFORMANCE

12.0 DELIVERABLES

13.0 INSPECTIONS

14.0 CONTRACT ADMINISTRATION / POINTS OF CONTACT

15.0 ATTACHMENTS

MXDP 10-1002 Repair Deer Fence Clear Zone Area 23 Feb 2022

1.0 INTRODUCTION

1.1 The purpose of this project is to repair by replacement portions of the existing

Airfield Security Fence, A.K.A. “Deer Fence” in the clear zone area of the airfield at Laughlin Air Force Base (LAFB). The existing fence is comprised of wooden and metal posts with areas having metal hog wire, chain link fencing fabric and barbed wire. The total length of the fence is approximately 12,500 linear feet (L.F.) with four (4) existing gates for vehicle access and two (2) existing gates for pedestrian access. The intention of this fence is to prohibit deer, rabbits, hogs, and other animals from accessing the airfield pavements. In its current state, the fence does not reduce the airfield incursions by terrestrial wildlife. The Contractor will replace the areas of fencing identified, retrofit existing gates, and improve existing fencing areas as identified in this Statement of Work (SOW).

1.2 Within the below documents, the following shall be consistent. When “the Government” is mentioned, it is a representation of, but is not limited to, the following: the Project Manager (PM), and the Contracting Officer (CO). When “the Contractor” is mentioned, it is a representation of: the prime Contractor, all sub- Contractors, and all other parties working with/for the prime Contractor.

2.0 DESCRIPTION OF WORK

2.1 The work under this contract shall consist of furnishing all labor, materials, tools, equipment, transportation, and all other incidentals necessary to complete the work outlined within this (SOW) and drawings.

2.2 The work shall consist of, but is not limited to, demolition of fence as identified, removal of existing fence posts that are less than 8’-0” in height as identified in Attachment I, Drawings, provide a design for the new fence, and install the new fence no less than 9’-0” in height as outlined in Attachment I, Drawings. Contractor shall provide shop level drawings, product data, and other submittals as outlined in Attachment F, Schedule of Material Submittals for Government approval based on description of work. Contractor is also responsible for the preparation of grounds and installation of speed bumps under the existing gates as identified in this SOW and Attachment I, Drawings. Work shall also include shop level design drawings of the new fence for CO approval. The Contractor shall provide all other incidental work that is required for project completion.

2.3 Contractor shall remove fence/gate posts and replace as identified in Attachment I, Drawings with new gate posts and twin line post with structural members.

2.4 During construction, openings in the fence cannot be left unattended. The Contractor shall leave the fence identified for demolition intact until the new fence has been installed and approved by the CO.

2.5 Temporary fencing shall be required for any openings in the fence while the Contractor is not actively working in the area and approved by the CO to have the capability to deter terrestrial wildlife.

MXDP 10-1002 Repair Deer Fence Clear Zone Area 23 Feb 2022

2.6 Contractor shall be responsible for temporary removal and replacement of existing concrete traffic barriers in order to complete the SOW if present.

2.7 Contractor shall repair or replace roadways that were damaged as a result of Contractor negligence.

2.8 Contractor shall be responsible to contact, LAFB United States Department of Agriculture (USDA) representative and Wing Safety to report terrestrial critters trespassing onto the airfield on sections of the fence under construction by the Contractor. USDA telephone number is (432)238-2362 and Wing Safety telephone number is (830) 298-5975.

2.9 All Government provided figures and drawings are considered approximations and the Contractor shall be required to verify all measurements before material is purchased or cut.

2.10 Contractor shall provide Concrete Mix Design Data, Concrete Mix Design Test Report, Concrete Compressive Strength Test Report, Concrete Slump Test Report, Concrete Water Test Report, and Testing Laboratory Accreditation per concrete truck.

3.0 DESIGN

3.1 See Attachment I, Drawings and Attachment H, UFGS 32 31 13.53 High Security

Fences and Gates for project layout and conceptual design.

