SOW Mural Heritage Center.pdf
PDF 637 KB Posted
- Attached to
- Amendment 1 Digital Mural at Heritage Center Federal contract opportunity
- Solicitation number
- FA442720Q0078
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 1_Combo.pdf | ||
| Representations and FAR 52.204-25.pdf | ||
| Solicitation Wiltz Sec 889 Template Memo to Contractors.pdf | ||
| Contract Security Clause (Add as Attachement to all Solicitations).pdf | ||
| FAR Case 2019-009.pdf | ||
| Combo_Mural.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) for
Heritage Center/60 AMW
Vietnam Mural Presentation
The Heritage Center has a requirement to educate and enhance knowledge of the military’s proud tradition at Travis AFB. The purpose of the requirement is to raise awareness and develop esprit de corps throughout the local community.
Description: The contractor shall provide all tools, materials, labor needed to accurately depict an active maintenance area within an installation during the Vietnam war era and include the following: a C-141 being unloaded, an F-4 leaving the hanger, and a UH-1 aeromedical aircraft landing near a field hospital. This mural shall be a realistic portrayal with proper shading and dimensions. The mural will be approximately 16 feet tall and 64 feet wide in a U shaped manner. Due to an airplane in the middle of the floor, scaffolding shall be required. Contractor shall provide at no additional cost, one year touch up as requested by Government.
The Government has already primed the wall. Contractor shall perform any additional wall preparations and shall provide all materials to complete mural. The mural shall be digitally printed.
Clean Up: Contractor’s materials and equipment shall be neatly stored and protected at the end of each day. Clean up and removal of all debris, spoil, and waste shall be accomplished at the end of each work day.
Working Conditions: The contractor shall perform work in such a manner as to cause minimum interference to the facility. The contractor shall be responsible for correcting any damage caused by or incidental to, this project.
Hours of Operation: 0830 – 1630 Monday - Saturday
Evaluation: The contractor shall provide the following with quote to determine technical acceptability:
a. 2 of past sketches or examples similar to mural requirement
b. 2 previous artwork via photos similar to mural requirement
c. Sketch or rendering of mural requirement in Description Section
Delivery: Contractor shall finish mural within 6 months after contract award. Mural shall be display ready for immediate viewing.