3.2 Applicable design and construction codes are as follows:

3.2.1 AFI 91-212, Bird/Wildlife Aircraft Strike Hazard (Bash) Management Program, 31 May

2018.

3.2.2 UFC 1-200-01, DoD Building Code.

3.2.3 UFC 3-120-01 Design: Sign Standards.

3.2.4 UFC 2-100-01 Installation Master Planning

3.2.5 UFC 3-535-01 Visual Air Navigation Facilities

3.2.6 UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings.

3.2.7 UFC 4-022-03, Security Engineering, Fences, Gates and Guard Facilities, August 2007 as

Attachment G.

3.2.8 Federal Highway Administration (FHWA) Manual of Uniform Traffic Control Devices

(MUTCD)

3.2.9 Surface Deployment and Distribution Command transportations Engineering Agency

(SDDCTEA) Pamphlet 55-15

3.2.10 Surface Deployment and Distribution Command transportations Engineering Agency

(SDDCTEA) Pamphlet 55-17

3.2.11 Surface Deployment and Distribution Command transportations Engineering Agency

(SDDCTEA) DoD supplement to the MUTCD

4.0 FENCE POSTS

MXDP 10-1002 Repair Deer Fence Clear Zone Area 23 Feb 2022

4.1 See Attachment I, Drawings and Attachment H, UFGS 32 31 13.53 High Security Fences and Gates.

4.2 The Contractor shall design and install new 8’-0” high from natural grade fence posts as identified in the SOW and conceptual drawings. Purpose of the fence posts are to control entry into the airfield area therefore proper spacing at the fence posts are critical to deter animals from entry. Post spacing shall not exceed 10’-0” O.C.

4.3 The new fence posts shall be set in concrete and a minimum height of 8’-0” from natural grade, see Attachment I, Drawings and Attachment H, UFGS 32 31 13.53 High Security Fences and Gates, for concrete specifications and layout.

4.4 Contractor shall install single extension arm detail with three (3) strands of barbed wire on top of fence posts to achieve minimum fence height of 9’-0” above natural grade, reference drawing UFC 701 of Attachment G, UFC 4-022-03, Security Engineering, Fences, Gates and Guard Facilities, August 2007.

4.5 Existing fence posts, fencing transition posts and fencing sections identified to be reused shall be retrofitted to meet the minimum height of 8’-0” and the design criteria set forth in Attachment I, Drawings and Attachment H, UFGS 32 31 13.53 High Security Fences and Gates.

5.0 EXISTING GATES

5.1 See Attachment I, Drawings and Attachment H, UFGS 32 31 13.53 High Security

Fences and Gates for specifications.

5.2 Contractor shall remove the existing fencing fabric on all gates with the specified chain link fence fabric in UFGS 32 31 13.53, section 2.1.1 Fence Fabric. Fencing fabric shall be fastened per UFGS 32 31 13.53, section 3.2.5 Fabric.

5.3 Contractor shall provide Gate B with a new Fulcrum gate latch, see Attachment I, Drawings for the conceptual design and Attachment H, UFGS 32 31 13.53 High Security Fences and Gates for specifications.

6.0 CHAIN LINK FENCE

6.1 Contractor shall design and install 8’-0” high chain link fence, approximately 12,500

L.F per Attachment G, UFC 4-022-03, Security Engineering, Fences, Gates and Guard Facilities, August 2007.

6.2 See Attachment I, Drawings for locations/conceptual design and Attachment H, UFGS 32 31 13.53 High Security Fences and Gates for specifications.

7.0 SPEED BUMPS AND SWALE

7.1 See Attachment I, Drawings for speed bump locations/conceptual design and

Attachment H, UFGS 32 31 13.53 High Security Fences and Gates for specifications.

7.2 The Contractor shall design and install speed bumps under the existing vehicular and pedestrian gates as identified in the SOW and drawings. The purpose of the speed bumps is to diminish the space between the bottom rail of the gate and the ground, avoid erosion, and deter animals from digging under the gates.

MXDP 10-1002 Repair Deer Fence Clear Zone Area 23 Feb 2022

7.3 Spacing from bottom rail and top of speed bump shall not exceed one (1) inch in height.

7.4 The speed bumps shall be concrete, see Attachment I, Drawings for the conceptual design and Attachment H, UFGS 32 31 13.53 High Security Fences and Gates, for specifications. There are a total of four (4) gates that will require speed bumps installed.

7.5 See Attachment I, Drawings for swale location, conceptual design, and specifications.

7.6 Contractor shall provide a clean out gate at swale to reduce erosion along the existing fence line.

7.7 Fencing at swale shall consist of retrofitting existing posts, fencing and cleanout gate. Approximate span of entire swale is 33”-0” L.F. Approximate height of deepest point of swale is 18”.

7.8 Contractor shall design and install a cleanout gate, see Attachment I, Drawings for locations and conceptual design. Approximate length is 55’-0” L.F.

8.0 ADDITIONAL INFORMATION

8.1 Contractors are urged to attend a pre-proposal site visit to determine the actual quantities required for the work identified in the SOW and to determine in-place conditions that shall affect the quantities in the delivery order.

8.2 All personnel that will be driving to and from the project site during construction will need to attend an Airfield Driver Training. This training is approximately one

(1) hour and shall consist of a PowerPoint presentation and a familiarization ride.

The date and time of the training shall be coordinated through the Contracting Officer but shall occur during normal business hours. The Contractor shall make every effort have all drivers present at the same time as the number of briefings shall be kept to a minimum. If the Contractor intends to use heavy equipment when working with in the Airfield perimeter fence, they will have to file an airfield waiver through the CO.

8.3 Since work may require the Contractor to be on Laughlin’s airfield, the Contractor shall submit Attachment C, Blank FAA Form 7460-01. For information on the purpose of this form and instructions on how to fill it out, refer to Attachment D, Division 01 Specifications, section 14.

8.4 There are various signs installed along the fence and gates. Contractor shall be responsible for removing, properly storing to prevent damage, and re-installing the signs prior to final acceptance.

8.5 Controlled Area Signs: Spacing for 30”x36” Controlled Area Signs along entire fence line shall not exceed 100’-0” between signs. Signs shall be mounted with wire ties a specified in Attachment H, UFGS 32 31 13.53 High Security Fences and Gate, section 2.2.1.1 Wire Ties.

8.6 The Contractor shall submit a Work Clearance Request no less than thirty (30) days prior to construction to the CO. See Attachment J, Work Clearance Request Form for

MXDP 10-1002 Repair Deer Fence Clear Zone Area 23 Feb 2022 reference.

8.7 The Contractor shall provide bi-weekly progress meeting with CO and all stakeholders once NTP #1 is issued. Contractor shall provide at this meeting to updated the current construction schedule, progress schedules, and provide weather delay information as it occurs. Contractor is responsible to provide meeting minutes to CO. The Contractor shall complete Environmental Management System Awareness training by reviewing Attachment B, Appendix B, of the Environmental Construction Technical Specifications.

8.8 All work on this project shall be accomplished in accordance with the general Attachment D, Division 01 Specifications, Attachment B, Environmental Construction Technical Specifications, and applicable Air Force, federal, state, and local regulations/codes referenced in the cited sources.

8.9 Photos of existing conditions can be found in Attachment A, Existing Photographs.

8.10 Contractor shall remove and properly dispose of all project debris, wooden posts, and metal fence/accessories at an off-base location.

8.11 Remove all debris on a daily basis due to foreign object damage (FOD). Strictly monitor and control dust and debris due to its impact on aircraft safety. Failure to properly control dust and debris, or to respond to any requests to do so, will result in construction activities being stopped and an analysis and plan of action required of the contractor to implement control of the FOD. Submit a FOD Control Plan prior to beginning work.

8.12 Areas touched by Contractor shall be left rock free (2 inches and larger) and disposed off base for project acceptance to ensure mowing and BASH requirements are followed.

8.13 Contractor shall repair any damage to the property caused by the Contractor to match pre-construction site conditions (including ruts) at no cost to the Government.

8.14 Contractor may request a laydown yard from the CO. Laydown must be brought back to it’s the original state.

8.15 Proper airfield fencing reduces airfield incursions by terrestrial wildlife. The best procedure for keeping large mammals off the airfield is an adequate fence. An 8-foot chain link fence with 3-strand barbed outriggers and secured at the ground will keep most mammals off the airfield. A four (4) foot skirt of chain link fence material, attached to the bottom of the fence and buried at a 45 degree angle on the outside of the fence will prevent animals from digging underneath, while reducing washouts. Rebar offers a cost effective solution when patching gaps under a fence to prevent wildlife from entering the airfield. Heavy gravel may be used to armor fence bottoms. Repair fence breaches upon detection.

8.16 Remove vegetation on and along the fence line wherever noted. Maintain a buffer zone free from brushy and woody vegetation on both sides of the security fence where able.

This practice will help maintain the integrity of the fence by allowing easier access for inspection and maintenance as well as discouraging the growth of woody vegetation on

MXDP 10-1002 Repair Deer Fence Clear Zone Area 23 Feb 2022 and through the fence. Contractor shall deliver fence line with no vegetation along fence line at final inspection.

8.17 Inspect all gates with in SOW to ensure proper function. Replace or repair all damaged gates or gates that do not close properly according to 22 AFI91-212 31 MAY 2018.

8.18 Install speed humps under gates to control erosion and reduce gaps outlines in SOW.

8.19 Re-install signs warning of wildlife hazards to flight operations to educate gate users if gates are routinely left unsecured.

8.20 Ensure fences do not violate the airfield clear zones and frangibility rules, in accordance with United Facilities Criteria 3-260-01, Airfield and Heliport Planning and Design.

8.21 Contractor shall provide earthwork to clear new fence line, Area shall be 9’-0” wide and run the entire length of the new fence line which is approximately 12,500 L.F. Clearing shall not disturb existing gates and fence posts that shall remain. Finish grading of cleared fence line shall be void of rocks any larger than 2” and smooth.

8.22 Comply with the OSHA Public Law 91-596, Occupational Safety and Health Act of 1970 and the resulting standards (e.g., 29 CFR 1910, Occupational Safety and Health Standards, 29 CFR 1926, Safety and Health Regulations for Construction), national consensus standards of the United States (e.g., National Fire Protection Association and National Electrical Codes), and all applicable federal, state, local, and Department of Defense, environmental, safety, and occupational health statues, policies, and regulations). It is the SP responsibility to make certain that all safety requirements, equipment, and training are met and provided to their employees. Additionally, the SP is responsible to ensure compliance with safety and health standards by all sub-SP employees. AF Safety, Fire Protection, and Bioenvironmental Engineering officials may periodically enter a SP’s workplace to verify working conditions of personnel or to make inspections for protection of Government facilities, personnel and equipment. If an improper procedure or unsafe condition exists, the SP shall notify the applicable Wing Representative/CO and immediately correct the unsafe condition within 24 hours after occurrence. Department of Labor OSHA inspectors are authorized right of entry to inspect any place of employment operated by an AF SP. They are, for the most part, “NO NOTICE” inspections. Notify the COR if an OSHA inspector visits the site unescorted by an AF Safety Technician.

8.23 Prior to beginning construction, the Contractor must complete the course for OpSec awareness for contractors. The course provides information on the basic need to protect unclassified information about operations and personal information. Contractor must provide proof of OPSEC if completed to CO.

9.0 CONSTRUCTION AREA

9.1 OSHA Standards for construction must be met throughout the construction process. A construction laydown area shall be coordinated and approved during the submittal process and shall comply with Attachment D, Division 01 Specifications, and

MXDP 10-1002 Repair Deer Fence Clear Zone Area 23 Feb 2022

Attachment B, Environmental Construction Technical Specifications. The Government may provide a location of the laydown yard, Contractor must submit request to CO for approval.

10.0 KICK OFF/PRE-CONSTRUCTION MEETING

10.1 47 CONF will host a Kick Off Meeting prior to issuing NTP #1. This meeting will serve to review submittal requirements. The Government will arrange for a suitable meeting room or choose to hold the meeting virtually.

10.2 47 CONF will host a Pre-Construction Meeting prior to issuing NTP #2. This meeting will serve to review construction requirements, schedule, and highlight any issues (review periods, material submittals, etc.). During the meeting, a Government representative will present a complete overview of the project. All necessary base parties will be in attendance. 47 CONF will then go over the contract and clauses as they pertain to the project.

11.0 PERIOD OF PERFORMANCE

11.1.1 This project will require two (2) Notices to Proceed (NTP): NTP#1 for design/submittals/material lead times and NTP#2 for construction.

11.1.2 The NTP for the construction phase will not be issued until the design/submittal/material lead time phase is complete unless otherwise approved by the CO.

11.1.3 Total Period of Performance for project is one hundred five (105) calendar days. The

Period of Performance (PoP) for NTP#1 is sixty (60) calendar days and for NTP#2 is forty-five (45) calendar days for project.

12.0 DELIVERABLES

12.1 Contract Progress Schedule

12.1.1 The Contractor shall submit a signed Progress Schedule Form similar to Attachment E, Progress Schedule Form and Contract Progress Report, depicting an overall breakdown and schedule for the main elements of work for the PoP. For more details see Attachment D, Division 01 Specifications, section 6.1.1.

12.2 Contract Progress Report

12.2.1 The Contractor shall submit a Contract Progress Report similar to Attachment E, Progress Schedule Form and Contract Progress Report every two (2) weeks during construction as described in the Attachment D, Division 01 Specifications, section 6.1.2.

12.3 Submittals

12.3.1 All submittals (Attachment F, Schedule of Material Submittals) shall be sent to the CO for Government review for approval/disapproval. The Contractor shall ensure that no work begins or material/equipment is acquired until submittals for that work or item have been approved. For more details see Attachment D, Division 01 Specifications, section 10.

12.3.2 Contractor shall provide samples for the chain link, posts, ties, latches, and barbed wire

MXDP 10-1002 Repair Deer Fence Clear Zone Area 23 Feb 2022 and as specified in Attachment F, Schedule of Material Submittals.

12.3.3 Contractor shall provide shop drawings for the fence, swale clean out gate and latch as specified with in this SOW and in Attachment F, Schedule of Material Submittals.

13.0 INSPECTIONS

13.1 Pre-Final Inspection

13.1.1 The Contractor shall conduct a pre-final walk-through inspection with base personnel. A pre-final inspection shall not be scheduled if the Contractor has not submitted a draft DD Form 1354, Transfer and Acceptance of Real Property.

13.2 Final Inspection

13.2.1 The Contractor shall conduct a final inspection with base personnel. The inspection shall concentrate on the items identified at the pre-final inspection and recorded as pre-final inspection items (Quality Control Manger punch-list). A final inspection shall not be performed until the pre-final inspection items (Quality Control Manger punch-list) have been resolved. The Contractor shall present a completed DD Form 1354, Transfer and Acceptance of Real Property at the final inspection.

14.0 CONTRACT ADMINISTRATION / POINTS OF CONTACT

14.1 CO, the term used herein, does not include any representative not acting within the scope of his/her authority. Notwithstanding any of the provisions of this contract, the CO shall be the only individual authorized, in any way, to amend or modify the terms of this contract.

15.0 ATTACHMENTS

A. Existing Photographs B. Environmental Construction Technical Specifications C. Blank FAA Form 7460-01 D. Division 01 Specifications E. Progress Schedule Form (similar to AF IMT 3064) and Contract Progress Report (similar to AF IMT 3065) F. Schedule of Material Submittals G. UFC 4-022-03, Security Engineering, Fences, Gates and Guard Facilities, August 2007 H. UFGS 32 31 13.53, High Security Fences and Gates, Feb 2020 I. Drawings, Nov 2021 J. Work Clearance Request Form

1.0 INTRODUCTION
1.1 The purpose of this project is to repair by replacement portions of the existing Airfield Security Fence, A.K.A. “Deer Fence” in the clear zone area of the airfield at Laughlin Air Force Base (LAFB). The existing fence is comprised of wooden and m...
1.2 Within the below documents, the following shall be consistent. When “the Government” is mentioned, it is a representation of, but is not limited to, the following: the Project Manager (PM), and the Contracting Officer (CO). When “the Contractor” i...
2.0 DESCRIPTION OF WORK
2.1 The work under this contract shall consist of furnishing all labor, materials, tools, equipment, transportation, and all other incidentals necessary to complete the work outlined within this (SOW) and drawings.
2.2 The work shall consist of, but is not limited to, demolition of fence as identified, removal of existing fence posts that are less than 8’-0” in height as identified in Attachment I, Drawings, provide a design for the new fence, and install the ne...
2.3 Contractor shall remove fence/gate posts and replace as identified in Attachment I, Drawings with new gate posts and twin line post with structural members.
2.4 During construction, openings in the fence cannot be left unattended. The Contractor shall leave the fence identified for demolition intact until the new fence has been installed and approved by the CO.
2.5 Temporary fencing shall be required for any openings in the fence while the Contractor is not actively working in the area and approved by the CO to have the capability to deter terrestrial wildlife.
2.6 Contractor shall be responsible for temporary removal and replacement of existing concrete traffic barriers in order to complete the SOW if present.
2.7 Contractor shall repair or replace roadways that were damaged as a result of Contractor negligence.
2.8 Contractor shall be responsible to contact, LAFB United States Department of Agriculture (USDA) representative and Wing Safety to report terrestrial critters trespassing onto the airfield on sections of the fence under construction by the Contract...
2.9 All Government provided figures and drawings are considered approximations and the Contractor shall be required to verify all measurements before material is purchased or cut.
3.0 DESIGN
3.1 See Attachment I, Drawings and Attachment H, UFGS 32 31 13.53 High Security Fences and Gates for project layout and conceptual design.
3.2 Applicable design and construction codes are as follows:
3.2.1 AFI 91-212, Bird/Wildlife Aircraft Strike Hazard (Bash) Management Program, 31 May 2018.
3.2.2 UFC 1-200-01, DoD Building Code.
3.2.3 UFC 3-120-01 Design: Sign Standards.
3.2.4 UFC 2-100-01 Installation Master Planning
3.2.5 UFC 3-535-01 Visual Air Navigation Facilities
3.2.6 UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings.
3.2.7 UFC 4-022-03, Security Engineering, Fences, Gates and Guard Facilities, August 2007 as Attachment G.
3.2.8 Federal Highway Administration (FHWA) Manual of Uniform Traffic Control Devices (MUTCD)
3.2.9 Surface Deployment and Distribution Command transportations Engineering Agency (SDDCTEA) Pamphlet 55-15
3.2.10 Surface Deployment and Distribution Command transportations Engineering Agency (SDDCTEA) Pamphlet 55-17
3.2.11 Surface Deployment and Distribution Command transportations Engineering Agency (SDDCTEA) DoD supplement to the MUTCD
4.0 FENCE POSTS
4.1 See Attachment I, Drawings and Attachment H, UFGS 32 31 13.53 High Security Fences and Gates.
4.2 The Contractor shall design and install new 8’-0” high from natural grade fence posts as identified in the SOW and conceptual drawings. Purpose of the fence posts are to control entry into the airfield area therefore proper spacing at the fence po...
4.3 The new fence posts shall be set in concrete and a minimum height of 8’-0” from natural grade, see Attachment I, Drawings and Attachment H, UFGS 32 31 13.53 High Security Fences and Gates, for concrete specifications and layout.
4.4 Contractor shall install single extension arm detail with three (3) strands of barbed wire on top of fence posts to achieve minimum fence height of 9’-0” above natural grade, reference drawing UFC 701 of Attachment G, UFC 4-022-03, Security Engine...
4.5 Existing fence posts, fencing transition posts and fencing sections identified to be reused shall be retrofitted to meet the minimum height of 8’-0” and the design criteria set forth in Attachment I, Drawings and Attachment H, UFGS 32 31 13.53 Hig...
5.0 EXISTING GATES
5.1 See Attachment I, Drawings and Attachment H, UFGS 32 31 13.53 High Security Fences and Gates for specifications.
5.2 Contractor shall remove the existing fencing fabric on all gates with the specified chain link fence fabric in UFGS 32 31 13.53, section 2.1.1 Fence Fabric. Fencing fabric shall be fastened per UFGS 32 31 13.53, section 3.2.5 Fabric.
5.3 Contractor shall provide Gate B with a new Fulcrum gate latch, see Attachment I, Drawings for the conceptual design and Attachment H, UFGS 32 31 13.53 High Security Fences and Gates for specifications.
6.0 CHAIN LINK FENCE
6.1 Contractor shall design and install 8’-0” high chain link fence, approximately 12,500 L.F per Attachment G, UFC 4-022-03, Security Engineering, Fences, Gates and Guard Facilities, August 2007.
6.2 See Attachment I, Drawings for locations/conceptual design and Attachment H, UFGS 32 31 13.53 High Security Fences and Gates for specifications.
7.0 SPEED BUMPS AND SWALE
7.1 See Attachment I, Drawings for speed bump locations/conceptual design and Attachment H, UFGS 32 31 13.53 High Security Fences and Gates for specifications.
7.2 The Contractor shall design and install speed bumps under the existing vehicular and pedestrian gates as identified in the SOW and drawings. The purpose of the speed bumps is to diminish the space between the bottom rail of the gate and the ground...
7.3 Spacing from bottom rail and top of speed bump shall not exceed one (1) inch in height.
7.4 The speed bumps shall be concrete, see Attachment I, Drawings for the conceptual design and Attachment H, UFGS 32 31 13.53 High Security Fences and Gates, for specifications. There are a total of four (4) gates that will require speed bumps instal...
7.5 See Attachment I, Drawings for swale location, conceptual design, and specifications.
7.6 Contractor shall provide a clean out gate at swale to reduce erosion along the existing fence line.
7.7 Fencing at swale shall consist of retrofitting existing posts, fencing and cleanout gate. Approximate span of entire swale is 33”-0” L.F. Approximate height of deepest point of swale is 18”.
7.8 Contractor shall design and install a cleanout gate, see Attachment I, Drawings for locations and conceptual design. Approximate length is 55’-0” L.F.
8.0 ADDITIONAL INFORMATION
8.1 Contractors are urged to attend a pre-proposal site visit to determine the actual quantities required for the work identified in the SOW and to determine in-place conditions that shall affect the quantities in the delivery order.
8.2 All personnel that will be driving to and from the project site during construction will need to attend an Airfield Driver Training. This training is approximately one (1) hour and shall consist of a PowerPoint presentation and a familiarization r...
8.3 Since work may require the Contractor to be on Laughlin’s airfield, the Contractor shall submit Attachment C, Blank FAA Form 7460-01. For information on the purpose of this form and instructions on how to fill it out, refer to Attachment D, Divisi...
8.4 There are various signs installed along the fence and gates. Contractor shall be responsible for removing, properly storing to prevent damage, and re-installing the signs prior to final acceptance.
8.5 Controlled Area Signs: Spacing for 30”x36” Controlled Area Signs along entire fence line shall not exceed 100’-0” between signs. Signs shall be mounted with wire ties a specified in Attachment H, UFGS 32 31 13.53 High Security Fences and Gate, sec...
8.6 The Contractor shall submit a Work Clearance Request no less than thirty (30) days prior to construction to the CO. See Attachment J, Work Clearance Request Form for reference.
8.7 The Contractor shall provide bi-weekly progress meeting with CO and all stakeholders once NTP #1 is issued. Contractor shall provide at this meeting to updated the current construction schedule, progress schedules, and provide weather delay inform...
8.8 All work on this project shall be accomplished in accordance with the general Attachment D, Division 01 Specifications, Attachment B, Environmental Construction Technical Specifications, and applicable Air Force, federal, state, and local regulati...
9.0 CONSTRUCTION AREA
9.1 OSHA Standards for construction must be met throughout the construction process. A construction laydown area shall be coordinated and approved during the submittal process and shall comply with Attachment D, Division 01 Specifications, and Attachm...
10.0 KICK OFF/PRE-CONSTRUCTION MEETING
10.1 47 CONF will host a Kick Off Meeting prior to issuing NTP #1. This meeting will serve to review submittal requirements. The Government will arrange for a suitable meeting room or choose to hold the meeting virtually.
10.2 47 CONF will host a Pre-Construction Meeting prior to issuing NTP #2. This meeting will serve to review construction requirements, schedule, and highlight any issues (review periods, material submittals, etc.). During the meeting, a Government re...
11.0 PERIOD OF PERFORMANCE
11.1.1 This project will require two (2) Notices to Proceed (NTP): NTP#1 for design/submittals/material lead times and NTP#2 for construction.
11.1.2 The NTP for the construction phase will not be issued until the design/submittal/material lead time phase is complete unless otherwise approved by the CO.
11.1.3 Total Period of Performance for project is one hundred five (105) calendar days. The Period of Performance (PoP) for NTP#1 is sixty (60) calendar days and for NTP#2 is forty-five (45) calendar days for project.
12.0 DELIVERABLES
12.1 Contract Progress Schedule
12.1.1 The Contractor shall submit a signed Progress Schedule Form similar to Attachment E, Progress Schedule Form and Contract Progress Report, depicting an overall breakdown and schedule for the main elements of work for the PoP. For more details se...
12.2 Contract Progress Report
12.2.1 The Contractor shall submit a Contract Progress Report similar to Attachment E, Progress Schedule Form and Contract Progress Report every two (2) weeks during construction as described in the Attachment D, Division 01 Specifications, section 6....
12.3 Submittals
12.3.1 All submittals (Attachment F, Schedule of Material Submittals) shall be sent to the CO for Government review for approval/disapproval. The Contractor shall ensure that no work begins or material/equipment is acquired until submittals for that w...
13.0 INSPECTIONS
13.1 Pre-Final Inspection
13.1.1 The Contractor shall conduct a pre-final walk-through inspection with base personnel. A pre-final inspection shall not be scheduled if the Contractor has not submitted a draft DD Form 1354, Transfer and Acceptance of Real Property.
13.2 Final Inspection
13.2.1 The Contractor shall conduct a final inspection with base personnel. The inspection shall concentrate on the items identified at the pre-final inspection and recorded as pre-final inspection items (Quality Control Manger punch-list). A final in...
14.0 CONTRACT ADMINISTRATION / POINTS OF CONTACT
14.1 CO, the term used herein, does not include any representative not acting within the scope of his/her authority. Notwithstanding any of the provisions of this contract, the CO shall be the only individual authorized, in any way, to amend or modify...

15.0 ATTACHMENTS